2
1.Civil engineering projects 2.Construction and work maintenance 3.HVAC and electricity 4.Design Office and Patrimony 5.Contracts review 6.Logistics and site services a.Installation service b.Site surveillance c.Storage areas management d.CERN Stores e.Green spaces f.Mobility and transport g.CERN Hotel June 2010 ACCU Meeting - M. Tiirakari 2 Contents
3
June 2010 ACCU Meeting - M. Tiirakari 3 Civil engineering - Major Study Projects PROJETS CLIC, ILC, LHeC CLIC tunnel cross section (4.5m) for 2010 CDR LHeC studies : 60 GeV machine : CLIC Conceptual Design Report and cost estimate for CE and technical services (CV,EL etc) ILC studies for CE work during Engineering Design Phase LHC R2E civil requirements (new boreholes, shafts ?) LHeC Conceptual Design Report planned 2010
4
June 2010 ACCU Meeting - M. Tiirakari 4 Civil engineering - Major Study Projects LINAC 4 Duration of work 26 months Klystrons building, landscaping and finishing works B867 Detailed studies, dismantling of the existing arrangement and Start of the works for the new radioactive workshop B42 Works duration 24 months B222 Auditorium Construction of the Auditorium (200 seats, full conference equipment); B107 Chemical Treatment facility Project preparation phase, launch MS and DO for CE works including demolition of B174 once project is formally approved B513 Upgrade CE works for new structures inside the ‘barn’ and external foundations
5
June 2010 ACCU Meeting - M. Tiirakari 5 Civil engineering - Major Study Projects B185 Asbestos removal and re-insulation (awaiting approval from French authorities for Asbestos contractor before deciding strategy) CMS a)New offices / conference room / visitors gallery : permit awaited (works in 2011) b)Floor screed in SHL5 over clean room (works 2010) c)New ‘metalotextile’ structure next to 904
6
June 2010 ACCU Meeting - M. Tiirakari 6 Construction and Work maintenance Around 200 Price Enquiries launched in 2009; Start of consolidation program and replacement of roofing Completion of the maintenance program for the tunnel before the LHC startup 1.Renovation of B 73 (Floors 1,2,3): Design and construction; 2.Renovation of B30 and B112 facades and Cooling Towers B863 : Call for Tender, First phase of construction; 3.B20, B21, B168: Renovation of facades and roof.
7
Methods 1.CAMMS optimization (new classification, codification, and indicators) 2.Retendering operation, works and maintenance contracts HVAC 1.Heating plants optimization (B.860, B201) 2.Energy monitoring 3.Solar heating (B.65, 41) 4.Office building renovation (B.73, B222) 5.Regulation and monitoring (B.42) 6.Conformity of chemical labs, Clic measuring room Sanitary 1.Sanitary block renovation (B.500, 892, 14, 5) Electricity 1.Outdoor lighting renovation in Meyrin (step 2/7) 2.Lighting renovation (council room B.503, B.927, etc) 3.Lighting renovation first floor Main building Catering 1.Restaurant equipment renovation (B.504, 866) Other 1.Renovation of first floor B.500 2.Dynamic lighting for Globe (LED) June 2010 ACCU Meeting - M. Tiirakari 7 HVAC and Electricity
8
June 2010 ACCU Meeting - M. Tiirakari 8 Design office and Patrimony 1.Projects - Building 42 HVAC and EL works Work finishes Building commissioning end 2010 2.2. Various studies PS 3D models New RR shafts Redevelopment Building 867 Design new building 107 CLIC and ILC studies End HiRadMad 3D Models PS 3D models SPS 3D models Removal of the clubs area Planning studies participation Various studies for consolidation program … 3.Migration to ESRI GIS Technology 4.New Web interface for CERN GIS 5.Add information data about parcels, underground works and networks
9
June 2010 ACCU Meeting - M. Tiirakari 9 Contracts review On going 1.Restructuring the annual site maintenance contracts, emphasizing improvements in the user friendliness of the site, taking into account safety and environmental aspects, and the evolution of construction norms and legislation in the EU and Switzerland; 1.Designing and creating a site information computer application, which will serve as the basis for the financial and operational management of the works carried out on the CERN sites.
10
June 2010 ACCU Meeting - M. Tiirakari 10 Logistics and Site Services Installation service Green plates -Reminder What are the advantages / disadvantages of having a car registered on consular 431 K XXXX license plates (green plates)? Advantages: you are exempt from paying VAT and/or importation duties the registration certificate is delivered free of charge you do not need "technical evaluation" (contrôle technique) Disadvantages: restrictions concerning driving rights: a vehicle registered on green license plates can only be driven by the member of personnel and/or the members of his/her family who hold the same type of French "carte spéciale".
11
June 2010 ACCU Meeting - M. Tiirakari 11 Logistics and Site Services Site Surveillance 1.Collaboration with GS_ASE to modify Gates A and B in order to get two entry and two exit lanes of which one is automatic; 2.Plates reading system already tested in Prevessin.
