Download presentation
Presentation is loading. Please wait.
Published byAshlyn Stevenson Modified over 8 years ago
1
LEB Meeting Status of the LEB (J. Gerl) Physics opportunities at the LEB (D. Ackermann) Latest news on the layout of the buncher/spectrometer (J. Winfield) Status of magnet for LEB (G.Pal, P.R. Sarma, A. DattaGupta, C. Nandi) How to proceed
2
252 Experiments with slowed and stopped beams Laser spectroscopy (LASPEC) Decay spectroscopy (DESPEC) Energy buncher / spectrometer In-flight spectroscopy (HISPEC) Precision mass measurements (MATS)
3
Requirements from experiments MATS/LASPEC - buncher as originally specified - Laser and trap set-ups behind the shielded cave area - Laser transfer line from laboratory area to experiment area DESPEC - experiment area before spectrometer and behind buncher - buncher requirements as originally specified - different set-ups with detector radii between 1.0 m and 3.5 m HISPEC - experiment area before spectrometer - spectrometer requirements as originally specified ?? - one set-up with different -arrays - LYCCA wall only behind spectrometer New Super-FRS - high resolution mode New
4
Situation with the LEB Building LEB Building not included in FAIR MSV → No funds within FAIR contract → None of the LEB experiments can run in a reasonable way → Realization within current construction plan technically not possible NUSTAR Actions - launch an architect study on cost and staged realization plan - search for additional resources - convince FAIR Council and funding agencies on necessity of LEB If Council agrees and additional funds become available timely realization is still possible !!!
5
LEB ground level
6
LEB 1. floor level
7
LEB cross section
8
Study Site Preparation Building Cost from Z-Bau 15% surcharge Demolition/ supplement Technical installation Cost from Z-Bau 26% surcharge Demolition/ supplement Outdoor installation Installations and Art Cost from Z-Bau for shielding blocks Additional charges Total Net cost estimate in 2009 € LEB Costing
9
Details of Technical Installation Air technical installation 219 Electrical power 706 Heating, cooling, gases,…3043 Building automation 395 Network, telecommunication 195 Total4558 Net cost estimate in 2009 k€