Lend Lease New York Healthcare  75 Dedicated Healthcare Professionals in New York City  Last 10 years: 127 Local Healthcare Projects Totaling $2.2 Billion.

Similar presentations


Presentation on theme: "Lend Lease New York Healthcare  75 Dedicated Healthcare Professionals in New York City  Last 10 years: 127 Local Healthcare Projects Totaling $2.2 Billion."— Presentation transcript:

1

2 Lend Lease New York Healthcare  75 Dedicated Healthcare Professionals in New York City  Last 10 years: 127 Local Healthcare Projects Totaling $2.2 Billion  ASHE Certified Professionals  ICRA and ILSM Expertise  Projects at NYU Langone Medical Center: - NYU Tisch - EP Lab Equipment Upgrades - NYU Tisch - 16th Floor HEPA Rooms - NYU HCC - 15th Floor Pediatric ICU - NYU Tisch - 5th Floor Electrophysiology Suite - NYU HCC - 14th Floor Cath Lab Renovations - NYU Tisch - 6th Floor Hybrid OR Renovations - NYU Tisch - 16th Floor Bone Marrow - NYU Tisch - 15th Floor East ICU - NYU HCC - 12th Floor Epilepsy - NYU Tisch - 15th Floor West ICU - NYU HCC - 13&14 CVC NYU Tisch Hoist - NYU - White Building - NYU HCC - 1st Floor Blood Donor - NYU Tisch - 12th & 17th Floor Step Down Units - NYU HCC - 11th Floor CVC Short Stay - NYU Tisch – 2nd Floor Radiology Renovations - NYU Tisch - 11th Floor Palliative Care - NYU Tisch – Transformers Current Projects: - NYU Campuswide Sandy-Related Projects - NYU Tisch 1 MEP

3 Proposed Team  Relevant Experience  Continuity – Precon to Construction  Continuity Between Projects – Key Staff  Unmatched Familiarity with Campus & Policies

4 Importance of Single Construction Manager  Tisch 1 Cafeteria  Tisch 2 MRI  Tisch 2 Ductwork Distribution  Tisch 1 MEP

5 Overlap of Three Projects

6 Importance of Single Construction Manager  Tisch 1 Cafeteria  Tisch 2 MRI  Tisch 2 Ductwork Distribution  Tisch 1 MEP

7 Overlap of Three Projects

8 MEP Significance of the Two Projects  Preconstruction - Infrastructure Information for Cafeteria Installation - Coordination of Ceiling Heights - Early Selective Demolition for better Understanding of Field Conditions - Coordination of Public Corridor  Coordination - Shop Drawings & Equipment - Servery Equipment Suppliers - Scheduling - Demolition - Structural Steel Reinforcement - Installation & Infrastructure (ie: Servery with hot water and chilled water piping)

9 Importance of Single Construction Manager  Tisch 1 Cafeteria  Tisch 2 MRI  Tisch 2 Ductwork Distribution  Tisch 1 MEP

10 Tisch Logistics

11 MRI Logistics

12 Tisch Experience

13 Lend Lease Value Proposition