Download presentation
Presentation is loading. Please wait.
Published byRalph Bates Modified over 8 years ago
1
Flight Data Recorder (FDR) project status Master Student : Georgios Petropoulos Advisors : Joseph Timothy Foley Þorgeir Pálsson ITS Liason : Guðmundur Viktorsson
2
Avionics - Flight Data Recorder System Test (Project status) Data transfer standards ARINC 429 ARINC 717 Georgios Petropoulos FDR project status
3
Digital Flight Data Acquisition Unit (DFDAU) => Flight Data Recorder (FDR) Low memory capacity => Loops the data every after 4 sec Speed 64 WPS - 256 WPS Sync word ( pointer to the start of the data reading ) ARINC 717 Protocol Georgios Petropoulos FDR project status
4
Linux ubuntu OS Document Test document 1 Test document 2 render PC tablet ARINC 717 Data Bridge usb AUsb mini Georgios Petropoulos FDR project status General Project’s graphical idea FDR box Other Device SAX or DOM API
5
Why Android? Android SDK Tools package AVD emulator configuration Java XML Java Android platform- programming languages Georgios Petropoulos FDR project status
6
XML general scheme - PDF documentation Georgios Petropoulos FDR project status
8
Java code examples (Eclipse)
9
Georgios Petropoulos FDR project status XML code examples (Eclipse)
10
ADC Data Bus Test ideas presentation Georgios Petropoulos FDR project status
11
Main page Georgios Petropoulos FDR project status
12
Begin FDR tester Exit “Welcome to the Data Flight Recorder system test” Avionics Flight_Data_Recorder Tester Welcome screen Georgios Petropoulos FDR project status
13
ARINC 429 Back “Aircraft Type _ Boeing 757” ARINC 717 Exit ? ? Avionics Flight_Data_Recorder Tester Entering - displaying the first options of the programme Georgios Petropoulos FDR project status
14
Fill the data needed in the boxes to proceed : Back Operators name Start time Location Next Avionics Flight_Data_Recorder Tester [Text] Inserting data to begin Georgios Petropoulos FDR project status
15
Back “Tests Menu” Avionics Flight_Data_Recorder Tester Run 1. Test I 2. Test II 3. Test III 4. Test IV 5. Test V 6. Test VI Choosing test to begin with Georgios Petropoulos FDR project status
16
Return “ADC Data Bus Test” Avionics Flight_Data_Recorder Tester Run again SUBTASK 31-31-00-705-772 (1) Do the ADC data bus test that follows: (a) Make sure the air data computing system is operational (PAGEBLOCK 34-12-00/501). (b) Set the Captain's ADC Source Select switch to the NORM position. (c) Push and hold the left air data computer switch on the P61 test panel for more than 7 seconds. (d) Set the SUBFRAME and WORD for each signal as shown in the ADC DATA BUS table. (e) Set the captain's ADC source select switch to the ALTN position. (f) Push and hold the right air data computer switch on the P61 test panel for more than 7 seconds. (g) Set the SUBFRAME and WORD for each signal as shown in the ADC DATA BUS table. ADC DATA BUS SIGNAL TEST SIGNALTESTER SETUPDISPLAY SUBFRAMEWORD ALTITUDE0230704 AIRSPEED0221044 Initial State (from the papers) Georgios Petropoulos FDR project status
17
Return “ADC Data Bus Test” DONE “Do the ADC data bus test by following and completing each step in order” STEP 1 : Make sure the air data computing system is operational (PAGEBLOCK 34-12- 00/501) SUBTASK 31-31-00-705- 772 Idea I Georgios Petropoulos FDR project status
18
Return “ADC Data Bus Test” DONE STEP 2 : Set the Captain's ADC Source Select switch to the NORM position. SUBTASK 31-31-00-705- 772 Idea I Georgios Petropoulos FDR project status
19
Return “ADC Data Bus Test” DONE STEP 3 : Push and hold the left air data computer switch on the P61 test panel for more than 7 seconds. SUBTASK 31-31-00-705- 772 Idea I Georgios Petropoulos FDR project status
20
Return “ADC Data Bus Test” DONE STEP 4 : Set the SUBFRAME and WORD for each signal as shown below ALTITUDE Reference value : 0256 Measurement value: 0704 AIRSPEED Reference value : 0256 Measurement value: 0704 SUBTASK 31-31-00-705- 772 Idea I Georgios Petropoulos FDR project status
21
Return “ADC Data Bus Test” Proceed SUBTASK 31-31-00-705- 772 Idea I Georgios Petropoulos FDR project status
22
EXIT “ADC Data Bus Test” TEST COMPLETED Please return to the “Tests options menu” by clicking the “Home” button and proceed to the next test or exit the programme by clicking the “EXIT” button Home Idea I Georgios Petropoulos FDR project status
23
Return “ADC Data Bus Test” OK Idea II Begin and complete the ADC bus data test by following the instructions starting from below : Set the Captain's ADC Source Select switch to the NORM position. SUBTASK 31-31-00-705- 772 Georgios Petropoulos FDR project status
24
Return “ADC Data Bus Test” OK Idea II Set the Captain's ADC Source Select switch to the NORM position. SUBTASK 31-31-00-705- 772 Georgios Petropoulos FDR project status
25
Return “ADC Data Bus Test” OK Idea II Push and hold the left air data computer switch on the P61 test panel for more than 7 seconds. SUBTASK 31-31-00-705- 772 Georgios Petropoulos FDR project status
26
Return “ADC Data Bus Test” OK Idea II Set the SUBFRAME and WORD for each signal as shown in the table below: SUBTASK 31-31-00-705-772 ALTITUDEAIRSPEED Reference value05848654 Measurement value07041044 Georgios Petropoulos FDR project status
27
Return “ADC Data Bus Test” OK Idea II. SUBTASK 31-31-00-705- 772 Georgios Petropoulos FDR project status
28
EXIT “ADC Data Bus Test” Home Idea II SUBTASK 31-31-00-705- 772 TEST COMPLETED SUCCESSFULLY Please return to the “Tests options menu” by clicking the “Home” button and proceed to the next test or exit the programme by clicking the “EXIT” button Georgios Petropoulos FDR project status
29
Return “ADC Data Bus Test” OK Idea III Begin and complete the ADC bus data test by following the instructions starting from below : Set the Captain's ADC Source Select switch to the NORM position. SUBTASK 31-31-00-705-772 Table Sjgnal test Georgios Petropoulos FDR project status
30
Return “ADC Data Bus Test” OK Idea III Set the SUBFRAME and WORD for each signal as shown in the table below: SUBTASK 31-31-00-705-772 ALTITUDEAIRSPEED Reference value05848654 Measurement value07041044 Finish test Georgios Petropoulos FDR project status
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.