Presentation is loading. Please wait.

Presentation is loading. Please wait.

NATIONAL RURBAN MISSION NRuM 1 MINISTRY OF RURAL DEVELOPMENT Integrated Cluster Action Plan Step 3b- Component Profiling May 11 th, 2016.

Similar presentations


Presentation on theme: "NATIONAL RURBAN MISSION NRuM 1 MINISTRY OF RURAL DEVELOPMENT Integrated Cluster Action Plan Step 3b- Component Profiling May 11 th, 2016."— Presentation transcript:

1 NATIONAL RURBAN MISSION NRuM 1 MINISTRY OF RURAL DEVELOPMENT Integrated Cluster Action Plan Step 3b- Component Profiling May 11 th, 2016

2 Cluster Profiling Component Profile Step 3 b

3 Component Profiling Skill Development training Linked to Economic Activities 3 ** Brief analysis and Issues may be included in a brief write up DetailsGram Panchayats Total Existing GP - 1GP - 2GP - 3GP - 4 1Average Income per capita 2Primary source of income 3Skills available- Handicraft/handloom/Industrial etc 4MSME clusters present (Y/N) 5If (Y), above then nos and type of MSME cluster 6Employment generated through 1 above 7Female to Male ratio of employment 8Female to Male ratio of vocational skill engagement 9Traditional/home based Industries present 10Identified needs for skill development 11Agencies involved in skill development/training Total Projected GP - 1GP - 2GP - 3GP - 4 1Projected no of households for 2022 2Projected needs for skill development ( no of hoseholds)

4 Component Profiling Agri-services and Processing 4 ** Brief analysis and Issues may be included in a brief write up DetailsGram Panchayats ExistingGP - 1GP - 2GP - 3GP - 4 1Any Existing agri service centre (Y/N) 2If Y then issues/need for up-gradation 3Any agro-processing industries present (Y/N) 4If Y then details of the same – type-size, scale etc 5Presence of adequate storage & warehousing facilities 6Presence of cold storage facilties 7Predominant agricultural produce 8Issues related to optimum yield 9 Identified additional support infrastructure to improve agri-productivity. 10Presence of mandis/wholesale agri produce markets ( Nos and distance between these mandis)

5 Component Profiling Digital Amenities and Literacy 5 ** Brief analysis and Issues may be included in a brief write up DetailsGram Panchayats Total Existing GP - 1GP - 2GP - 3GP - 4 1 Any existing ICT enabled front end Common Service Centre (Y/N) 2If Y any up-gradation required 3 Connectivity under NOFN/Broad Band connectivity 4Gaps under 3 above ( coverage) 5Coverage under E- Kranti 6 % of households with digital connectivity 7 % of households with at-least one e literate person Total Projected GP - 1GP - 2GP - 3GP - 4 1 Projected no of households for 2022 2Projected needs for digital literacy ( no of households)

6 Component Profiling 24x7 Piped Water Supply 6 ** Brief analysis and Issues may be included in a brief write up DetailsGram Panchayats Existing GP - 1GP - 2GP - 3GP - 4 1Source of water supply ( Ground/Surface) 2Any Treatment Plant facility- type and capacity Any problems with leakages/old piping systems 3Storage Reservoirs-nos and capacity 4Coverage of WS connection (piped) at household level 5No of stand posts and coverage of each stand post ( no of households) 6Per capita availability of drinking water supply 7No of hours of water supply 8Any metering systems available 9Quality of water supply 10Water supply systems of historical/religious significance Projected GP - 1GP - 2GP - 3GP - 4 1Projected no of households for 2022 2Projected water demand for 2022 iProjected capacity of Treatment capacity IiProjected capacity of SR IiiNo of household connections IvProjected water supply network -distribution

7 Component Profiling Sanitation 7 ** Brief analysis and Issues may be included in a brief write up DetailsGram Panchayats Existing GP - 1GP - 2GP - 3GP - 4 1Coverage of households with Individual Toilets 2Any Open defecation 3Existing condition of the IHH Toilets 4Connection with septic tanks 5 Coverage with sewerage systems- type and condition 6 Any sewage treatment plant available-type and condition 7Any alternate systems of treatment being used 8Any recycling facilities available Projections GP - 1GP - 2GP - 3GP - 4 1Projected no of households for 2022 2Requirement of HH Toilets -2022 3Projected need for sewage network 4Projected need of Sewage Treatment Plant

