AES HUNTINGTON BEACH ENERGY PROJECT
Huntington Beach Southeast Area Meeting Presented By: AES Huntington Beach Energy, LLC March 2, 2016
2
AES in California 3 natural gas power plants Long Beach (Alamitos)
Huntington Beach Redondo Beach Approximately 15% of Southern California Edison’s peak demand AES Energy is an innovative leader in new energy solutions – helping California meet green energy and clean air goals Over 280 MW of renewable energy sources Wind Battery Storage * Solar power developer *Coming to Long Beach by 2020
3
Current Project Status
HUNTINGTON BEACH ENERGY PROJECT Cleaner| Efficient| Reliable Current Project Status Permitting and Project Approvals Application to modernize AES Huntington Beach submitted to California Energy Commission (CEC) June 2012 City of Huntington Beach, state agencies local community and CEC staff reviewed and commented on the Huntington Beach Energy Project CEC approved Huntington Beach Energy Project license October, 2014 939 MW combined-cycle gas turbine plant Entire project within the fence line of existing plant Removal of old boilers and stacks Offsite parking on Newland Street, PCH and Beach Blvd. and Magnolia storage tank area CEC approval included 175 Conditions of Certification
4
Current Project Status
HUNTINGTON BEACH ENERGY PROJECT Cleaner| Efficient| Reliable Current Project Status Planning, Procurement and Contracting California Public Utilities Commission (CPUC) leads California’s long term electricity planning process CPUC’s 2012 LTPP authorized Southern California Edison (SCE) to procure new generation to meet future need AES offered SCE different configurations of generating technology Southern California Edison (SCE) awarded AES 20 year Power Purchase Agreements in October, 2014 (AES Huntington Beach and AES Alamitos) The power plant configuration selected by SCE is different from what the CEC approved Smaller: 844 MW vs 939 MW Different model of turbines More efficient, less emissions, less water Looks different
5
Huntington Beach Energy Project Requires an Amendment to CEC License
AES has submitted a Petition to Amend to the CEC for a revised project to match the needs of SCE Demonstrate the revised design has same or better environmental attributes Need to completely redesign the architectural treatment Use of Magnolia storage tank area and road improvements
8
Approved Construction Parking Areas and Truck Routes
215 Parking Spots 300 Parking Spots 170 Parking Spots
9
Construction Laydown Area and Minimum Parking
HUNTINGTON BEACH ENERGY PROJECT Cleaner| Efficient| Reliable Construction Laydown Area and Minimum Parking
10
HUNTINGTON BEACH ENERGY PROJECT
Cleaner| Efficient| Reliable
11
HUNTINGTON BEACH ENERGY PROJECT
Cleaner| Efficient| Reliable
12
HUNTINGTON BEACH ENERGY PROJECT
Cleaner| Efficient| Reliable
13
HUNTINGTON BEACH ENERGY PROJECT
Cleaner| Efficient| Reliable
14
HUNTINGTON BEACH ENERGY PROJECT
Cleaner| Efficient| Reliable
15
HUNTINGTON BEACH ENERGY PROJECT
Cleaner| Efficient| Reliable
16
HUNTINGTON BEACH ENERGY PROJECT
Cleaner| Efficient| Reliable
17
HUNTINGTON BEACH ENERGY PROJECT
Cleaner| Efficient| Reliable
18
HUNTINGTON BEACH ENERGY PROJECT
Cleaner| Efficient| Reliable
19
Petition to Amend Process
HUNTINGTON BEACH ENERGY PROJECT Cleaner| Efficient| Reliable Petition to Amend Process AES filed detailed project description with accompanying environmental analysis Drawings, specifications, schedules, etc. Environmental analysis of changes Minor revisions to Conditions of Certification (no new or additional mitigation necessary) CEC reviews and prepares a staff analysis of PTA Discovery period Public meeting(s) Staff analysis Recommendation by Siting Committee Full Commission approval AES has prepared an architectural treatment for revised project Consultation and review with City of Huntington Beach staff and Design Review Board City Council to approve revisions
20
THANK YOU www.RenewAESHuntington.com talk@RenewAESHuntington.com