Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: IEEE 802.15-07/??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 0 Ultra Wideband in Europe The EC Decision January 2007.

Similar presentations


Presentation on theme: "Doc.: IEEE 802.15-07/??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 0 Ultra Wideband in Europe The EC Decision January 2007."— Presentation transcript:

1 doc.: IEEE 802.15-07/??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 0 Ultra Wideband in Europe The EC Decision January 2007

2 doc.: IEEE 802.15-07/??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 1 The regulatory route to UWB implementation EC Decision on UWB Technical details of Low Duty Cycle Outstanding issues

3 doc.: IEEE 802.15-07/??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 2 EC Decision on UWB (1) The content of the EU Decision has been approved by the EC Radio Spectrum Committee ! EC Decisions are mandatory for EU Member States to implement ! The EC Decision will override any ECC Decisions implemented by EU member states ! The EC Decision is almost identical to Japanese UWB regulations !

4 doc.: IEEE 802.15-07/??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 3 EC Decision on UWB (2) USAGE RESTRICTIONS IN DECISION The Decision is limited to ultra wide-band equipment which : –is used indoors, or –if it is used outdoors, it is not attached to a fixed installation, a fixed infrastructure, a fixed outdoor antenna, or fixed to an automotive or railway vehicle;

5 doc.: IEEE 802.15-07/??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 4 EC Decision on UWB limits (3) Frequency range (GHz)Maximum mean e.i.r.p. density (dBm/MHz) Maximum peak e.i.r.p. density (dBm/50MHz) Below 1.6–90.0-50.0 1.6 to 3.4–85.0-45.0 3.4 to 3.8-85.0-45.0 3.8 to 4.2-70.0-30.0 4.2 to 4.8– 41.3 (until December 31 st, 2010) – 70.0 (beyond December 31 st, 2010) 0.0 (until December 31 st, 2010) – 30.0 (beyond December 31 st, 2010) 4.8 to 6.0–70.0-30.0 6.0 to 8.5– 41.30.0 8.5 to 10.6–65.0-25.0 Above 10.6–85.0-45.0

6 doc.: IEEE 802.15-07/??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 5 Low Duty Cycle mitigation allowed from 3.4 to 4.8GHz @ -41.3dBm/MHz DAA Area -85dBm/MHz @ 3.1 to 3.8GHz after detection -85 Phased approach without DAA until 31 st Dec 2010 from 4.2 – 4.8GHz @ -41.3dBm/MHz DAA from 3.4 to 4.8GHz @ - 41.3dBm/MHz DAA means Detect And Avoid

7 doc.: IEEE 802.15-07/??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 6 EC Decision on UWB (5) The “interim measure” or phased approach The 4.2-4.8GHz band is currently free of users likely to suffer harmful interference from UWB However, it is likely that these bands will be identified for IMT advanced systems at the next World Radio Conference EC Decision allows equipment placed on the European market before 31 st Dec 2010 to transmit up to -41dBm/MHz in the 4.2 – 4.8MHz band without any additional mitigation techniques After the 31 st Dec 2010 any new equipment placed on the European market will require additional mitigation techniques to operate at - 41dBm/MHz in the 4.2 - 4.8GHz band

8 doc.: IEEE 802.15-07/??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 7 EC Decision on UWB (5) Appropriate Mitigation Techniques –A maximum mean e.i.r.p. density of -41.3 dBm/MHz is allowed in the 3.4 - 4.8 GHz bands provided that a low duty cycle restriction is applied in which the sum of all transmitted signals is less than 5% of the time each second and less than 0.5% of the time each hour, and provided that each transmitted signal does not exceed 5 ms. –Equipment using ultra-wideband technology may also be allowed to use the radio spectrum with other e.ir.p. limits together with other appropriate mitigation techniques on condition that it achieves at least an equivalent level of protection as provided by the limits in this table.

9 doc.: IEEE 802.15-07/??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 8 EC Decision on UWB (6) Final Timing is dependent upon the publication of EC Decision in the Official Journal (OJ) of the EU EU Member states will have to implement the content of the EC Decision in their National regulations no later than 6 months from the publication of the decision in the OJ. In the UK there is a statutory duty to consult on how we intend to implement the EC decision in the UK before making regulations. Ofcom 28 day consultation due to be out around March 07. 802.18/15 may want to consider planning drafting reply to Ofcom in March RSC approve EC Decision 2006 2007 SeptOctAugDecJanFebMarAprMayJunJul Member states to implement decision at the latest 6 months from OJ publication Publication In OJ

10 doc.: IEEE 802.15-07/??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 9 The regulatory route to UWB implementation EC Decision on UWB Technical details of Low Duty Cycle Outstanding issues

11 doc.: IEEE 802.15-07/??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 10 Low Duty Cycle (LDC) operation (1) The aim of LDC is to restrict the time that a device can transmit to limit the harm that it can cause to other services Equipment with LDC can transmit up to -41dBm/MHz in the EC Decision provided: –it has a low duty cycle in which the sum of all transmitted signals is less than 5% of the time each second and less than 0.5% of the time each hour; and –the duration of each transmission does not exceed five milliseconds.

12 doc.: IEEE 802.15-07/??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 11 Low Duty Cycle (LDC) operation (2) The implementation parameters of LDC will be defined in a harmonised standard ETSI group ERM TG31A are responsible for producing the harmonised standard I recommend that 802.15 set up a group to correspond with ETSI TG31A to make sure 802.15.4a can meet parameters of the harmonised standard !

13 doc.: IEEE 802.15-07/??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 12 The regulatory route to UWB implementation EC Decision on UWB Technical details of Low Duty Cycle Outstanding issues

14 doc.: IEEE 802.15-07/??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 13 Outstanding issues (1) EC have issued a third mandate to CEPT (ECC) The Mandate asks CEPT to investigate: –finalising limits for Detect And Avoid (DAA) –limits for UWB equipment fitted to automotive or railway vehicles –possible increase to -41dBm/MHz in 8.5 – 9GHz band.

15 doc.: IEEE 802.15-07/??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 14 Outstanding issues (2) Detect and avoid (DAA) Offers protection to incumbent services by detecting their presence and not transmitting in their band Aiming to operate in the 3.1 – 4.8GHz band. Minimises interference while allowing UWB operation where possible But the DAA problem is challenging – how to avoid the hidden terminal problem? Any solution needs to be: –Highly accurate –Low cost –Spanning a range of different services –Agreed by all parties ETSI TG31A asked to work on a DAA specification in parallel to TG3 work

16 doc.: IEEE 802.15-07/??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 15 Questions Useful links UK Consultwww.ofcom.org.uk CEPT www.ero.dk ETSI TG31Ahttp://portal.etsi.org Any further questions should be sent to andrew.gowans@ofcom.org.uk


Download ppt "Doc.: IEEE 802.15-07/??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 0 Ultra Wideband in Europe The EC Decision January 2007."

Similar presentations


Ads by Google