Presentation is loading. Please wait.

Presentation is loading. Please wait.

Riza Atiq Rahmat UKM ITS Initiative. Architecture Interoperability Integration Physical Architecture (http://www.iteris.com/itsarch/documents/physical/physical.pdf)http://www.iteris.com/itsarch/documents/physical/physical.pdf.

Similar presentations


Presentation on theme: "Riza Atiq Rahmat UKM ITS Initiative. Architecture Interoperability Integration Physical Architecture (http://www.iteris.com/itsarch/documents/physical/physical.pdf)http://www.iteris.com/itsarch/documents/physical/physical.pdf."— Presentation transcript:

1 Riza Atiq Rahmat UKM ITS Initiative

2 Architecture Interoperability Integration Physical Architecture (http://www.iteris.com/itsarch/documents/physical/physical.pdf)http://www.iteris.com/itsarch/documents/physical/physical.pdf Logical Architecture (http://www.iteris.com/itsarch/documents/logical/logvol1.pdf )http://www.iteris.com/itsarch/documents/logical/logvol1.pdf Sony TV JVC DVD Player Philips VCR Panasonic Tuner Grundig CD Audio Player Akai Amplifier MECSpeakerMECSpeaker MECSpeakerMECSpeaker

3 Wireless Fixed-point to fixed-point Communications Transport Control Centre Urban Traffic Control Traffic Surveillance System Traffic Expert System MPMP Smart Camera for traffic surveillance, incident detection and disaster detection MPMP Roadside UKM Intelligent Urban Traffic Management Architecture MPMP MPMP Intelligent Urban Traffic Control

4 UKM traffic light and surveillance camera in Bangi

5 Wireless Communication System Control room

6 Incident and disaster detection

7 Logical Architecture Determine system and sub-system boundary Determine Function of each system and sub-system Determine data flows between systems and subsystems. http://www.iteris.com/itsarch/documents/logical/logvol1.pdf

8

9 UKM Control Room

10

11

12 20m poll installation @ Stadium (Pavillon) 20m poll installation

13 Communication Hub Installation

14 Pavillon (UKM) 07/03/2010 Wireless communication installation

15 IP camera installation at UKM Stadium (Pavillon) IP camera installation

16 Hotel Equitorial (25/2/10) IP camera installation

17 UKM II Entrance (25/2/10) IP camera installation

18 IP camera installation at Warta traffic junction, Bangi IP camera installation

19 Replaced faulty cables (12-13/03/2010) Wiring work @ traffic junctions (J4, J5 & J6)

20 CCTV installation & configuration (14-15/03/2010) Traffic junctions (J4, J5 & J6)


Download ppt "Riza Atiq Rahmat UKM ITS Initiative. Architecture Interoperability Integration Physical Architecture (http://www.iteris.com/itsarch/documents/physical/physical.pdf)http://www.iteris.com/itsarch/documents/physical/physical.pdf."

Similar presentations


Ads by Google