Download presentation
Presentation is loading. Please wait.
Published byLouise Hensley Modified over 8 years ago
1
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Ground Powerup 1 1.Scheduled by OCR. 16:00 GLACIER#-DNLK-CMD GLACIER#-HW-DRY GLACIER#-HW-PWR NET 2 days 1:00 PRO-GLCR# ACT-CMD 24 hrs GLACIER#-HW-COOLDN Payload Cold Stowage 4:00 GLACIER#-DNLK-CMD 24 hrs GLACIER#-DSC PK-SWP :15 Commanding Unattended Crew Additional Activities # = 2, 3, 4, 5, or removed for Glacier (Unit 1)
2
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Crew Powerup 1 1.Scheduled by OCR. 24 hrs 16:00 GLACIER#-DNLK-CMD GLACIER#-HW-DRY GLACIER#-HW-PWR Commanding Unattended Crew NET 2 days 1:00 PRO-GLCR# ACT CR-CMD :10 24 hrs GLACIER#-HW-COOLDN Payload Cold Stowage 4:00 GLACIER#-DNLK-CMD GLACIER#-HW-PWRUP Additional Activities # = 2, 3, 4, 5, or removed for Glacier (Unit 1) GLACIER#-DSC PK-SWP :15
3
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Ground Powerdown 1 1.Scheduled by OCR. GLACIER#-HW-PWR Commanding Unattended Crew 2 days 1:00 PRO-GLCR# DACT-CMD 4:00 GLACIER#-DNLK-CMD (GMT 1500) :15 GLACIER#-DSC PK-SWP 1:00 GLACIER#-DNLK-CMD # = 2, 3, 4, 5, or removed for Glacier (Unit 1)
4
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Crew Powerdown 1 1.Scheduled by OCR. GLACIER#-HW-PWR Commanding Unattended Crew 2 days PRO-GLCR# DCT CR-CMD 4:00 GLACIER#-DNLK-CMD (GMT 1500) :10 GLACIER#-DSC PK-SWP 1:00 :15 GLACIER#-HW-SHUTDN # = 2, 3, 4, 5, or removed for Glacier (Unit 1)
5
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Downlink Commanding GLACIER#-HW-PWR Commanding Unattended 4:00 GLACIER#-DNLK-CMD (Thurs GMT 1500 weekly and as required to support payload user (see Payload PPO)) # = 2, 3, 4, 5, or removed for Glacier (Unit 1)
6
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 EXPRESS Rack Deactivation/Activation During Ops GLACIER#-HW-PWR 4:00 GLACIER#-DNLK-CMD PRO-GLCR# DACT-CMD GLACIER#-HW-PWR 1:00 4:00 GLACIER#-DNLK-CMD PRO-GLCR# ACT-CMD Commanding Unattended Additional Activities 1:00 # = 2, 3, 4, 5, or removed for Glacier (Unit 1) EXPRESS Rack Deactivation/ Activation (see EXPRESS Rack PPO)
7
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 POIC Maintenance Outage GLACIER#-HW-PWR :10 GLACIER#-STATUS-CK (every 2 hours while powered) Unattended Crew HPOC Active Yes No No activities required Additional Activities # = 2, 3, 4, 5, or removed for Glacier (Unit 1)
8
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 MTL to AAA 1 1.Scheduled by OCR. GLACIER#-AAA-PWR GLACIER#-HW-PWR Commanding Unattended :30 4:00 GLACIER#-DNLK-CMD PRO-GLCR# MTLOFF-CMD # = 2, 3, 4, 5, or removed for Glacier (Unit 1)
9
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 GLACIER#-AAA-PWR Filter Cleaning 1 :30 Unattended Crew GLACIER#-FLTR-CLEAN (every 90 total days on AAA) GLACIER#-AAA-PWR 1.PRO command windows should not be scheduled for filter cleaning. Crew performs power down/up to minimize power off time. # = 2, 3, 4, 5, or removed for Glacier (Unit 1)
10
