FESS/Ops Shutdown Summary Week Ending 3Aug12
2
CUB Shut-Down Activities Shut Down Plant on July 21 st @0615 hrs. Electrical – High Voltage Air Switch/Fuse Annual PM – Measured 4160 Cabinet for protective Barrier Installation – Replaced Chiller #1 4160 X120 Volt Transformer – Found 4 Ea. Damaged Control Circuit Plugs on 1500 Amp DHP Breakers Called in Machinists to fabricate replacement parts
3
CUB Shut-Down Activities Electrical (Continued) – CUB E Gen Transfer Switch Repaired – Repaired LCW De-oxygenation Skid Starter Connections (identified through Thermography) – MCC2 Replaced Faulted PONI Modules
4
CUB Shut-Down Activities Mechanical – Replaced 12” Suction Valves on CP10/CP11 Process Chilled Water Pumps for Muon/MI60/MI65 – Chgd. Muon LCW Filters – Performed PM on all Circulating Pumps – Inspected and Cleaned tower Water Pump Strainers Restarted Plant July 22 nd 1530 hrs
5
4 Bay S&C Switch Maint.
6
13.8 X 480 Volt Transformer Maint.
8
1500 Amp DHP Breaker Control Circuit Plug Stationary Receptacle
9
1500 Amp DHP Breaker Control Circuit Plug
10
Chiller #1 4160 X 480 Volt Transformer
11
4160 X480 Volt Transformer Replacement
12
E Gen Transfer switch Repairs
13
CP10/CP11 Suction Valve Replacement
14
Process Chilled Water Strainer Media Found in CP10/CP11 Valves
15
Additional ICW Filter to Softeners Installed
17
Temporary AC Units Set up to provide required Cooling
18
XG Computer Room West
19
XG Computer Room East
20
Control Room
21
MAC Computer Room
22
WH Telecom Switch Room
23
XG FIRUS Room
24
WH Basement 90 Ton Chiller
25
G2 Service Bldg./Beam Pipe Grout Removal Cooling
28
WH Storm Water Pit Sump
30
~ 15 Cu. Yds. Of Gravel in Sediment Basin
31
We all Float Down Here