Download presentation
Presentation is loading. Please wait.
Published byMarshall Young Modified over 8 years ago
1
Developed from a summary prepared for the New York State Association of MPOs 1
2
Congress passes multi-year authorizations for the programs of the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) ISTEA (1991) TEA-21 (1998) SAFETEA-LU (2005) MAP-21 (2012) FAST Act (2015) Authorization establishes policy and sets maximum spending levels for each program 2
3
Passed on December 4, 2015 Five year authorization extends through Federal fiscal year 2020 (Sept 30, 2020) Total authorized spending $304.7 billion Modest increases in most programs Uses various funding mechanisms to avoid dealing directly with the annual shortfall in the Highway Trust Fund 3
4
Funding may not exceed authorized levels, but may be less Limits may also be established on how much of the funding may be obligated Congress may pass a rescission after the fact, and take some of the appropriated funding back 4
5
MPO designation unchanged: base population 50,000; TMA designation 200,000 ISTEA began the policy of enumerating factors to be considered in the long range transportation plan; there have been small changes with each authorization. FAST adds two new planning factors: Improve the resiliency and reliability of the transportation system and reduce or mitigate stormwater impacts of surface transportation Enhance travel and tourism 5
6
MAP-21, passed in 2012, made a number of policy changes and program consolidations Rules of MAP-21 that guide program delivery are still in effect under FAST Act, but many have not yet been finalized Capital investments under the plan should include strategies to reduce vulnerability due to natural disasters 6
7
Focus on freight and its support of the national economy National Multimodal Freight Policy/ National Multimodal Freight Network Includes National Freight Network (highways); Class 1 railroads; major seaports; major air cargo hubs; inland waterways including St. Lawrence Seaway, Great Lakes Critical Urban Freight Corridors: in metro areas >500,000 population, MPO designates; in remaining metro areas, state designates in consultation with the MPO 7
8
Reinstates the competitive bus and bus facilities grant program at USDOT - $268M in 2016 growing to $344M in 2020 These remain in place under FAST Performance based planning and programming FTA programs consolidated Surface Transportation Block Grant Program: renames STP, but with no eligibility changes Transportation Alternatives Program (TAP) is no longer a named program; eligible purposes remain under a funding set-aside from STBGP 8
9
FHWA Total $226.3 BAnnual Average (millions) % change from 2015 National Highway Performance Program$23,280+6.3 Surface Transportation Block Grant11,654+15.6 Transportation Alternatives Set-aside760+3.3 CMAQ2,405+6.1 HSIP2,317+5.7 Metropolitan Planning – PL343+9.5 National Highway Freight Program (?)1,249(new) Nationally Significant Freight & Highway Program (?)900(new) 9
10
FTA Total $61.1 billion ProgramFY 2016 funding (millions)Notes 5307 (Urban formula)$4,530 100 bus rule modified to include non-ADA paratransit 5339 (Bus & Bus Facilities)428 (formula) 268 (discretionary) Cost Effective Capital Investment Pilot Program 5303 (Metropolitan Planning) 131 Continues joint planning language with FHWA 5309 (Fixed Guideway)2,300 New Starts max 60% FTA $; Small Starts threshold $300M 5310 (Enhanced Mobility for Seniors & Disabled) 263 5311 (Rural formula)620 10
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.