Download presentation
Presentation is loading. Please wait.
Published byJulianna Hoover Modified over 8 years ago
1
130-Apr-2012 Quality Function Application Services What’s New in SPEED APPS 2.7 ? April 2012
2
230-Apr-2012 SCOPE Scope of this release will cover changes to Project Management LCM SEWF
3
330-Apr-2012 Project Management The High Maturity related procedures were modified to address the gaps identified internally against the CMMI (1.3) Model Measurement Collection Analysis and Storage Procedure - Data analysis procedure and Measurement collection and analysis procedure are merged and revamped to match the current practice Organization Causal Analysis and Resolution Procedure Project Level Causal Analysis and Resolution Procedure Process Performance Baseline Procedure Setting Project Objective Procedure Early Warning Procedure - Changes done to align to the Current Practice Category: Procedure - Modification
4
430-Apr-2012 Project Management High Level Risk Assessment Tool - Modified to the assessment criteria to include AOS and AT specific aspects Category: Tools - Modification Category: Tools - Deletion PPM and M&A QPM Assets - The zip files are removed since individual files are hosted in appropriate places. Approach Alternatives and Recommendation Example 1 & Approach Alternatives and Recommendation Example 2 - Samples for Delivery team’s reference on Decision and Analysis Resolution techniques Category: Examples - Addition
5
530-Apr-2012 Project Management Category: Standards - Modification Work Product Review Standards - Review types (1, 2, 3, 4, 5) are replaced by informal, Peer review and External review with relevant description. - Description on mode of review is documented APPS Business Rules - Modified to update the new review types Category: Business Rules - Modification
6
630-Apr-2012 Project Management H M Tracker - Added this new template that is being used for HM tracking Shift Plan - Shift plan is removed from project plan and hosted separately Project Plan - TOC to include, link to the new sheets added (Resource request, STS Request, Customer supplied items, Admin-Purchase ) Standard SEWF, AOS & AT WBS - Initiate Project sub-activities were added Category: Template - Addition
7
730-Apr-2012 SEWF Requirements Review Checklist - New checklist to aid effective review of requirements document Design Review Checklist - New checklist to aid effective review of Design documents Category: Checklist - Addition Category: Design Templates - Modification High Level and Low Level Design Document - The Design documents were revamped to make improve its effectiveness
8
830-Apr-2012 Others SEPG Guidelines - Updates includes Evaluation frequency and minimum participation requirement from Apps Delivery for the SEPG meeting Category: Guidelines - Modification Quality Strategy & Organization Improvement Strategy - Revised to make it in sync with current practices - Moved under APPS QMS from COMMON QMS Category: Policies & Strategies – Addition Category: Glossaries & Acronyms – Modification Glossaries and Acronyms (both right and left) are revamped
9
930-Apr-2012 C 2011 MphasiS The information contained herein is subjected to change without notice. Thank You PDI Team
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.