Download presentation
Presentation is loading. Please wait.
Published bySabina Weaver Modified over 8 years ago
1
The Housing Challenge for NSW Norma Shankie-Williams PIA National Congress Adelaide 2012
2
7.3m 4.6m 1.7m 5.6m 0.2m 2.3m 0.51m NSW the most populous State
3
Projections to 2036
4
Population change in NSW
5
An ageing population
6
House prices and income National Shelter –Meeting Australia’s Housing Challenges 2012
7
Gap widening between supply & demand
8
Homelessness
9
NSW Housing Programmes NSW Housing - public and community housing Special housing programs for indigenous people First home owners given leg up with FHOGs and First Home-New Home schemes. + Affordable Housing Taskforce
10
Sydney is rapidly growing Department of Planning & Infrastructure
11
The issues are SUPPLY – delivery of housing and AFFORDABILITY Community need to be a part of the solution Location and type of product both crucial The Housing Issues for NSW Infrastructure
12
Five Housing Challenges 1)Plan for enough 2)In accessible locations 3)Match type and price point with need 4)Strive for quality and energy efficient design 5)DELIVERY
13
Enough in the pipeline Department of Planning and Infrastructure
14
Planned in accessible locations (Metropolitan Development Program) MDP Department of Planning and Infrastructure
15
The Housing Challenge for NSW Norma Shankie-Williams PIA National Congress Adelaide 2012 A centres focus- sustainable neighbourhoods and healthy living
16
Matching type with need - Grattan Institute – The Housing we need.
17
Grattan Institute – the Housing we need.
18
Casba, Danks St Waterloo (Cornerstone) 66 apartments – 32 0ne-bed sold out within 6 weeks.
19
E dwin Davey Flour Mill Pyrmont
20
Harbour Mill – Ceerose - 139 apartments 65%<$600,000 and studios from $395,000 “Price point a key driver for State stamp duty exemption – demand is there” (Exemptions up to June 30 th for <$600,000 )
21
Madison - (Loftex) Waterloo, modified design to include smaller, more affordable one and two-beds Australand: “ Our mix has changed to more price-pointed, affordable product and we’re doing less three-bedders” Mirvac: “....the issue for apartment buildings is to be nimble enough to adapt to market shifts, even to the point we have made changes during Construction because a particular product isn’t selling”
22
Variety, energy efficient, affordable. Reduced CO2 adapted for climate impacts secure Affordable to buy and run
23
Quality & Design Sustainable & Energy Efficient Malmo, Sweden
24
Delivery Grattan Institute - 'The Housing We Need'
25
Delivery Cabinet Taskforce on housing supply Examining impediments to supply Identifying specific infrastructure blockages Potential Homesites Program Examining improvements to the developer contributions system
26
Strategies for the future.........
27
What we aim to achieve… Gehl Consultants
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.