Presentation is loading. Please wait.

Presentation is loading. Please wait.

Banihal Tunnel (Banihal-Qazigund)- Jammu & Kashmir Project :Independent Engineer Services for Four laning of Quazigund to Banihal section from Km. 189+350.

Similar presentations


Presentation on theme: "Banihal Tunnel (Banihal-Qazigund)- Jammu & Kashmir Project :Independent Engineer Services for Four laning of Quazigund to Banihal section from Km. 189+350."— Presentation transcript:

1 Banihal Tunnel (Banihal-Qazigund)- Jammu & Kashmir Project :Independent Engineer Services for Four laning of Quazigund to Banihal section from Km. 189+350 to Km. 204+700 of NH-1A

2 Jammu & Udhampur (By Pass)-Jammu & Kashmir Project: Independent Engineer Services for Rehabilitation, Strengthening and 4- laning of Jammu & Udhampur section of NH-1A, from Km. 15+000 (on Jammu Bypass) to Km. 67+000.

3 Elevated Project- Patna (Bihar) Project: Authority Engineer' for the Project of Construction of Elevated Corridor from AIIMS (On NH—98) to Digha on Ganga Path (11.90 Km) in the State of Bihar on EPC Basis.

4 Hydro Power Project-Kalnai Project: Consultant for providing of Comprehensive Contract Management Services for Implementation of EPC Contract, for construction of 48 MW Lower Kalnai HEP, at Kishtwar & Doda.

5 Dibang Bridge Project: Independent Engineer Services for Construction of bridges across Dibang river system and connecting road between Bomjur– Meka ( NH-52) covering length of 18.950 Km and construction of bridge across river Lohit at Alubari Ghat and connecting road between Chowkham– Digaru covering length of 12.00 Km in Arunachal Pradesh (total 30.950 KM) on Design, Built, Finance, Operate and Transfer (“BOT”) basis under Arunachal Pradesh package of Road and Highways (SARDP-NE).

6 Four Laning of Goa / Karnataka-Border to Kundapur Project: Independent Engineer Services for Four Laning of Goa / Karnataka Border to Kundapur section of NH-66 (Earlier NH-17) from Km. 93.700 to Km. 283.300 having Design length 187.240 Km) in the state of Karnataka Under NHDP Phase IV on Design, Build, Operate, Transfer (DBFOT) Pattern. It consists of two twin tubes tunnels of 1.14 Km.


Download ppt "Banihal Tunnel (Banihal-Qazigund)- Jammu & Kashmir Project :Independent Engineer Services for Four laning of Quazigund to Banihal section from Km. 189+350."

Similar presentations


Ads by Google