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 AAA to MTL 1 1.Scheduled by OCR. GLACIER#-HW-PWR GLACIER#-AAA-PWR Commanding Unattended 4:00 GLACIER#-DNLK-CMD :30 PRO-GLCR# MTLON-CMD # = 2, 3, 4, 5, or removed for Glacier (Unit 1)
11
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 GLACIER#-HW-PWR Sample Insert/Retrieve 1 GLACIER#-SMPL-INS OR GLACIER#-SMPL-RTRV Unattended Crew # = 2, 3, 4, 5, or removed for Glacier (Unit 1) 1.Scheduled by OCR. 2.Duration may be reduced to 5 minutes for activities that meet the 5/10/15 Minute Scheduling Exceptions. :10 2
12
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Desiccant Pack Insert/Remove 1 1.Scheduled by OCR. :15 Unattended Crew GLACIER#-DSC PK-INS OR GLACIER#-DSC PK-RMV GLACIER#-HW-PWR # = 2, 3, 4, 5, or removed for Glacier (Unit 1)
13
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Desiccant Canister Insert 1 1.Scheduled by OCR. :15 GLACIER#-DSCCNT-INS Unattended Crew GLACIER#-HW-PWR FlexibleTEXT # = 2, 3, 4, 5, or removed for Glacier (Unit 1)
14
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Door Lock/Unlock 1 1.Scheduled by OCR. :15 Unattended Crew GLACIER#-DOOR-LOCK OR GLACIER#-DOOR-UNLCK GLACIER#-HW-PWR # = 2, 3, 4, 5, or removed for Glacier (Unit 1)
15
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Software Load 1 1.Scheduled by OCR. :25 GLACIER#-SW-LOAD Unattended Crew GLACIER#-HW-PWR FlexibleTEXT # = 2, 3, 4, 5, or removed for Glacier (Unit 1)
16
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 File Load 1 1.Scheduled by OCR. :15 GLACIER#-FILE-LOAD 1:00 PRO-PLMDM FILE-CMD 1:00 PRO-FILE XFR-CMD Commanding Unattended Crew GLACIER#-HW-PWR # = 2, 3, 4, 5, or removed for Glacier (Unit 1)
17
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Battery Swap 1 1.Scheduled by OCR. :15 GLACIER#-BATT-SWAP Crew FlexibleTEXT # = 2, 3, 4, 5, or removed for Glacier (Unit 1)
18
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Crew Video/Photo 1 1.Scheduled by OCR. :15 Unattended Crew GLACIER#-CRW-VIDEO/P GLACIER#-HW-PWR GLACIER#-HISD-VIDEO # = 2, 3, 4, 5, or removed for Glacier (Unit 1)
19
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Video/Photo 1 1.Scheduled by OCR. Unattended Crew GLACIER#-HW-PWR :15 GLACIER#-HW-VIDEO/P GLACIER#-HISD-VIDEO # = 2, 3, 4, 5, or removed for Glacier (Unit 1)
20
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Dragon Status Check Crew :10 GLACIER-DRGN-STAT CK (every 2 hours while powered on Dragon only if H&S cannot be provided)
21
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Dragon Unpack/Remove 1 Crew Additional Activities :35 GLACIER-DRGN-RMV 1.Scheduled by OCR. 1:00 GLACIER-DRGN-UPK/RMV :10 DCB-ICEBRICK-STOW 24 hrs :30 GLACIER-DRGN-UNPACK Scheduled Separately Yes No :10 DCB-ICEBRICK-STOW 24 hrs
22
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 1:00 GLACIER#-HW-PWR Dragon Transfer 1 1:00 4:00 GLACIER#-DNLK-CMD GLACIER#-DRGN-XFR GLACIER-DRGN-VIDEO/P :30 PRO-GLCR# DCT CR-CMD :30 PRO-GLCR# MTLOFF-CMD 1.Scheduled by OCR. UNBERTH1:00 GLACIER#-HW-INSTALL Commanding Unattended Crew Additional Activities # = 2, 3, 4, 5, or removed for Glacier (Unit 1)
