Download presentation
Presentation is loading. Please wait.
Published byAlan Foster Modified over 8 years ago
1
1 City of Burlington 2006-2007 Budget Work Session May 1, 2006
2
2 Objective Review preliminary budget recommendations Address questions and issues Formulate a final budget proposal to be presented to the City Council June 6, 2006
3
3 Process Year long effort involving City Council, management, and supervisory staff Not an overly complicated process Recognizing Needs Projecting revenues Establishing priorities Difficult decisions Unlimited needs and very limited resources
4
4 Budget Process Management team was told of limitations for the 06-07 budget No new staff Capital request to follow capital improvement plan first, and secondly to be prioritized on need basis Adjustment to line items only based on inflationary factors, which could not be otherwise managed
5
5 Water and Sewer Water and Sewer repair and construction Water and Sewer plants and facilities Water source protection Laboratories Composting
6
6 Challenging Issues Reduction of Industrial consumption Increase in consumption by residential customers Unfunded state and federal environmental mandates Increase energy costs Health Insurance Aging Infrastructure
7
7 Maintenance and Enhancement of Infrastructure Water and Sewer system aging Replacement and plant updates should be completed annually 50% or $2,000,000 of the projected $4,000,000 of depreciation of our system has been reserved for system improvements
8
8 Revenues 1.5 million in water revenues from Greensboro
9
9 Preliminary Budget Recommendation 2006 – 2007 $21,659,782 0% increase in water rates Proposed 5% increase in sewer rates Average residential customer – increase (range of.91 to $1.00 per month) Municipal rates 105% inside City rate
10
10 General Fund General Fund Police Fire Recreation and Parks Public Works General Administration Legal HR/Health Services Information Technology Finance Engineering/Traffic Control Planning/Inspections
11
11
12
12 Increase in energy costs Maintenance and Enhancement of Infrastructure Employee compensation package to compete in the marketplace Health Insurance Staffing Levels Challenging Issues Challenging Issues
13
13 Utilities Rising cost of Utilities has and will continue to have a large impact on operations Projections are a $340,000 increase in cost of fuel, diesel, natural gas, and electricity
14
14 Energy Increases in the past year Natural Gas prices 2005 = $3.00 Feb. of 2006 = $8.00 166 % increase Gasoline prices 2005 = $1.198 2006 = $2.35 96 % increase
15
15 Maintenance and Enhancement of Infrastructure Community approved a 9.3 million dollar bond package Three-year project 30 miles of streets being repaired this year Additional work next two years Additional debt service to fund this bond translates into a 2.77 cent tax increase for the 20 year life of this borrowing
16
16 Employee Compensation Package to Compete in Marketplace Employee Compensation Package to Compete in Marketplace Importance of attracting, retaining and rewarding excellent employees is critical in providing the desired level of services Budget reflects enhancements of salaries to sworn police officers, firefighters, telecommunicators and Utility staff at mid-year An average of a 4% increase in salary is recommended for each of these departments
17
17 Health Insurance Pressure to manage trends in plans and maximize containment of large claims while providing an open plan with benefit options
18
18 Health Insurance Integrated disease management Proactive identification of disease states and programs to assume treatment compliance Integration of claims data and professional staff at carrier and City levels for shared information Predictive models based on emerging claims data
19
19 Health Insurance Member central focus on health and wellness Incentive to employees for health awareness and fitness Employee choice benefits Open plan network
20
20 Staffing Levels Proposed budget includes only two areas for staffing changes Two previously funded RICO positions in the Police Department ($74,537) Quite important for our drug interdiction efforts Two meter readers in Water and Sewer ($42,214) This would allow City to go to monthly billing in January of 2007.
