Download presentation
Presentation is loading. Please wait.
Published byDerick Gray Modified over 8 years ago
1
A&E Services Annual Sales Meeting, Atlanta GA November 13 – 15, 2014 Presented by: Mark Leedy and Bill Wilke
2
Develop & promote design tools A&E Account Management RSM Support Product Management conduit Recent Successes What We Do
3
Project: South West Allen County Schools, Fort Wayne, Indiana Specified by: Moore Engineering, Tom Moore Integrator installing: ESCO Vicon Project Value: $400,000 Recent Successes Project: TransCanada Pipeline (to Texas, phase one) Phase one- Keystone Hardisty Terminal Specified by: Don Greenwood and Associates, Houston, TX Vicon Project Value: $120,000
4
Project: Snohomish County Detention, WA Specified by: R&N Systems Integrator installing: MCS Vicon Project Value: $257,000 Recent Successes Project: Coffee County Detention Center, TN Specified by: R&N Systems Integrator installing: CCC Group Vicon Project Value: $125,000
5
Project: Plaquemines Parish, LA Specified by: L. R. Kimball Integrator installing: MCS Vicon Project Value: $681,000 Recent Successes Project: Arlington Memorial Hospital Behavior Health Expansion, TX Specified by: SSR- Smith Seckman Reid, Integrator installing: Simplex / Tyco Integrated Vicon Project Value: $37,000
6
Project: Valley International Airport, Harlingen, TX Specified by: Moye Consulting Integrator installing: ESD (Electronic Security Design of Texas or Superior Alarms) Vicon Project Value: $80,000 Recent Successes Project: Reno County Detention, KS Specified by: Buford Goff & Associates Integrator installing: Southern Folger Vicon Project Value: $179,000
7
Web info center CSI formatted Division 28 specs in MS Word f Document library Storage and bandwidth calculator Camera power supply Chart Lens Calculator Case studies Links to Videos Links to Autodesk Seek and ARCAT web sites A&E Design Tools
8
AutoDesk Seek- REVIT This site allows you to download CAD drawings, RTF files and printable product specs for all your projects. In addition, REVIT models combine scaled 3D renderings with embedded attributes and specs that allow you to integrate security systems into the overall building infrastructure.
9
Annual Sales Meeting, Atlanta GA REVIT
10
REVIT -Field of View Graphic
11
November 13 – 15, 2014 Annual Sales Meeting, Atlanta GA REVIT -Field of View Graphic
12
Seek Analytics Monthly Report
13
Arcat, BIM and SpecWizard This site provides a BIM library and Specifications which helps you to quickly and efficiently specify security products into all of your designs.
14
November 13 – 15, 2014 Annual Sales Meeting, Atlanta GA SpecWizard
15
Produce a Division 28 CSI formatted spec
16
November 13 – 15, 2014 Annual Sales Meeting, Atlanta GA Multi-layered support to the A&E community Data base maintenance Over 600 qualified A&E firms Targeting trends seeing more RCDD’s less PE’s Architectural firms subcontracting security to specialized consultants Continue to look for new firms to interact with Continuously expand “face time” opportunities A&E Account Management
17
On-site support- system design and calculations Lunch and Learns Relationship building – A&E / RSM visits Professional services promotion Training Specification and Riser drawing reviews A&E Summit A&E Services
18
Account contact management Cross-territory communication Integrator/specifier management Lunch & Learns Project registration Identify new vertical markets and A&Es Drive frequency and interaction of visits RSM Support
19
Project Registration
20
Pre Bid System design and review Configurations/calculations Equipment selection- capabilities and limitations Existing system expansion/upgrades reviews Post Bid Value engineering support Submittal packages Specification compliance Competitive product evaluations RSM Support
21
November 13 – 15, 2014 Annual Sales Meeting, Atlanta GA Establish quarterly meeting with product management Feedback on active projects Competitive product comparison share needs and trends in current designs Product Management
22
November 13 – 15, 2014 Annual Sales Meeting, Atlanta GA Vicon’s 9 th A&E Summit March 8 th thru 10 th, 2015
23
Last year’s Summit
24
November 13 – 15, 2014 Annual Sales Meeting, Atlanta GA Location? Hyatt Regency Mission Bay Spa and Marina in San Diego, CA Weather? The March average temperature in San Diego is 65 to 68 Degrees What is Vicon Providing? We will provide round trip air transportation to the San Diego International Airport, transportation to and from the resort, a deluxe room Sunday and Monday night, all meals on Monday and Breakfast and Lunch on Tuesday. There will be a special event on Monday night. Can I receive continuing education credit? Yes, we will provide a certificate of attendance confirming the Summit content and contact hours. Frequently Asked Questions
25
Can I spend additional days at the resort? Yes, depending on space available on the dates you would like to stay. We will be happy to provide information on room rates and airport transportation. Attendees will be responsible for any additional costs. Can I bring my significant other? Yes, an attendee can bring their significant other. They will be responsible for the cost of the additional airfare. We will include the guest in the Monday night event. Frequently Asked Questions
26
Frequent visits = strong relationships Don’t show up & throw up Always close for the next meeting Always have a reason for your next meeting Engage your team What You Can Do
27
Expand Summit 8 consecutive years of extremely successful summits Expand on the frequency or the magnitude of the event Presentation tools and Materials Enhanced slide sets Branded Giveaway items Presentation brochures/ leave behind Marketing support expansion New System Design Guide Tech Drawings Topographical/Riser Design Methodology/Process flow chart Design process related Videos Going Forward
28
A&E services is one of our most successful programs Provides ongoing Benefit to our company and it’s sales effort Continuation of established programs i.e. AutoDesk, ARCAT, and Summit is paramount Additional resources guarantee increased future success Conclusion
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.