Download presentation
Presentation is loading. Please wait.
Published byGloria Elliott Modified over 8 years ago
1
Summary Report Project Name: Infoway Testing Environment Brief Project Description: A set of tools to test that vendors have successfully implemented the requirements and specifications required to interoperate. Focus on HL7v3 messaging. –Simulation component (accepts message, returns result from test data DB to sender) –Logging and Reporting capabilities –Test Materials: Test Cases and Data, Test Scripts, Conformance Profiles Major milestones to date: –funding secured (June 2010) –development started (December 2010) Projected milestones: –Test cases and test data prepared (Mar 2011) –End to end testing performed during (April 2011) –Product announcement (June 2011) Major release dates: April 2011 Contribution date Contribution value ~ 1 person year (3-4 developers over 3 months)
2
OHT Conformance Tools Q3 2011 Content Strategy is complete Development is complete Documentation is completre Funding is no longer a pressure.. Testing Environment successfully developed Received funding for implementation of Tooling Strategy Development completed Apr 2011 Support contract signed with vendor Product to be publically announced tat eHealth conference TES v 1.0 Tools urgently needed for Infoway projects currently underway and upcoming “Stimulus funding” must be spent in 3 years. Projects must prove conformance to obtain final funding. Ability to use/modify existing open-source products. Availability, suitability, and ease of customization will affect timeline Added Deleted & Changed Milestones Packaging Editions Dependencies Pressures Statistics.
3
12 Month Rolling Plan Major Dates and Deliverables 2Q10 4Q10 3Q10 1Q11 2Q11 Funding approved RFP issued Procurement complete Pending hosting and public announcement Unit and end-to-end testing Development completed
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.