14 June 2001LHCb workshop at Bologna1 LHCb and Datagrid - Status and Planning F Harris(Oxford)
2
14 June 2001LHCb workshop at Bologna2 Overview of presentation Project organisation Overview of deliverables and LHCb commitments Use cases and requirements Getting organised for the testbed LHCb participation in the design Comments on future organisation and required manpower
3
14 June 2001LHCb workshop at Bologna3 Datagrid Project Organisation ( the work packages and the ATF) WP1 Workload management F Prelz WP2 Data Management B Segal WP3 GRID Monitoring R Middleton WP4 Fabric Management O Barring WP5 Mass Storage management J Gordon WP6 Testbed Organisation F Etienne WP7 Networking P Primet WP8 HEP applications(LHC expts) F Carminati WP9 ESA L Fusco WP10 Biology C Michau/V Breton ATF(Architecture Task Force) S Fisher
4
14 June 2001LHCb workshop at Bologna4 The multi-layer hourglass OS & Net services Bag of Services (GLOBUS) DataGRID middleware PPDG, GriPhyn, EuroGRID HEP VO common application layer Earth Obs.Biology ALICEATLASCMSLHCb Specific application layer WP9WP 10 GLOBU S team DataGRI D ATF WP8-9- 10 TWG APPROVED
5
14 June 2001LHCb workshop at Bologna5 HEP applications EO applications Biology applications WP 8 TWG I.Augustin(Chair, CERN) C.Charlot(CNRS) A.Tricomi(INFN) K.Bos(NIKHEF) D.Newbold(PPARC) P.Cerello(ALICE) C.Tull(ATLAS) A.Sciabà(CMS) E.VanHerwijnen(LHCb) D.Brugnoni(WP9) R.Medina(WP10) ATF APPROVED Current Applications Interface to design work
6
14 June 2001LHCb workshop at Bologna6 4 5 6 7 8 9 10 11 12 13 14 M D1.1, D2.1, D4.1, D5.1 Rpt on current Technology D1.2, D2.2, D4.2, D5.2 Rpt on requirements, architecture design and evaluation criteria+ ID (1) D8.1, D9.1, D10.1 Requirements. Use Cases D1.3, D2.3, D4.3, D5.3 Components and documentation (2) Design Coding + unit test Integration (WP6) D8.2, D9.2, D10.2 Report on results D6.4 Evaluation of testbed Operation D12.4 (ATF) Architecture requirements D6.1 (M4), D6.2, D12.2 Integration process + Configuration Management Plan D3.2, D3.3 Arch design + First prototype D7.1 Prototype of VPN D12.1 PQP D3.1 ??? Rpt on current Technology D7.2 Demo of enhanced monitoring tools D7.4, D7.5 : Network & Security design WP 8,9,10 WP 1-5 WP 6, 7, 12 Tesbed 1: Technical deliverables D3.1 (a) Decide baseline Architecture & Technologies ID8, ID9, ID10 Test cases programs Validation ID8, ID9, D10 Use cases programs (1) + Global Architecture(ATF) + Description of Testbed 1 deliverable components (2) Documentation = Specification, design, tests plan, tests cases (3) This date have to be confirmed at Oxford MeetingD=EC deliverables, ID=Internal Deliverables ID6 Testbed Beta Test (3) ID6 Testbed infrastructure
7
14 June 2001LHCb workshop at Bologna7 Use Cases and requirements Short term use case –Have taken our MC production system as vehicle for getting started –Written short document with basic requirements for job submission, file copying etc. Long term use case and requirements –These will be derived from our thinking on analysis model and GAUDI/GRID work –Need to write something by end June
8
14 June 2001LHCb workshop at Bologna8 Getting organised for the testbed Currently our GRID tests have been based on CERN and RAL (catalogue of problems with Globus) Intend to extend to Nikhef, Bologna,Lyon in first instance (later Oxford,Liverpool,Edinburgh..) It is vital we have real effort at each of these sites to work with Eric otherwise site should not participate –Eric will define tasks and effort required Software installation Running and monitoring tests Liaising with security arrangements
9
14 June 2001LHCb workshop at Bologna9 Test bed installation kits Products requiring root(system privileges) access –OS, compilers, Objectivity… –To be installed by WP6 CERN products installation kits –CLHEP, GEANT4, CERNLIB… –Kits provided by CERN / IT and installed by WP6 Experiment environment installation kits –Kits provided by experiment and installed by WP8 funded effort APPROVED
10
14 June 2001LHCb workshop at Bologna10 LHCb participation in the design This has been via WP8 reaction to ATF docs and questions (Eric and Frank) We need a considered reaction to the ATF document. E.g. a key issue is the GRID service view of our data e.g. files/objects –From now inputs to ATF should come from GAUDI/GRID effort, and from our view of analysis model WP8-10 is requesting setting up working relationships with the key middleware WPs in the prototyping stage –We need LHCb people to interface to middleware effort ? Find people from institutes participating to GRID tests
11
14 June 2001LHCb workshop at Bologna11 Organisation and Manpower Testbeds for GRID development –Find sites with guaranteed manpower to support effort –Don’t involve too many to start Links to ATF –From Gaudi/GRID and analysis model teams Links to middleware work packages –Find LHCb people from CERN +institutes participating in GRID Broaden production management