Download presentation
Presentation is loading. Please wait.
Published byJoshua Bond Modified over 8 years ago
1
University of Minnesota Clean Snowmobile Team
2
Overview Our Team Goals Design Objectives Development Process Current Snowmobile
3
Goals Increase Membership o 15 Members o 750% Growth from last year Increase Resources o Shop Space o January 25 th, 2016 o Equipment acquisitions o 5-gas emissions analyzer o Dataq Gain sponsorships Attend competition
4
Design Objectives Catalyst o Heraeus 3-way catalyst Belt Drive o Reduce noise o Reduce rotating mass PE3 ECU
5
Emissions Control EmissionsPercentage/ppm HC1.13% CO 2 2.0% CO3.05% NO x 40 ppm Data at idle 3-way catalytic converter o Heraeus o Implemented on snowmobile o BASF o Testing 2-stage catalyst system Supplier Catalyst Wash Coat Heraeus 1:20:1- Pt:Pd:Rh 50 g/ft 3 BASF 2:9:1- Pt:Pd:Rh 60 g/ft 3
6
Belt Drive System Reduces Rotating Mass o 1.1 kilogram reduction Eliminate Chain Bath o Potential noise reduction
7
Engine Control System Stoichiometric Air/Fuel Ratio PE3 ECU Skip-tooth timing wheel
8
Summary MSRP: $10,225 Electrical Component Issues Improvements for 2017 Competition o Better Project Management o Greater Industry Support o Increase Testing
9
Huge Thanks!
10
University of Minnesota Clean Snowmobile Team
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.