8 Component Profiling Solid and Liquid Waste Management 8 DetailsGram Panchayats Existing GP - 1GP - 2GP - 3GP - 4 1 Existing facilities for collection at the household level 2Any segregation done at the household level 3Frequency and mode of collection 4Existing facilities for disposal and treatment 5Type of treatment facility ( need in 2022) 6 Any non conventional/traditional methods/oganic (eg. vermi composting) of solid waste treatment 7Any recycling options/facilities 8 Waste disposal facilities for hazardous/industrial waste ** Brief analysis and Issues may be included in a brief write up

9 Component Profiling Access to Village Streets with Drains 9 DetailsGram Panchayats Existing GP - 1GP - 2GP - 3GP - 4 1Coverage of Village Streets 2 Type of village street Kutcha/Semi Pucca/Kutcha ( BT/Concrete/interlocking tiles/other) 3 Width of village streets-whether motorable or non motorable 4Pedestrian pathways available 5% of streets covered with drains 6Type of drains( covered /uncovered) 7Storm water disposal facilities ** Brief analysis and Issues may be included in a brief write up

10 Component Profiling Village Street Lights 10 DetailsGram Panchayats Existing GP - 1GP - 2GP - 3GP - 4 1No of street lights per km of street length 2Type of street light ( whether sodium vapour/LED) 3Any non conventional methods of street lighting 4No of non functional street lights to be replaced 4Electric Poles availability 4Coverage of households with electricity 5Use of non -conventional sources of electricity 6Potential for renewable energy usage ( wind/solar/mini-hydel) ** Brief analysis and Issues may be included in a brief write up

11 Component Profiling Health 11 DetailsGram Panchayats Total Existing GP - 1GP - 2GP - 3GP - 4 1Existing nos of sub centres/dispensaries. 2Infrastructure facilities of the sub centres 4Existing nos of maternity homes 5No of Primary Health Centres 6No of veterinary centres Projections GP - 1GP - 2GP - 3GP - 4 1Projected Population 2022 2Requirement of sub centres-2022 3Requirement of maternity homes-2022 4Requirement of PHCs 5Requirement of veterinary centres-2022 ** Brief analysis and Issues may be included in a brief write up

12 Component Profiling Up gradation of primary, secondary and higher secondary schools 12 DetailsGram Panchayats Total Existing GP - 1GP - 2GP - 3GP - 4 1No of anganwadis/mini anganwadi centres 2No of Primary Schools 3No of senior secondary schools 4Any schools for physically challenged persons 5Existing condition of 1-4 6Up-gradation needs for 1-4 Projections GP - 1GP - 2GP - 3GP - 4Total 1Projected no of households for 2022 2Projections for 1-4 above ** Brief analysis and Issues may be included in a brief write up

13 Component Profiling Inter village roads connectivity 13 DetailsGram Panchayats Total Existing GP - 1GP - 2GP - 3GP - 4 1.Distance between GPs 2 % covered by BT roads- whether NH/SH/MDR/PMGSY 3Length of non connectivity between GPs 4Capacity of existing roads – no of vehicles 5Need for strengthening/widening of existing roads ** Brief analysis and Issues may be included in a brief write up

14 Component Profiling Public Transport 14 DetailsGram Panchayats Total Existing GP - 1GP - 2GP - 3GP - 4 1 Public Transport facilities at household level viz. tempos/ rikshaws etc 2 Public Transport facilities at GP level- Bus stops/tempo stops/number of buses plying and frequency. 3 Public Transport at the cluster level- Bus Terminals/Local trains 4Improvement/Augmentation proposals by Government ** Brief analysis and Issues may be included in a brief write up

15 Component Profiling LPG Gas Connections 15 DetailsGram Panchayats Total Existing GP - 1GP - 2GP - 3GP - 4 1No of households with LPG connections 2No of LPG godowns 3 Projected no of LPG connections required for 2022 4Projected no of LPG godowns for 2022 ** Brief analysis and Issues may be included in a brief write up

16 THANK YOU 16


Download ppt "NATIONAL RURBAN MISSION NRuM 1 MINISTRY OF RURAL DEVELOPMENT Integrated Cluster Action Plan Step 3b- Component Profiling May 11 th, 2016."

Similar presentations


Ads by Google