07/04/2013 Saint-Petersburg Danilin Aleksey Vladimirovich Patent pending aleksey5danilin@yandex.ru alex5danilin@live.com
2
The lower block of guide blades directs the flow of air upward spiral. Rotor with blades. Upper block of guide blades directs the flow of air on a downward spiral.
3
350 m The 15 MW of power per turbine. The total weight is about 2,000 t. The list price of one unit is 7,500,000€ «The Enercon E-126. The 7.58 MW of power per turbine. The total weight is about 6,000 t. The list price of one unit is 11,000,000€» 125 m
4
500 m 175 m Weight of the rotating in the tower air 13565 tons.
5
2,5 m 1 m The advantages of the new design: 1. Fewer metal - hard binding support reduces the weight of the entire unit. 2. The rotor of a smaller size - rotor operates in the high speed of the output air flow. 3. Less concrete - each rack stands on its own the basis of the small size. 4. The cost of construction of less - the tower is made in the bottom part and rises after the construction of each of the following parts. 5. The generator to the permanent magnet is located on the perimeter of the rotor, which is three times cheaper compared to the generator on the axis. Permanent magnets of the generator are used for magnetic levitation of the rotor.
6
The power of 30 kW The diameter of the installation of 12 m The installation height of 20 m Diameter of rotor 8 m The height of the rotor 1.5 m Tornado category F0 installation creates at a wind speed of 6 m/s The cost of materials and works for the project 25,000€
7
1.To build the first power plant 2.To file an international patent application under the PCT system 3.To promote the world's wind-power station as more reliable, powerful, cheap, inside which, on a par with the wind, the working ascending streams of warm air from low potential energy sources usage, for example, from solar energy in the heat, which allows to align powered with the instability of wind 4.Income from the sale of electricity: one installation of 15 MW gives an income of 375€ per hour. There are no fuel costs
8
Thank you for your attention. Aleksey Vladimirovich Danilin tel. +7 911 210 9140 alex5danilin@live.com Saint-Petersburg, Russia For the formation of a tornado is necessary difference of temperatures of air, which is reduced to a few tens of degrees in a tower height of 500 meters.