12
Start to eliminate very old and dangerous goods which have been stored for more than 40 years in some cases (like rare gas, sodium, beryllium etc). June 2010 ACCU Meeting - M. Tiirakari 12 Logistics and Site Services Special Waste Management
13
June 2010 ACCU Meeting - M. Tiirakari 13 Logistics and sites services Green Spaces 1.Outside CERN consists of 200 hectares of agricultural land and forest ; 2.Campaign for the felling of poplars for safety reasons and replantation using other trees in compliance with Swiss Law; 3.Partnership developed with Geneva Canton, Ecole de Lullier/Hepia, ONF and local French authorities (Local communes) for an optimised management of the green spaces inside and outside CERN. A new terrace between B39 and B40 to come
14
June 2010 ACCU Meeting - M. Tiirakari 14 Logistics and Site Services Mobility and Transport 1.Regular shuttles 2.Increase of the bicycle fleet with the introduction of electrical bicycles in collaboration with PH 3.Common project with PH (educational group - visit service) for visitors transportation 4.Project on a global mobility study with a Greek university 5.Optimization of CERN car fleet a.Optimisation of the fleet based on Departments input b.Mobility concept test with HERTZ (start on 1st July) in collaboration with PH Department (acting as project leader) c.Environmental approach Since the 1 st of February to 14 May, nearly 10’000 people were transported
15
June 2010 ACCU Meeting - M. Tiirakari 15 Logistics and sites services – Regular shuttle New Proposal for the airport CERN -> AirportAirport -> CERN CURRENTPROPOSALCURRENTPROPOSAL CERNY BusDiff.CERNY BusDiff.AirportLigne YDiff.AirportLigne YDiff. 8:008:010:017:458:010:168:307:550:358:157:550:20 8:310:31 8:310:46 8:260:04 8:260:11 9:009:010:019:209:010:19 8:560:26 8:560:41 9:310:31 9:310:119:309:230:079:409:230:17 10:1010:320:2210:1010:320:2210:4010:230:1710:4010:230:17 11:1011:300:2011:1011:300:2011:4011:240:1611:4011:240:16 12:1012:300:2012:1012:300:2012:4012:230:1712:4012:230:17 13:0013:300:3013:0013:300:3013:3013:230:0713:3513:230:12 14:0014:300:3014:0014:300:3014:3014:230:0714:3514:230:12 15:0015:300:3015:0015:300:3015:3015:220:0815h3515:220:13 16:1016:090:0116:2016:090:1116:4016:010:3916:4516:010:44 16:410:31 16:410:21 16:340:06 16:340:11 17:1017:090:0117:0017:090:0917:4017:040:3617:2017:040:16 17:410:31 17:410:41 17:340:06 17:340:14 18:121:02 18:121:12 18:040:24 18:040:44
16
B. 38 1.Replacement of the kitchen and extension of dining rooms (October 2010); 2.Centralization of fire detections (December 2010) ; 3.Replacement of the wall to wall carpet of the corridors; 4.Card security system replacing locks and keys; 5.Entire renovation of 25 showers. B.41 1.New individual lockers installed for clothes, suitcases and luggage (Done). B. 39 1.Replacement of the kitchen and extension of dining rooms (November 2010); 2.Centralization of fire detections (December 2010) ; 3.Self-service computers in the lounge (Done) 4.TV and international channels to be installed in the lounges (price enquiry launched); 5.17 Card security system replacing locks and keys; 6.Renovation of 116 showers; 7.Renovation of 116 rooms: replacement of old furniture (chairs, beds, bedside lamps, curtains, etc.); 8.Creation of 5 additional hotel rooms (ex offices); 9.Replacement of furniture at the reception and the lounges+ painting (Done); 10.Curtains to be changed (September 2010); 11.Hostel reception written on the front of the building. June 2010 ACCU Meeting - M. Tiirakari 16 Logistics and Site Services CERN Hotel As from 1 June, RECEPTION change of opening hours : Mon-Fri 7:30am -01:00 am (instead of 7:30 pm) Sat-Sun 9:00-01:00 am (instead of 01:00pm) As from 1 June, RECEPTION change of opening hours : Mon-Fri 7:30am -01:00 am (instead of 7:30 pm) Sat-Sun 9:00-01:00 am (instead of 01:00pm)
17
June 2010 ACCU Meeting - M. Tiirakari 17 Logistics and Site Services CERN Hotel WWW booking WWW booking in production since April 2010. It enables users to: make individual booking [CERN login necessary]; Manage their individual booking, (Cancellation up to 4h before arrival). Modification only via the reception desk; Guarantee their reservation with a credit card
18
June 2010 ACCU Meeting - M. Tiirakari 18 Logistics and Site Services CERN Hotel
19
Future developments 1.Long Term waiting list; 2.Web booking including shared rooms; 3.Show daily availability of rooms; 4.Develop the collaboration with the “Foyer de Saint Genis”, review the level of service (cleaning, keys, reception, etc…); 5.Continue to promote deals with external hostels; 6.Strengthen the block bookings follow up; 7.Possibility to book a room for the 6 following months; 8.No overbooking Proposals 1.Starting from the 1st of July implement penalty for no show and late cancelled bookings (standard = 48 hours before the stay); 2.Open the hostel parking; 3.Modify the lounges and create new rooms? June 2010 ACCU Meeting - M. Tiirakari 19 Logistics and Site Services CERN Hotel
20
June 2010 ACCU Meeting - M. Tiirakari 20 Logistics and Site Services CERN Hotel
21
June 2010 ACCU Meeting - M. Tiirakari 21 Logistics and Site Services CERN Hotel
22
June 2010 ACCU Meeting - M. Tiirakari 22 Logistics and Site Services CERN Hotel
23
June 2010 ACCU Meeting - M. Tiirakari 23 Logistics and Site Services CERN Hotel From D to D+60
24
As from 19 April 2010, in collaboration with Restaurant No. 1, implementation of a CERN Hotel online food storea CERN Hotel online food store reserved to the users of CERN Hotel The order has to be made before 11:00 am, be picked up and paid for in Restaurant No.1 between 10:00 am and 11:00 am or between 3:00 pm and 5:00pm on the following day. June 2010 ACCU Meeting - M. Tiirakari 24 Preview 2010 - Logistics and Site Services CERN Hotel
25
June 2010 ACCU Meeting - M. Tiirakari 25 CERN hotel services – online food store
26
Q&A and Discussion Many thanks for your attention June 2010 ACCU Meeting - M. Tiirakari 26 Conclusion
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.