Download presentation
Presentation is loading. Please wait.
Published byMoris Silvester Jackson Modified over 8 years ago
1
1 City of Cocoa Michael Burton - President Andrew Burnham - Sr. Vice President Eric Grau - Project Consultant Presented by: Water, Sewer & Reclaimed Water Rates Discussion April 28, 2010
2
Introduction and Overview Burton & Associates Multi-year financial planning and rate services to local governments Emphasis in water resources rate making Some of our other similar clients in FL St. Pete, Pinellas County, Deltona, Lake Worth, St. Cloud, Fort Lauderdale Michael Burton – President – 30 yrs of industry experience Co-author of AWWA manual M54 Rate Making for Small Systems Andrew Burnham – Sr. Vice President – 10 yrs of industry experience Over 300 water and wastewater rate/financial planning projects Overview of presentation Scope of Rate Study Results of each component of the Rate Study 2
3
Scope of Study Components of the Rate Study: 1. Development of a plan(s) of multi-year rate revenue adjustments Applicable to Water, Sewer, and Reclaimed Water services 2. Evaluation of current rate structure and development of recommended modifications as appropriate 3. Preparation of comparative monthly residential rate survey 4. Update of water and sewer impact fees 5. Assist City staff with cost computation templates for the update of certain miscellaneous service charges 3
4
Multi-Year Rate Revenue Adjustments - Overview Key Financial Parameters 3 Month Operating Reserve Common Industry Target & Level for Good Utility Systems per Rating Agencies Minimum Debt Service Coverage of 1.50x net income Target of Rating Agencies for Good Utility Systems Funding or renewal and replacement requirements $10 million per year per CH2MHill asset inventory/assessment Total expenditures currently exceed total revenues FY 2010 operating cash flow shortfall of over $3 million 4
5
Multi-Year Rate Revenue Adjustments - Results Plan of annual rate revenue adjustments are required Higher near-term adjustment(s) for cash flow and to maintain reserves Annual 5% increases starting on 10/1/11 to fund R&R requirements, increases in O&M and to maintain reserves and debt coverage Developed two alternative plans for near-term Option 1: 17% rate revenue increase on 10/1/10 Option 2: 9% rate revenue increase on 7/1/10, 8% increase on 10/1/10 Rate structure changes can be implemented with either option and will result in different customer impacts Staff & Consultant recommend Option 2 w/rate structure changes on 7/1/10 5
6
Rate Structure Modifications Current rate structure is generally fair and equitable Recommend minor modifications to water rate structure to: Provide stronger price signal to discretionary use to promote conservation and maintain affordability for low volume users Reflect current average use for all customers by meter size Water rate structure modifications include: Changing tiers for 3/4” customers from 8/16/24/24+ to 6/12/24/24+ Adjusting rates in each tier to provide greater price signal to discretionary use Adjusting consumption in tiers for all other meter sizes based upon average use by meter size Recommended rates embody 9% revenue increase from Option 2 and would be effective 7/1/10 No rate structure changes for sewer or reclaimed water rates Existing rates adjusted for 9% rate revenue increase and price elasticity effects 6
7
Customer Impacts – Outside City Water Only Option 2 (Includes 9% Revenue Increase) Low volume users (41%) Up to 3,000 gal. / mo. $.10 to $.40 increase Typical/Avg. users (32%) 4,000 - 6,000 gal. / mo. $.50 - $.70 increase Higher volume users (27%) >6,000 gal. / mo. Bills increase at same use Conserve to avoid increase 7
8
Customer Impacts – Inside City Water & Sewer Option 2 (Includes 9% Revenue Increase) Low volume users (51%) Up to 3,000 gal. / mo. $1 to $2.50 increase Typical/Avg. users (30%) 4,000 - 6,000 gal. / mo. $3 - $4 increase Higher volume users (29%) >6,000 gal. / mo. Bills increase at same use Conserve to avoid increase 8
9
Other Customer Impacts Option 2 (Includes 9% Revenue Increase) 9
10
Water Residential Rate Survey Results 10
11
Water & Sewer Residential Rate Survey Results 11
12
Update of Impact Fees Definition: Charges intended to recover unit cost of expansion-related facilities from new connections Calculation: Based upon reconstruction cost new less depreciation of existing facilities (these facilities will be used to serve growth in the near-term) Results - $ per ERC (Equivalent Residential Connection): Water Impact Fee: Current = $1,000 New = $1,802 Sewer Impact Fee: Current = $1,250 + $1,450 = $2,700 New = $2,715 Results are in-line with others Discretionary fees 12
13
Water Impact Fee Survey Results Average Water Fee (Excluding Cocoa) = $1,725 Updated Water Fee for Cocoa = $1,802 13
14
Water & Sewer Impact Fee Survey Results Average Water Fee (Excluding Cocoa) = $1,725 Average Sewer Fee (Excluding Cocoa) = $2,475 Updated Water Fee for Cocoa = $1,802 Updated Sewer Fee For Cocoa = $2,715 14
15
Miscellaneous Service Charges Charges to individual customers for specific services requested Include such things as meter testing, service initiation, reconnection, service charges, etc. Provided cost computation templates to City staff to update costs of providing various services City staff will populate the templates and bring back appropriate ordinance/resolution amendments 15
16
16 Discussion
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.