23
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 1:00 GLACIER#-HW-PWR Dragon Swap 1 Commanding Unattended Crew 1:00 4:00 GLACIER#-DNLK-CMDGLACIER#-DRGN-SWAP GLACIER-DRGN-VIDEO/P :30 PRO-GLCR# DCT CR-CMD :30 PRO-GLCR# MTLOFF-CMD 1:00 1.Scheduled by OCR. # = 2, 3, 4, 5, or removed for Glacier (Unit 1)
24
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Crew Roll-up Notes EO10-PPO-11- 037 Revision B31/32 & Subs 12/8/11 Nominal:.58 Reserve: 0 Inc 31/32 Working PTP 10/31/11 Nominal: ER2: 3.33 ER6: 2.17 Reserve: 0 Status checks during POIC outage (2xday/2 days). Glacier SpaceX swaps and supporting activities will be addressed in a separate CR. EO10-PPO-12- 011 Revision C33/34 & Subs 6/28/12 Nominal: 0 Reserve: 0 Inc 33/34 Working PTP 5/11/12 Nominal: ER2: 4.5 ER6: 0 Reserve: 0 Glacier SpaceX swaps and supporting activities will be addressed in a separate CR. EO10-PPO-12- 020 Revision D33/34 & Subs 8/30/12--Power removed from crew activities and unattended activities adjusted as needed. Video resources modeled in separate unattendeds for P/TV activities. No change to roll-up from last revision. EO10-PPO-13- 003 Revision E35/36 & Subs 2/14/13 Nominal: 0 Reserve: 0 Inc 35/36 Working PTP 1/3/13 Nominal: 4.5 (ER6); 6.67 (ER2) Reserve: 0 Increased duration for 10-min activities with procedures and stowage notes to 15 minutes. Added generic activities for Dragon transfers, swap, and status checks. Specific Dragon-related activities will be submitted by OCR before each flight. EO10-PPO-13- 020 Revision F37/38 & Subs 6/13/13 Nominal: 0 Reserve: 0 Inc 37/38 Working PTP 4/29/13 Nominal: 4.92 (ER6); 4.25 (ER2) 0 (ER7); 3.33 (ER3) Reserve: 0 (ER6, ER2, ER7) 1.33 (ER3) Specific Dragon-related activities will be submitted by OCR before each flight. Updated video/photo activities. Added Glacier Dragon Unpack/Remove activity. PPO Change Log *Crew Roll-up is not maintained real-time.
25
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Notes EO10-PPO-13- 049 Revision G 39/40 & Subs 12/12/13 Nominal: 0 Reserve: 0 Inc 39/40 Working PTP 10/21/13 Glacier 1: 0.17 Glacier 2: 0.17 Glacier 3: 3.67 Glacier 4: 3.67 Glacier 5: 2.33 Reserve: 0 for all Specific Dragon-related activities will be submitted by OCR before each flight. Updated DNLK-CMD scheduling to include words “as required to support payload user.” Added #5 to key for Glacier 5. Updated Dragon status check (not required if H&S can be provided). coldall000148 coldall000149 Revision H41/42 & Subs 9/24/14 Nominal: 0 Reserve: 0 Inc 41/42 Working PTP 9/18/14 Glacier 1: 5.50 Glacier 2: 0.17 Glacier 3: 4.75 Glacier 4: 3.67 Glacier 5: 2.25 Reserve: 0 for all Added desiccant swap prior to hardware powerup. Added battery swap. EO10-PPO-15- 013 Revision I41/42 & Subs 3/3/15 - -Added PPO document number. PPO Change Log *Crew Roll-up is not maintained real-time.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.