PRESENTED BY: Al Cobb, Founder, Sips School www.sipschool.com CHAPTER 7 OF 10 Layout & Panel Installation SPONSORED BY:
2
www.sips.orgChapter 7 – Layout & Panel Installation Learning Objectives Installing SIPs Walls and roof Getting started and staying efficient Tools and techniques Preparation for other trades Rigging SEAL SEAL SEAL Labeling Weather issues
3
www.sips.orgChapter 7 – Layout & Panel Installation The Drawings Called layout drawings?? Review Rough openings Support Point loads!! Type of package Site cut Yield and panel nesting
4
www.sips.orgChapter 7 – Layout & Panel Installation Panel Prep Safety Feet on the ground Crane time (sleeping operator) Find manufacturing errors Preassembly
5
www.sips.orgChapter 7 – Layout & Panel Installation A Good Place to Start Corner Bracing requirements Minimal Straightening still required Wind SIP =Sail
6
www.sips.orgChapter 7 – Layout & Panel Installation Rigging Safety OSHA specs Walls vs. roof Windows and doors Temporary holes strapping Roof rigging Flat vs. pitched Wind tag line Finding a handle Panel adjustment while still attached
7
www.sips.orgChapter 7 – Layout & Panel Installation Floor Systems Platform Rim board Balloon Hanging Load bearing interior partitions, floor systems, and keeping the SIP install on track
8
www.sips.orgChapter 7 – Layout & Panel Installation Electrical and Other Trades Communicate Site meeting prior to start Explanation of the system Panel adjustments to accommodate other trades Helping the electrician vs. unnecessary cost increases
9
www.sips.orgChapter 7 – Layout & Panel Installation Tools Basics Specialty tools
10
www.sips.orgChapter 7 – Layout & Panel Installation Seal as you go Think like a molecule of air Use you building science knowledge Mastic Foam (one- and two-part) Gaskets
11
www.sips.orgChapter 7 – Layout & Panel Installation Weather Issues When to seal if panels are wet Sealing and a weather-tight roof SIP tape sticking or not
12
www.sips.orgChapter 7 – Layout & Panel Installation Planning for Efficiency Staging in order Line of sight Access to staging area Plumbing and straightening walls Sealing too soon Panel joint layout vs. joint growth Setting last wall panel using the corner
13
www.sips.orgChapter 7 – Layout & Panel Installation Labeling as you go Label panels and deck Label electrical drilled paths Voids in panel to drill and fill
14
www.sips.orgChapter 7 – Layout & Panel Installation Sealing Behind Other Trades Changing the order of construction Insulating combined with framing