Download presentation
Presentation is loading. Please wait.
Published byJody Marshall Modified over 8 years ago
1
DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 1 PMOD/WRC Davos 29-30 november 2010 Présenté par : JP. Marcovici Sigle : LATMOS PLATFORM STATUS I
2
DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 2 SOMMAIRE - STATUS OF PGCU AND FLIGHT SOFTWARE - OPERATING MODE - CHANGE OF CONFIGURATION - FLOW SODISM SCIENCE TM - SOME PRELIMINARY REPORT FOR SODISM - UPDATE OF THE OPERATIONNEL FLIGHT SOFWARE
3
DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 3 STATUS OF PGCU AND FLIGHT SOFTWRE - Load a new operational flight software after launch with dump of the flash and verification by dowload of the code status : OK - Communications PGCU SODISM SOVAP PREMOS status : OK - No error detected - Patch operation (28/9/2010) status : OK
4
DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 4 OPERATING MODES SODISM : ETH mode Decontamination, Nominal Scientific mode : Nominal mode, Night Mode, Distortion, Stellar PREMOS : Science and Night mode SYNCHRONIZATION : SODISM SOVAP Each day SODISM PREMOS : Twice per orbit for 215nm and 607nm with HEAD B Channel 1 and 2 SOVAP : A02, A03, A04,A09, A14 R04, R05, R06, R10 MUX0, MUX5
5
DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 5 CHANGE OF CONFIGURATION SODISM : change thermal configuration DateTemp CCDDateTemp CCD 31/7/2010-18°C4/9/2010-10°C 3/8/2010-13°C21/9/2010-9.25°C PREMOS : change thermal configuration DateTemp CCDDateTemp CCD 26/7/2010TH1=24°C TH2=23°C 13/9/2010TH1=26°C TH2=25°C 6/9/2010TH1=26°C TH2=26°C SOVAP : mode used on board A02, A03, A04,A09, A14 R04, R05, R06, R10 MUX0, MUX5
6
DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 6 FLOW SODISM SCIENCE TM They are two compression on board Lossless compression (PLLC) With degradation (Langevin) The compression rate of PLLC depend of the noise on the pixels of CCD So the commissioning period allow to define the size of limb PLTM and macro-pixels The perspective is to allow about 51 pixels of large for the diameter measurements
7
DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 7 REPORT ABOUT SODISM SHUTTERS (Electronic point of view)
8
DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 8 REPORT ABOUT SODISM SHUTTERS (Electronic point of view)
9
DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 9 SODISM Filter wheels from 01/08 to 30/09 Pm : 2 steps correspond to 0.2 mm to 0.5 mm of movement on the filter Go and back to RAZ position Erreur de pas + 1- 1 + 2- 2+ 3- 3 Roue1596015361510273901 Roue273687537520000 The requirement To have to steps or less of difference is respected Extract from a slide of M. Meissonnier (revue of end of Commissioning period)
10
DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 10 When they are new requirements on the payload, the only possibility is to try to treat them, with the operational software 2 problems now 1) SOVAP: it become necessary to prevent all telecommand that close the right shutter 2) SOVAP : This requirement can becomes obsolete if need 3) SODISM : Necessity to have full images compressed by Langevin with filters helio Point 1 and 3 will be treated thanks to a new version of the software (planning max February 2011) Point 2 will be treated by a patch of the memory (very easy processes) UPDATE OF THE OPERATIONNEL FLIGHT SOFWARE
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.