2
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal 3/98 DOE Handout 10 100 1 1,000 10,000 $/kA×m
3
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal “The SokPlot”
4
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal “Le SokPlot” Le Quatorze Juillet 1999 ASC “300” ASC “50”
5
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal Assumptions/Costs –Tape Area: 3 mm 2 –30% HTSC Fill Factor –I C = 200 A –Ag Cost = $0.161/gm ($5.00/troy oz); Ag C/P = $16.88/kA×m –BSCCO Cost = $0.86/cc; BSCCO C/P = $4.28/kA×m –L&O Cost = $3.00/m; L&O C/P = $15.00/kA×m Overall “Laboratory” C/P ~ $36/kA×m ! BSCCO OPIT/Ag : C/P; Materials + L&O
6
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal Warren Buffet Effect Month 4.5 5.0 5.5 6.0 6.5 7.0 $/troy oz 8/979/9710/9711/9712/971/982/983/984/98 May ‘98 Silver Futures ----------- Past 8 Months www.silverinstitute.org
7
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal Current Ag Prices 1998-99 Silver Prices Month $/troy oz WBE
8
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal Silver Futures Demand exceeded supply for last nine years, in 1997 by 20% High grade ore mostly exhausted, today recovered from base metals and low grade ore Photographic uses increasing 3-6%/yr. 50,000 km/yr BSCCO/OPIT would take all photo-recycling of 1.4 million kg/yr, or 6% of total demand
9
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal J C Paths in BSCCO OPIT/Ag (UW-ASC) Polarized Micrograph Magneto-Optic Image J C Paths @ 12 K > 3.6 10 5 5 A/cm 2 2 > 2.6 10 5 5 A/cm 2 2 > 1.6 10 5 5 A/cm 2 2 > 0 = 0 A/cm 2 2 www.engr.wisc.edu/centers/asc/moi.html
10
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal As Good As It Gets
11
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal J C (B,T) for BSCCO
12
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal J c (77, B) Schwartzkopf, Jiang, Cai, Apodaca, (Prof) ASC/UW (preprint) 13 “H-Q” Tapes 4 Manufacturers
13
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal J c (77, B)/J c (77, 0.1)
14
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal Homework Problem MRI/ SMES Proto-Solenoid –Diameter = 1m; Length = 5m –Wire Diameter = 1mm; #Turns = 5000 –Wire Length = 15.7km; Inductance = 4.95H Operation Parameters –I = 392.5A (J = 50,000A/cm 2 ); V = 1.57V –“R” = 0.004 (J = 50,000A/cm 2, E = 1 V/cm) –E = 0.38MJ; B = 0.49T; P = 616W
15
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal BSCCO OPIT/Ag E-J Characteristic E = aJ n n = 15 T = 77 K E = 1 V/cm
16
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal Solenoid Loop Current: t > t 0 L R(I) I(t) bIL dI dt 0 I(t) b(n1) L (tt)I n 00 1n 1 1n
17
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal “Persistent” Current Decay B = 0.50 T B = 0.25 T 12 Days
18
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal Derating Factors: C/P Multipliers (ASC) 1.0 0.1 µV/cm @ 77 K1.2 Ag Treatment1.5 0.1 T Field1.8 1.15 (B ab) 1 km Length3.0 1.05 ac Operation2.5 Profit (???)1.3 Accumulated Multiplier 31.6 ! 7.1
19
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal The Future of BSCCO/OPIT Derated C/P for BSCCO/OPIT 0.00 20.00 40.00 60.00 80.00 100.00 120.00 1990199520002005201020152020202520302035 Year C/P ($/kA x m) $10/kA m 1998 ASC J C $10.30/kA m
20
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal Malozemoff’s Law ASC “long lengths” 77 K, sf
21
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal “le cidre et le vin” (apples & oranges) 1000 A rms 3000 A rms
22
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal Hysteretic ac Loss
23
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal Cu vs. BSSCO 6 cm dia. Copper Cost: $50/m Current: 1000 A I 2 R Loss: 6 W/m 40 BSSCO Tapes Cost $200/m Current: 4000 A Losses: –ac 4 W/m –cryo/other 2 W/m ---------- 6 W/m
24
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal Cost Recovery Financial Assumptions COF10% Life20 yrs Power0.12 $/kWh
25
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal Trenching Costs Urban/Suburban$500/m Rural$225/m
26
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal Wire C/P Market Entry Thresholds Time C/P ($/kA×m) Substation Elimination SMES/FCL/Transformers 70% New UG Cables
27
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal A Spec Sheet for HTS Wire! What’s Needed? A Spec Sheet for HTS Wire! V = f(I,T,B, , ,A,l, , ), whereV = voltage drop per unit length, I = current, T = temperature, B = magnetic field, = crystallographic orientation, = frequency, A = cross-sectional area, l = wire length, = stress, = strain. C/P $/I×l = g (V,T,B, , ,A,l, , ).
28
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal Electricity: A Life Necessity California, Summer 1996 Quebec, Winter 1997
29
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal “You don’t always get what you want…”
30
P. M. Grant14 July 1999 HTS Wire C/P UpdateMontreal “…you get what you need!”