Download presentation
Presentation is loading. Please wait.
Published byMarjory Hoover Modified over 8 years ago
1
www.egi.eu EGI-InSPIRE RI-261323 EGI-InSPIRE www.egi.eu EGI-InSPIRE RI-261323 Requirements Gathering Nuno L. Ferreira EGI.eu UCST @ UCB 20110215
2
www.egi.eu EGI-InSPIRE RI-261323 Outline Requirements gathering Requirements tracking Update on prioritized RT tickets Current status
3
www.egi.eu EGI-InSPIRE RI-261323 The process TCB EGI Request Tracker VRCs Input Channels for User requirements NGIs HUCs ESFRIs EEF VOs 1) 2) 3) UCST with NGIs and VRCs UCST USAG, OTAG UCB External technology providers EIROs Input Channels for Operation requirements 4) 5) 1) Normalisation, categorisation, filtering bugs 2) Resolve requirements 3) Discuss work-plans of InSPIRE tools 4) Unresolved requirements; work-plans 5) Endorsed and weighted categorised requirements MS305MS305 – User feedback and recommendations
4
www.egi.eu EGI-InSPIRE RI-261323 Request Tracker http://rt.egi.eu
5
www.egi.eu EGI-InSPIRE RI-261323 Dashboard example
6
www.egi.eu EGI-InSPIRE RI-261323 RT manual http://go.egi.eu/wrt
7
www.egi.eu EGI-InSPIRE RI-261323 EMI Prioritized MW requirements High priority requirements identified by 1st UCB meeting: 1.Increased stability and scalability for gLite WMS 2.Better (more verbose and informative) error messages 3.Fixing the known bugs before adding new features 4.Coherency of command line commands, parameters and APIs 5.Better feedback about jobs, automated resubmission of jobs that are stuck on sites TCB UCB MS305 http://go.egi.eu/267
8
www.egi.eu EGI-InSPIRE RI-261323 Drill in EMI TCB UCB MS305 http://go.egi.eu/wrkt UCST VRCs NGIs HUCs ESFRIs EEF VOs EIROs 1.Use Case 2.Configuration 3.Expectation 4.Impact
9
www.egi.eu EGI-InSPIRE RI-261323 UCB 5 key topics (I) –Increased stability and scalability for gLite WMS # Requirements: 7 –High-Energy Physics (VOs: calice, cdf, hone, ilc) –Astronomy, Astrophysics and Astro-Particle Physics (VO: lofar) –Life Sciences (VO: lsgrid) –Fusion (VO: fusion) –Better (more verbose and informative) error messages # Requirements: 6 –High-Energy Physics (VOs: ilc) –Astronomy, Astrophysics and Astro-Particle Physic (VO: lofar) –Life Sciences (VO: lsgrid, vlemed) –Life Sciences Grid Community –NGI_IL –Fixing the known bugs before adding new features # Requirements: 1 –Other (VO: desktopgrid.vo.edges-grid.eu)
10
www.egi.eu EGI-InSPIRE RI-261323 UCB 5 key topics (II) –Coherency of command line commands, parameters and APIs # Requirements: 4 –High-Energy Physics (VO: pheno) –Life Sciences (VO: vlemed, enmr.eu) –Life Sciences Grid Community –Better feedback about jobs, automated resubmission of jobs that are stuck on sites # Requirements: 5 –Astronomy, Astrophysics and Astro-Particle Physics (VO: lofar) –High-Energy Physics (VO: cdf) –Life Sciences (VO: enmr.eu) –Fusion (VO: fusion) –HealthGrid project
11
www.egi.eu EGI-InSPIRE RI-261323 Current status Requirements queue: User Com’ty.: 178 Operation Com’ty.: 85 Total: 263
12
www.egi.eu EGI-InSPIRE RI-261323 EGI-InSPIRE www.egi.eu EGI-InSPIRE RI-261323 Requirements Gathering RT system Karolis.Eigelis@egi.euKarolis.Eigelis@egi.eu Requirement processingNuno.Ferreira@egi.euNuno.Ferreira@egi.eu EGI.eu UCST UCST@egi.euUCST@egi.eu
13
www.egi.eu EGI-InSPIRE RI-261323 A requirement These parts must be clear and detailed –Use Case (based on experienced issue) –Configuration, Environment (where issue was experienced) –Expectation (what is expected) –Impact for user community (the impact of solved requirement)
14
www.egi.eu EGI-InSPIRE RI-261323 Providing solution 1.Consistency check 2.Responsible allocated 3.Completeness check 4.Providing in-house solution 5.Involve external solution providers 6.Validation
15
www.egi.eu EGI-InSPIRE RI-261323 Some RT features
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.