Measure G Bond Projects
3
Message from the President ….. Monument Refurbishment Project
4
Measure G Bond Status Capital and Scheduled Maintenance Projects SRID Expenditures by Site District Program Overview PC Fine Arts – 2016 (Now)PC Library – 1960s (Then)
5
Hazardous & Safety/ADA Projects Path of Travel ADA ImprovementPlano Fire Lane Improvement Campus Security Upgrades Network Video Recorder & Science Math Electronic Locks
6
Library & LRC Capital Projects Constructed a library and learning center with modern computer equipment and furniture. Before Construction Completed Capital Project
7
SCIENCE MATH REMODEL Remodeled the building interior and installed new laboratory equipment.
8
FITNESS CENTER CAPITAL PROJECT Constructed a new fitness center building and installed modern exercise equipment.
9
CAMPUS PLANT IMPROVEMENTS Installed a newer chilled water loops with new air handlers to be installed to provide conditioned air.
10
STUDENT CENTER REPAIR PROJECT Replaced the roof system, removed the swamp coolers, installed air conditioning, asbestos removal, and refurbished the Student Center interior.
11
Classroom & Building Upgrades Music Room Riser ReplacementNew Boiler for Locker Room Showers Academic Center, Fine Arts, Communication Arts, Health Careers, and Science Math HVAC & Roof Replacements Purchased and installed new classroom carpet/flooring and furniture or building equipment throughout the campus. New furniture has been ordered and will be installed in late May 2016 in CT 1303, CT 1304, SM 101A, SM 101B, SM 125, AC 118, AC 119. Also, new carpet is planned for Theater.
12
GYM Roof & HVAC Project Replaces, repairs and restores the roof system and completely replaces all HVAC for the Gym, Coaches Row, Locker/Shower rooms, weight room, 2 classrooms, restrooms, Trainer’s area and Nurses office. The Gym will receive a new metal standing seam roof system, the remainder of the project will have a Built up Roof (BUR) installed. The old swamp coolers will be removed and utilize the newer chilled water loops with new air handlers to be installed to provide conditioned air. Estimated Completion December 31, 2016
13
District SRID Spending Summary Original Measure G Budget: $ 180,000,000 Interest & Other Revenues: $ 23,043,193 Total SRID Funds: $ 203,043,194 Total Funds Spent To Date: $ 139,235,821 Total Funds Unspent To Date: $ 63,807,373
14
2002 - SRID Expenditures By Site
15
2002 - SRID Unspent Funds By Site
16
District Program Overview Design Projects 2nd Quarter Ending December 31, 2015