Download presentation
Presentation is loading. Please wait.
Published byHilary Bruce Modified over 8 years ago
1
Reedley Middle College High School (RMCHS) PERMANENT FACILITY PLANNING A collaboration between Reedley College and Kings Canyon Unified School District
2
CURRENT STATUS Second year of the program - Freshman Class: 40 students - Sophomore Class: 21 students Recruitment period resulted in a full freshman class with a substantial waiting list The grant for RMCHS, awarded to RC, is a recurring state grant supporting the location and college staff Student enrollment, services, teachers, and oversight are the responsibility of KCUSD
3
EXPANSION AND PERMANENT LOCATION AT REEDLEY COLLEGE Temporary location by the Library in the PORTABLES Includes four rooms with 40-student capacity Lacks adequate labs and support facilities Insufficient space for growth Current space is centrally located and needed by the college RC has open space available
4
CONSIDERATIONS FOR FALL 2017* 1.SITE LOCATION. Tentatively selected as the north end of the campus, east of the AGNR greenhouse. Facilities Committee and constituency input in progress. 2.KCUSD has agreed to conduct a NEEDS ASSESSMENT (600- 800 students). 3. KCUSD has agreed to use Darden & Associates to develop SITE PLANS 4. KCUSD is considering FUNDING OPTIONS including: a. construction costs b. maintenance/custodial c. operating utilities 5. RC is considering impacts related to: a. student volume b. traffic flow c. parking Proposed site location
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.