Download presentation
Presentation is loading. Please wait.
Published byEmmeline Walton Modified over 8 years ago
1
Slide 1 EXAKT Basic Tutorial Haul Truck Transmission monitored by oil analysis SKF Phase 1, Session 1, Part 2 Exercise 1
2
Slide 2 EXAKT for Modeling opening view
3
Slide 3 Inspections table
4
Slide 4 Events table
5
Slide 5 CovariatesOnEvent table
6
Slide 6 EventsDescription table
7
Slide 7 Models table
8
Slide 8 General project data
9
Slide 9 Combining Events and Inspections
10
Slide 10 C_Inspections table
11
Slide 11 Proportional hazard model
12
Slide 12 Model with all significant variables
13
Slide 13 A submodel with a single variable
14
Slide 14 Comparative report
15
Slide 15 Reactivate the retained model “il”
16
Slide 16 Acceptance of the PHM
17
Slide 17 Transition bands
18
Slide 18 Transition model
19
Slide 19 Optimal decision policy
20
Slide 20 Decision model testing
21
Slide 21 Attaching the DMDR database
22
Slide 22 Exporting the model to the DMDR database
23
Slide 23 The EXAKTd agent
24
Slide 24 Create a working database for the EXAKTd agent
25
Slide 25 Link to the DMDR database where the model has been stored
26
Slide 26 Expose the units covered by the model “Trans Oil Ana”
27
Slide 27 Prior to running the model
28
Slide 28 Run the model on all units Replacement Decision Failure Risk Conditional Distribution Function Conditional Density Function
29
Slide 29 Full decision reports
30
Slide 30 Setting up departmental asset monitoring lists
31
Slide 31 Manage trucks by department
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.