Download presentation
Presentation is loading. Please wait.
Published bySheryl Bradley Modified over 8 years ago
1
56 Resources u Icons represent resources u Dynamic resources must be assigned a path network u Resources position at nodes, not locations u “Specs” field defines path, nodes, motion and rules
2
57 Resource edit table Resource selection Resources
3
58 Resource Specifications assign the path network, motion, node and rules information Resource Specifications assign the path network, motion, node and rules information
4
59 Resource Points let the resource occupy a position away from the node Resource Points let the resource occupy a position away from the node
5
60 Now, along with the instructor, enter the two Resources for the “Shop Floor” model Transporter Operator Resources
6
61 Processing What Am I ? Where Am I ? What Happens ? Now What Am I ? Where Do I Go ? Under What Circumstances ? How Do I Get There ?
7
62 Processing u Defines what entity at what location has what happening to it. u Select entity to be addressed in the Tools window. u Click on the initial entry location, then the first destination. Do remaining locations the same way. u Address individual Operation Logic and Move Logic entries as required
8
63 Select “Entity” to begin process definition Select “Entity” to begin process definition
9
64 1. Click on “Part_Storage” icon to begin process definition 1. Click on “Part_Storage” icon to begin process definition 2. Move arrow to first destination and click to record initial movement 2. Move arrow to first destination and click to record initial movement
10
65 Entity Output Change u If an Entity changes form its Output name may change u Select the new entity name from the pull down window in the output field
11
66 Raw_Part enters the Lathe Raw_Part enters the Lathe Finish_Part leaves the Lathe Finish_Part leaves the Lathe
12
67 Routing Rules Establish the condition for selecting the next location u FIRST Available - Go to the first listed location with available capacity u Quantity Field - Shows the number of entities that will go to the destination
13
68 Select the desired Routing Rule This is the Quantity indicator This is the Quantity indicator
14
69 Output Quantity u Create an Output Quantity of X in the quantity field of the routing dialogue box
15
70 Operation Logic u Operation Logic describes what happens to an entity at its current location u Operation Logic uses a series of statements or code to cause ProModel to do what you want u The Logic Builder can help you write these statements correctly
16
71 Operation Statements Cause an entity to do some action or activity u WAIT or ^ or TIME Causes an entity to wait at a location for a specified time Syntax:WAIT
17
72 Operation Statements u GET Causes an entity to request the use of a resource Syntax:GET u FREE Causes an entity to release a previously captured resource Syntax:FREE
18
73 Operation Statements u USE Causes an entity to request a resource for a specified time and then release the resource Syntax:USE for u Usual Syntax of Get/Free Statements Get Operator Wait N(5,2) Free Operator
19
74 Operation Statements u ACCUM Accumulates, without consolidating, a specified quantity of entities at a location Syntax:ACCUM u GRAPHIC Causes an entity to change to a different graphic Syntax:GRAPHIC
20
75 Logic Builder u A way to enter logic or the names of defined items u Works from any field that accepts logic or expressions u An easy way to ensure the syntax is correct
21
76 Use the “Logic Builder” to create process logic or when you are unsure of the syntax. Use the “Logic Builder” to create process logic or when you are unsure of the syntax.
22
77 Gives a short explanation Buttons change with selected statement Buttons change with selected statement Other options are
23
78 1. Select a statement such as WAIT 1. Select a statement such as WAIT 2. Click on Time, Keypad or Build Expression or enter a time 2. Click on Time, Keypad or Build Expression or enter a time
24
79 When the expression or logic is completely built, click on Paste to place the logic in the window from which the Logic Builder was selected. Then you may Close the Logic Builder or keep it open for the next statement. When the expression or logic is completely built, click on Paste to place the logic in the window from which the Logic Builder was selected. Then you may Close the Logic Builder or keep it open for the next statement.
25
80 Move Logic u Activated from the Routing - Move Logic field u Specifies Path Network, Time or Resource to make the move u May apply logic before and after the actual move
26
81 Click on Move Logic to bring up the window Click on Move Logic to bring up the window Click on Build button or use right mouse button to bring up the Logic Builder window Click on Build button or use right mouse button to bring up the Logic Builder window
27
82 Basic category brings up standard Move statements Basic category brings up standard Move statements
28
83 Select the Resource with which the Entity is to move Select the Resource with which the Entity is to move Choose Paste and then Close when finished Choose Paste and then Close when finished
29
84 Arrivals u Select the entity to arrive from the Tools window u Click on the Arrival location u Edit Quantity Each, First Time, Occurrences and Frequency as appropriate
30
85 Arrivals u First Time may have an entry or be left blank u INFinite may be used in Occurrences to create an unending stream of arrivals u Frequency may be a constant, a macro, a variable or a distribution
31
86 1. Select “Entity” to arrive 2. Select “arrival” location
32
87 The First Time button brings up scheduling options The First Time button brings up scheduling options
33
88 Now, along with the instructor, enter the arrival pattern for the “Shop Floor” model Arrivals
34
89 Five Common Errors 1. No process defined at a destination 2. Missing a path network interface 3. Path network nodes not connected 4. Failure to release a resource 5. Failed arrivals due to insufficient capacity
35
90 No Process Defined This is the error message
36
91 Missing Interface This is the run time error message for a resource This is the run time error message for a resource
37
92 Two Unconnected Nodes N4 This is the run time error message This is the run time error message This is the break in the path This is the break in the path N3
38
93 Entity Exits with a Resource Job_Complete trying to Exit with Order_Tech Job_Complete trying to Exit with Order_Tech
39
94 Failed Arrivals This is the error message, seen at the end of the simulation run
40
95 Running the Simulation 1. Select Simulation Options first. a. Check the Output Path. b. Check run time options and clock precision. c. Select Output Reporting option. 2. Then select Run or Save and Run.
41
96 Select “options” before running the simulation to set values Select “options” before running the simulation to set values
42
97 Define run length by calendar date or weekly time for shift use Define run length by calendar date or weekly time for shift use... or define run length by hours... or leave blank... or define run length by hours... or leave blank Set the number of replications Set the number of replications
43
98 Select “Information” during run time to view in-process model status Select “Information” during run time to view in-process model status
44
99 Right Click Features 1. Layout widow - no edit table open a. Right click on a location lets you edit the location or the background b. Similarly, right click on resource, variable, etc. does the same thing c. Right click on the background lets you edit the background or most of the View menu options
45
100 Right Click Features 2. Layout window - edit table open a. Takes you to that record in the edit table b. Lets you delete the graphic or that particular record c. In Path Networks lets you add a joint or delete the segment d. In Processing lets you add a joint to the routing arrow, delete that routing or delete the entire process
46
101 Right click on the Transporter to bring up this edit option Right click on the Transporter to bring up this edit option
47
102 Right click on the background brings up these options Right click on the background brings up these options
48
103 Right click on a path segment takes you to the segment and gives you edit options Right click on a path segment takes you to the segment and gives you edit options
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.