Presentation is loading. Please wait.

Presentation is loading. Please wait.

27SEP2008Calo Running and Operation Monday Meeting - Xvc1 ECS Xavier Vilasis-Cardona.

Similar presentations


Presentation on theme: "27SEP2008Calo Running and Operation Monday Meeting - Xvc1 ECS Xavier Vilasis-Cardona."— Presentation transcript:

1 27SEP2008Calo Running and Operation Monday Meeting - Xvc1 ECS Xavier Vilasis-Cardona

2 27SEP2008Calo Running and Operation Monday Meeting - Xvc2 Achievements an issues fwComponent control is centralised for all PVSS production projects DB problems in PSDCST1 solved Project to monitor the status of Calo Platform crates started (Maxim) HV panels by Anatoli to be connected to PVSS Oracle archive. HV_TOP units –Control on LV and MV units disabled –State is taken into account Project SPDDCST1 is ready and working –About to be integrated in global DCS in PS1 Comment on ‘project modification’ times. Echva01w booting problems. (?)

3 27SEP2008Calo Running and Operation Monday Meeting - Xvc3 fwInstallation – new procedure From now on, a new central installation of the fwInstallation Tool will be used It means that subdetectors do not have to care about it any more (unzip of new versions), it will be done centralized and common for everybody. The local copy of the fwInstallation was removed (panels, scripts, etc) and a new path was included in your projects config: /group/online/ecs/NewPVSSShortcutProjects/GlobalProject If you want to install something, be aware that now you should look for the installation panel in this new path. Please do NOT modify anything that is in this path. In every project, there is a control manager fwInstallationAgent that connects to a database and keeps control of the project info. In order to avoid the registration in the database of development projects (e.g TEMPORARY_ITECS, OTDCS_Dev), everytime you want to copy a (control) project to a different name, BEFORE doing it, set this manager to manual and STOP it. And everytime you see a pop-up window asking you "This project is not registered in the database, do you want to register it now?" You should say: NO

4 27SEP2008Calo Running and Operation Monday Meeting - Xvc4 Details not affecting us Make sure that your projects are concordant with the convention: –project name and system name should be the same –all upper case – Eg.R1HV1, VEDAQA1 (If needed, I can help you changing project/system names) For more detailed info, please have a look at: https://edms.cern.ch/file/732486/3/LHCb_ECS_Guidelines.pdfttps://edms.cern.ch/file/732486/3/LHCb_ECS_Guidelines.pdf At any time, if you decide to change the port numbers, it is important that you tell it to Clara and/or me. It affects the integration into global.

5 27SEP2008Calo Running and Operation Monday Meeting - Xvc5 CARACKMON1 Running in cadcs02w Numer 184 Information –Board temperatures in crates : CROC (Frederic) TVB (Laurent) SPDCB (Mar) Maraton PS delivered intensity (Beat) Turbines (Beat) –status –Turbine consumption –Temperature VFE Power Supplies Intensity (Anatoli) Sensors in 6U boards ? (Anatoli)

6 27SEP2008Calo Running and Operation Monday Meeting - Xvc6 DCS status PVSS projects for VFE temperatures are ready Missing –DSS connection –Threshold alarms –Automatic actions


Download ppt "27SEP2008Calo Running and Operation Monday Meeting - Xvc1 ECS Xavier Vilasis-Cardona."

Similar presentations


Ads by Google