Presentation is loading. Please wait.

Presentation is loading. Please wait.

Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Platform-X Install & Activate.

Similar presentations


Presentation on theme: "Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Platform-X Install & Activate."— Presentation transcript:

1 Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Platform-X Install & Activate Schedule by OCR NANORACK-PL-RES 2:00:05 P/L-MPC-PB START P/L-MPC-PB STOP P/L-MPC-PLAYBACK 1:10 NANORACK-HW-INS&ACT :30 PRO-NANO ACT-CMD :30 NANORACK-PL-OBCT NANORACK-PL-VIDEO A

2 Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Platform-X Install & Activate Schedule by OCR NANORACK-MOD-RECONFG :30 :15 NANORACK-DATA-CLCT PRO-NANO DNLK-CMD :30 PRO-NANO DACT-CMD NANORACK-PL-RES :40:05 :30 P/L-MPC-PB START P/L-MPC-PB STOP P/L-MPC-PLAYBACK :15 >10 minutes NANORACK-POWER-OFF A

3 Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Generic Module-X Ops Schedule by OCR PRO-NANO ACT-CMD :30 :10:30:05 :30 NANORACK-PL-RES :50 P/L-MPC-PB START P/L-MPC-PB STOP P/L-MPC-PLAYBACK B NANORACK-POWER-ON NANORACK-MOD-RECONFG NANORACK-PL-OCBT Schedule if crew has not previously used NanoRacks

4 Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Generic Module-X Data Transfers Schedule by OCR MondayWednesdayFriday NANORACK-PL-RES :30 :15 NANORACK-DATA-CLCT PRO-NANO DNLK-CMD :30 :15 NANORACK-DATA-CLCT PRO-NANO DNLK-CMD :30 :15 NANORACK-DATA-CLCT PRO-NANO DNLK-CMD CB

5 Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Generic Module-X Schedule by OCR :30:10 :30 >10 minutes NANORACK-PL-RES C NANORACK-MOD-RECONFG NANORACK-POWER-OFF PRO-NANO DACT-CMD

6 Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks Module-5 (Microscope-1) Generic Payload use of Microscope-1 Schedule by OCR :30:15 :30 Use of Microscope-1 for other Payload Activities (see other payload’s PPO) NANORACK-PL-RES:30 PRO-NANO ACT-CMD :30 PRO-NANO DACT-CMD NANORACK-PL-OCBT Schedule if crew has not previously used NanoRacks NANORACK-MICRO1-SU NANORACK-MICRO1-STW PRO-NANO DNLK-CMD

7 Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks Module-12 (Microscope-2) Generic Payload use of Microscope-2 Schedule by OCR :30:15:20 :30 Use of Microscope-2 for other Payload Activities (see other payload’s PPO) NANORACK-PL-RES:30 PRO-NANO ACT-CMD :30 PRO-NANO DACT-CMD NANORACK-PL-OCBT Schedule if crew has not previously used NanoRacks PRO-NANO DNLK-CMD NANORACK-MICRO2-STW NANORACK-MICRO2-SU

8 Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Filter Change Schedule by OCR :20 NANORACK-FILTER-CLN

9 Revision C 12/19/12 Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Crew Roll-up Notes EO10-PPO- 12-005 Baseline31/32 &subs 4/12/12Nom: 12.25 Reserve:2.0 Inc 31/32 Working PTP dated 02/29/12: Nom:14.92 Reserve:4.0 PTP crew times include Platforms 1,2 & 3 and microscope-2. Assumes crew is familiar with hardware (no OCBT) and no Microscope-2 activities other than checkout. EO10-PPO- 12-011 Revision A33/34 &subs 6/28/12Nom: 7.5 Reserve:0.0 Inc 33/34 Working PTP dated 5/11/12: Nom:26 Reserve:0.15 PTP crew times include Platforms 1,2 & 3 and microscopes-1 & 2. Assumes crew is familiar with hardware (no OCBT) and no Microscope-2 activities other than checkout. EO10-PPO- 12-022 Revision B33/34 &subs 8/23/12Nom: 13.1 Reserve:0.0 Inc 33/34 Working PTP dated 7/11/12: Nom:26.0 Reserve:0.0 PTP crew times include Platforms 1,2 & 3 and microscopes-1 & 2. Assumes NANORACK- MOD9-DEACT is performed 6 times and NANORACK-MOD9-ACT is performed 3 times(these activate/deactivate numbers are based on Inc31/32 planning). EO10-PPO- 12-036 Revision C35/36 &subs 12/19/12Nom: 3.0 Reserve:0 Inc 35/36 Working PTP dated 10/24/12: Nom:4.33 Reserve:33.0 PTP crew times include Platforms 1,2 & 3 and microscopes-1 & 2. Assumes that two replacement frames will be installed during I35- 36. These frames are not currently on board (launch ATV4). Activities are scheduled by OCR. Nanoracks PPO Change Log PARC/E. Litkenhous *Crew Roll-up is not maintained real-time.


Download ppt "Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Platform-X Install & Activate."

Similar presentations


Ads by Google