21
21 Staffing Numbers Modest Recreation and Parks eliminated 4 positions Cemetery and Grounds reduced workforce by four Police has transferred positions from Administration to street rotation Development and Technical Review area are cross-training Human Resources gave up administrative position to hire Safety Director
22
22
23
23 Highlights: Internal Services Finance and Risk Management No capital increase Implementation of City’s software system Implementation of City’s Health Plan Information Technology No major increase in cost Coordinate the implementation of the City’s new software system
24
24 Internal Services Human Resources No Capital Increase Services Transfer Assistant HR position to Safety Director to assist organization with OSHA compliance guidelines and identify workplace/worker hazards Increase funding in Occupational Health with goal of coordinating disease management, wellness, and workers compensations programs to better manage these issues Significant increase in use of present Occupational Health program by employees
25
25 Internal Services Administrative Services Administration Public Information Collections Division Customer Service and Utility Billing Division Increased Services
26
26 Administrative Services Billing and Collection of property taxes and utilities in excess of 37 million Significant increase in customer service inquiries in both web, phone, and in-person Improved communications with citizens through utility bill inserts Implementation of Burlington Government Academy Maintain all City records
27
27 Highlights: Developmental and Technological Review Services Engineering Planning Building Inspections Traffic Signal
28
28 Contracted Inspections Services Increased Services Highest permit activity for both residential and non- residential building in history of the City Plan review activity will continue at record pace for engineering, planners, building inspectors, and traffic control staff Large Projects New elementary school LabCorp Alamance Crossing Mackintosh at the Lake Ethan Pointe Auburn Trace
29
29 Highlights: Public Works Street Bond implementation On-going maintenance to streets 30 miles of paving this season Replacement of Garbage Truck Replacement of Dump Truck Cab and Chasse for Leaf Truck Replacement of Limb Truck
30
30 Public Works Services Sanitation Division Continuing increase in solid waste and yard waste collection 23 employees providing solid waste service to 16,500 accounts Provide bulk waste, bulk limb, and white goods pickup Street Division Administer Street Bond Package 21 employees maintaining 220 miles of streets and 70 miles of sidewalks
31
31 Public Works Services Traffic Sign 3 employees Maintains 32,000 signs and miles of street pavement markings Equipment Services 14 employees Maintains over 800 pieces of equipment/vehicles Building Maintenance 10 employees Maintains over 120 City owned buildings and structures
32
32 Public Works Services Cemetery and Grounds Staff reduced from 16 to 12 full-time 4 part-time staff members Stormwater 1 staff person Implements City’s stormwater system
33
33 Highlights: Recreation Maintenance upgrades at Recreation Centers Decrease in staffing positions over the past 3 years
34
34 Recreation: Increased Services Youth baseball and softball participation up 18% Adult softball participation up 21% Youth Lacrosse offered for first time with over 125 participants Over 4,000 participants in youth athletics programs Over 3,500 participants in senior activities coordinated through the Kernodle Center Implementation of Haw River Trail System
35
35 Highlights: Fire Adjustment in Pay Plan $146,000 Replaced plumbing and resurfaced floor at Station # 2 Generator at Station # 3
36
36 Increased Activity EMS calls up 11.5% Plan Reviews up 33% 132 Manpower hours Construction related inspections up 67 or 50% 85 Manpower hours General inspections up 3.8% 70 Manpower hours
37
37 Highlights: Police Vehicle Replacement Plan 7 vehicles marked 3 unmarked vehicles Animal Control van Two RICO positions Cost: $74,537 Cash seized: $100,000 Adjustment for Pay scale $207,000 for sworn officers and telecommunicators
38
38 Increased Activity Overall Crime Rate up 10% primarily Kidnapping offenses up by 24 Felonious Assaults up by 78 Fraud complaints up by 131 Larceny complaints up by 221 Damaged Property complaints up by 280
39
39 Additional Crimes Adult and Juvenile Case Assignments up by 26% (2,417 –3,046) Actual arrests increased by 3% Cocaine seizures up from 21 kilos to 62 kilos or 195% Marijuana seizures up from 30 lbs to 2,208 lbs Significant increased presence of street gangs Known from 6-12
40
40 Preliminary Budget Recommendations 2006-2007 $44,250,643 Projected tax rate 62.5 cents per $100 valuation
41
41 Projected Revenue Source Increases Ad Valorem Tax Interest on Investments Powell Bill Funds Sales Tax Franchise & Excise Taxes General Fees
42
42 Comparison of Various Tax Statistics for Selected Cities
43
43 General Fund Appropriated Fund Balance 05 – 06 $2,700,000 Projected 06 – 07 $1,636,986
44
44 Summary
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.