Green Labs Symposium | March 15, 2016 Travis Wanat, Senior project manager Department of Facilities Efficient building design and operation Fueling high performance nano-research
2
Construction 4
3
Access points for construction MIT.nano site
4
Phase 1: utility enabling
5
Site constraints - existing utility enabling Campus Utility Infrastructure Chilled Water Electrical Steam Fire Protection Domestic Water Natural Gas Stormwater Sanitary Compressed Air Vacuum Bldg. 24 Bldg. 13 Bldg. 26 Bldg. 16 Bldg. 10 Bldg. 4 Bldg. 8 MIT.nano (Bldg. 12)
6
Site constraints - existing utility enabling
7
Building 39
8
Site constraints - existing utility enabling
9
Site constraints – aging infrastructure
10
Phase 2: construction
11
Site constraints - construction logistics
12
Unforeseen conditions – mercury abatement
13
Demolition 5,500 tons of concrete recycled 2,203 lineal feet of mercury contaminated pipe removed 150 lbs of mercury removed
14
Chilled water 2,100 lineal feet CHW installed underground
15
Chilled water 250 X-rayed welds
16
Electrical 12,830 lineal feet of rigid conduit installed underground
17
Slurry wall Cap beam 44 panels placed = 34,941 sf 3,610 cubic yards of concrete 39 working days to complete 800 lineal feet placed 33,550 cubic yards of soil excavated
18
Steel 2,100 tons Average of 22 tons installed per day 13% complete as of 3/14/16