SCX5 – Proposed New Intermediate floor over existing CMS Rack Room J.Osborne CEMESTE 20 Feb 2008
2
SCX5 – Proposed new intermediate over 1 st floor CMS Rack Room
4
SCX5 – Existing 1 st floor CMS Rack Room – disruption during works
5
SCX5 – As-built 1 st floor
6
SCX5 – As-built roof
7
SCX5 – As-built cross sections
8
SCX5 – New Intermediate Floor – Steel stucture with ‘DALTEC’ Floor plates (as used in USC55…..350kg/m2)
9
SCX5 – New Intermediate Floor – Building permit exists
10
SCX5 – Existing 1 st floor CMS Rack Room
12
False Floor panels ‘DALTEC’
13
Underfloor plate
14
Draft Cost Estimate CE works : Remove/re-install false ceiling, dust screen, new wall, door… J.Osborne 150kchf Metallic Structures and false flooring D.Parchet 200kchf Modifications to existing Ventilation systems B.Pirollet 200kchf Heating and cooling for office space B.Pirollet 100kchf Internet E.Sallaz Electrical modifications, new lighting, power R.Lassausaie Safety equipment : Water Mist Smoke Detection Modify position of automatically opening windows C.Schaefer Furniture/computers etc ? Total650kchf
15
Other possible areas in SX or SL53 would have to wait until after SX lowering decision is finally taken