Presentation is loading. Please wait.

Presentation is loading. Please wait.

Developing for the Future with Visual Studio 11 Karl Davies-Barrett CEE DPE Tech Lead, Microsoft Brian Keller, Microsoft Sr. Technical Evangelist, Microsoft.

Similar presentations


Presentation on theme: "Developing for the Future with Visual Studio 11 Karl Davies-Barrett CEE DPE Tech Lead, Microsoft Brian Keller, Microsoft Sr. Technical Evangelist, Microsoft."— Presentation transcript:

1 Developing for the Future with Visual Studio 11 Karl Davies-Barrett CEE DPE Tech Lead, Microsoft Brian Keller, Microsoft Sr. Technical Evangelist, Microsoft

2 Trends

3 user experience developer experience team experience experiences promises productivity platforms integration

4 Visual Studio Family TEAM FOUNDATION SERVER Office

5 Visual Studio 11 Transforming Your Ideas into Reality

6 Developing for Windows

7 The Tool for Windows

8 Advanced Development Environment

9 New DirectX & Parallel Tooling

10 Better Driver Development

11 Metro Style Applications

12

13 Blend Works with HTML

14 Demos Windows Developer Enhancements

15 Build for Cloud and Web

16 Windows Azure Solutions

17 Work with HTML5

18 Compelling HTML and JavaScript Tools

19 Better JavaScript tools Improved IntelliSense: Performance – Built on top of IE’s JavaScript engine New features: Go To Definition Overloads for methods (using new Xml comment ) Implicit references Extensibility – user can provide a JavaScript extension that can modify the IntelliSense Editing: Brace matching, highlighting & Outlining

20 Compelling HTML and JavaScript Tools

21 Explore Page and Server Simultaneously

22 Taking HTML5 to ASP.NET

23 Demos Page inspector, BLEND, DOM Explorer, etc

24 Application Lifecycle Management Empowering teams to deliver continuous value

25 Continuous Value Delivery

26 Demos Empowering Teams to Deliver Continuous Value

27 Stakeholder Involvement

28 Development Team Productivity and Integration

29 DevOps

30 Continuous Value Delivery

31 Visual Studio 11 Transforming Your Ideas into Reality

32 Get Involved Today

33 QUESTIONS? After the session please fill out the questionnaire. Questionnaires will be sent to you by e-mail and will be available in the profile section of the NT Conference website www.ntk.si.www.ntk.si Thank you!


Download ppt "Developing for the Future with Visual Studio 11 Karl Davies-Barrett CEE DPE Tech Lead, Microsoft Brian Keller, Microsoft Sr. Technical Evangelist, Microsoft."

Similar presentations


Ads by Google