Download presentation
Presentation is loading. Please wait.
Published byByron Richardson Modified over 8 years ago
1
Chung-Chieh Wang ( 王重傑 ) Department of Earth Sciences, National Taiwan Normal University 29 February 2016 2015 年科技部計畫研究成果發表會 次領域未來規劃討論 天氣動力次領域
2
2 Research Outlook from Discussion in 2015 TTFRI 及跨單位合作,陸續建立資料庫(含防火牆)、觀測 儀器 / 設施 / 平台、計算資源,以服務學界 當前突破性議題包括:颱風、豪雨,及其與氣候 / 大尺度 的連結 應持續進行颱風 reconnanssance 之飛機觀測,以及配合衛 星、雷達觀測技術之發展 學界應積極進行大氣人才培育,滿足氣象局、颱洪中心等 作業研發單位之人力需求
3
3 International Trend 研究重點放在災害性天氣,結合模式與觀測技術 模式部份 基礎研究 : 著重物理機制之改進 預報研究與作業 : 注重資料同化技術 結合衛星與雷達資料 NASA: Suomi National Polar-orbiting Partnership (NPP) FORMOSAT-7 (Taiwan-USA, scheduled for 2017/2018) Japan Himawari-8 Satellite, more channels with higher spatial and temporal resolution Multi-parameter Doppler radars, cloud radar, UAV Model completeness, cloud microphysics, air-sea interaction, air-land interaction, data assimilation
4
4 Discussion Conclusions in 2016 Observations Cloud radar Observe cloud evolution before and after precipitation Fill data gap between lidar (pre-development) and Doppler radar (with rainfall), but need data accumulation Targeted by TTFRI for acquisition in 2017-2018 TEAM-R mobile Doppler radar Have accumulated several years of data for use in research Can adjust mission and scanning strategy according to plan Can apply and acquire data from NCU radar group website Can provide some processing of data during case period for easy use through collaboration TTFRI Joint observation experiment: 2 radars, TEAM-R, UAV
5
5 Discussion Conclusions in 2016 (cont.) Observations SCS-YMC Winter Olympic in South Korea in 2018 Pretrial run in early 2017 (two months) and Forecast Demonstration Project (FDP) in 2018 Among an integrated array of observational platforms Paid for (man power, transportation) by Korea Other equipment: 3-D scanning Doppler lidar
6
6 Discussion Conclusions in 2016 (cont.) Modeling: Shortage in computational resources Rapid growth in problem size of model simulations Resource from NCHC may not meet some special needs (cycling runs, real-time runs, long wait time, job saturation) An increasing problem for most PIs Possible short-term solution Allocate some resource in NCHC, or through TTFRI, to serve the PIs with special needs in computational resources Establish a service project that needs both large storage and computing capacities (to tackle certain issues) Need to speak out to let our problems known
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.