Chris Fears October 2008 UK Link Data centre Move Wellingborough to Kettering
2
Introduction UK Link Technology refresh (UKLTR) commissioned two new Data centres with TCS in Feb 2008 Peterborough and Wellingborough We have planned to exit from Wellingborough by 30 th September 2008 In future we will operate from Kettering and Peterborough
3
Current Position 15 th September Kit moved to Kettering and installed Working successfully in passive mode 30 th September – Wellingborough Closed Handed back keys!! 21 st /22 nd November – Full Dual Site Resilience No shipper and network impacts as done in housekeeping windows All to send in files as usual In event of failure, revert to using Peterborough as the main site.