Download presentation
Presentation is loading. Please wait.
Published byAlbert Bryan Modified over 8 years ago
2
oil Housing Drilling Floor Derrick
3
Conductor 30” (or 36”) (Jet Cleaning
4
Casing 30” Elevator Kelly Bushing
6
Wedges
19
Drill Bit
20
Drill Pipe
28
oil Lowering Conductor Pipe 30”,
29
oil Drill Pipes Column
30
oil Jet Cleaning
31
oil Jet Cleaning
32
oil Collar Shoe 30” End of Jet Cleaning
33
Drilling Fase 16” and lowering casing and lowering casing of 13 3/8” (Slender)
34
oil Drilling Fase 16” Collar Shoe 30”
35
oil End of Fase 16” Gravel
36
oil Circulating for well cleaning
37
oil Circulating for well cleaning
38
oil Well cleaned Collar Shoe 30”
39
oil Taking column back for lowering casing of 13 3/8” Collar Shoe 30”
40
oil Taking column back for lowering casing of 13 3/8
41
oil Preparing for lowering casing of 13 3/8”
42
oil Lowering casing of 13 3/8”
43
oil Lowering casing of 13 3/8
44
oil Lowering casing of 13 3/8
45
oil Lowering casing of 13 3/8
46
oil Lowering casing of 13 3/8
47
oil Lowering casing of 13 3/8
48
oil Final lowering of casing 13 3/8” Collar Shoe 13 3/8”
49
oil Circulating for cementation of casing of 13 3/8” Collar Shoe 13 3/8”
50
oil Cementing casing of 13 3/8” Cement return on seabed
51
oil Taking the setting tool back of 13 3/8”
52
oil Lowering the BOP (Blowout Preventer)
53
oil Lowering the BOP (Blowout Preventer)
54
oil Riser BOP
55
Drilling Fase 12 1/4” and lowering casing and lowering casing of 9 5/8”
56
oil Starting drilling fase of 12 1/4”
57
oil Drilling fase of 12 1/4”
58
oil Drilling fase of 12 1/4”
59
oil Drilling fase of 12 1/4”
60
oil Final fase of 12 1/4”
61
oil Circulating for well cleaning
62
oil Circulating for well cleaning
63
oil Well cleaned
64
oil Taking column back for well logging
65
oil Taking column back for well logging
66
oil Well prepared for logging
67
oil Logging well of 12 1/4”
68
oil Logging complete and preparing for lowering casing of 9 5/8”
69
oil Lowering casing of 9 5/8” Riser, BOP, Casing of 13 3/8”
70
oil Lowering casing of 9 5/8” in open well
71
oil Lowering casing of 9 5/8” in open well
72
oil Final lowering of casing 9 5/8” Collar Shoe 9 5/8”
73
oil Circulating for cementation of casing of 9 5/8” Collar Shoe 9 5/8”
74
oil Cementation of casing 9 5/8” Collar Shoe 9 5/8” Complete cementation of casing 9 5/8”
75
Visualizing cementation of casing 9 5/8”
76
Collar Shoe 30” Collar Shoe 13 3/8” Collar Shoe 9 5/8” Riser Wellhead Mud pump Cementation Head Mud tank Packer Floating collar oil
77
Collar Shoe 30” Collar Shoe 13 3/8” Collar Shoe 9 5/8” Riser Wellhead Mud pump Cementation Head Mud tank Packer Floating collar oil
78
Collar Shoe 30” Collar Shoe 13 3/8” Collar Shoe 9 5/8” Riser Wellhead Mud pump Cementation Head Mud tank Packer Floating Collar oil
79
Collar Shoe 30” Collar Shoe 13 3/8” Collar Shoe 9 5/8” Riser Wellhead Mud pump Cementation Head Mud tank Packer Floating collar oil
80
Collar Shoe 9 5/8” Riser Wellhead Mud pump Cementation Head Mud tank Packer Floating collar oil
81
Collar Shoe 9 5/8” Riser Wellhead Mud pump Cementation Head Mud tank Packer Floating collar oil
82
Riser Wellhead Cementation Head Cementation Unit Packer oil
83
Riser Wellhead Cementation Head Cementation Unit Packer oil
84
Riser Wellhead Cementation Head Cementation Unit Packer oil
85
Riser Wellhead Cementation Head Cementation Unit Packer oil
86
Riser Wellhead Cementation Head Cementation Unit Packer oil
87
Packer Dart Riser Wellhead Mud pump Cementation Head Mud tank oil
88
Packer Dart Riser Wellhead Mud pump Cementation Head Mud tank oil
89
Packer Dart Riser Wellhead Mud pump Cementation Head Mud tank oil
90
Packer Dart Riser Wellhead Mud pump Cementation Head Mud tank oil
91
Packer Dart Riser Wellhead Mud pump Cementation Head Mud tank oil
92
Packer Dart Riser Wellhead Mud pump Cementation Head Mud tank oil
93
Packer Dart Riser Wellhead Mud pump Mud tank oil
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.