1 Lockout/Tagout “The Control of Hazardous Energy” LOTO Lockout Tagout
3
2 Lockout/Tagout LOTO Lockout Tagout Tagout LOTO
4
3 …covers servicing and maintenance of machines where UNEXPECTED start-up or release of stored energy could cause injury. Lock Out Tag Out…
5
4 n Pneumatic n Hydraulic n Steam n Thermal n Chemical n Gravity Energy Sources n Electricity
6
5 Lock Out/Tag Out… Does not Cover Normal production operations Cord & plug connected equipment
7
6 Definitions ENERGY CONTROL PROGRAM Authorized employees
8
7 Definitions ENERGY CONTROL PROGRAM Affected employees
9
8 Capable of being locked out Other employees ENERGY CONTROL PROGRAM
10
9 Lockout/Tagout Lockout vs. Tagout
11
10 Lockout/Tagout Lockout vs. Tagout
12
11 Materials & Hardware Company provides LOTO use only Standardized Jim Brown Maint
13
12 Materials & Hardware Green Printing Chris Johnson Maintenance
14
13 Specific Procedures Preparation for Shutdown LOTO Lockout Tagout Shutdown Isolation
15
14 Specific Procedures Release of stored energy LOTO Lockout Tagout LOTO device application Isolation verification
16
15 Release from Lockout/Tagout Machine or Equipment Employees Device Removal
17
16 Clear tools and equipment Remove employees Energize and test De-energize & reapply procedures Temporary Removal
18
17 Exception Release from Lockout/Tagout Machine or Equipment Employees Device Removal
19
18 Release from Lockout/Tagout Lockout/Tagout Removal Exception