Presentation is loading. Please wait.

Presentation is loading. Please wait.

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#79 Meeting Arrangement 23 - 27 May, 2016 Nanjing, China Xutao Zhou.

Similar presentations


Presentation on theme: "© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#79 Meeting Arrangement 23 - 27 May, 2016 Nanjing, China Xutao Zhou."— Presentation transcript:

1 © 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#79 Meeting Arrangement 23 - 27 May, 2016 Nanjing, China Xutao Zhou RAN4 Chairman

2 SLIDE 1 Meeting arrangement Common session (Chairman Xutao Zhou) Mon morning and Fri afternoon RF and frequency bands (Chairman Xutao Zhou) RRM and Demodulation (VC Xizeng Dai) NB IoT and NR (VC Hiromasa Umeda) Slide 1 MondayTuesdayWednesdayThursdayFriday RF SessionNanjing Ballroom 1 2F Nanjing Ballroom 1 2F Nanjing Ballroom 1 2F RRM/Demod SessionLinZhou + Cuizhou Room 2F Horizon Club Lounge 40F Horizon Club Lounge 40F Horizon Club Lounge 40F Yinzhou Room 2F NB-IoT&NR Breakout Room Nanjing Ballroom 2 2F Cuizhou Room +Linzhou Room 2F Cuizhou Room +Linzhou Room 2F Cuizhou Room +Linzhou Room 2F Cuizhou Room +Linzhou Room 2F

3 SLIDE 2 Document handling guideline Documents missing Tdoc submission deadline 10:59pm UTC on Fri 13th May 2016 will be marked as late and won’t be treated Please pay attention to presentation time => brief summaries Session Chair will distribute meeting minutes daily Revisions / new tdoc numbers allocated only by the judgment of the session chair During meeting the deadline for tdoc request is Thu,26th May, end of the meeting session During meeting the deadline for tdoc submission is Fri, 27th May, 2:00 pm Note: Inbox will be closed at 2:00 pm Please pay attention when you use the reflector to circulate draft documents. If the attachment name matches the pattern ‘R4-16xxxx.zip’, it will be automatically uploaded to the 3gpp ftp server as an official document Only official Tdocs (with proper number) from the inbox/documents folder are formally discussed in the meeting Slide 2

4 SLIDE 3 Monday, 23 May, 2016 Slide 3 Venue Time Nanjing Ballroom 1 (170)Qingliang Room+Qixia Room+Yuhua Room (126) 9:00-10:001. Opening of the meeting 2. Approval of the agenda (1) 3. Letters / reports from other groups / meetings (13) 3.1 Endorsed Tdoc from NB-IoT AH (60) 5.14 Rel-13 capability R4-164131 (1) 7.21.1. Work plan for MUST WI R4-163762 (1) 9NR SI – TR skeleton R4-163756 (1) 11 Basket WID (R4-164227 & 2228) 10:30-12:307 36.101 clean up (R4-153191, 3974, 3975) 5.1.1 4RX maintenance UE RF (1) 5.9.1 Rel-13 MTC maintenance UE RF (4) 5.10.1 Rel-13 eD2D UE RF (1) 5.13.1 Rel-13 Spectrum maintenance (7) 5.14.1 Rel-13 other maintenance RF (15) 6.1 TRP and TRS (6) 6.3 IM for downlink control channels of LTE (28) 14:00-16:00 5.5.1 LAA maintenance UE RF and EMC (10) 5.5.2 LAA maintenance BS RF and EMC (4) 6.10.1 Rel-13 LAA BS RF (3) 6.10.2 Rel-13 LAA co-existence test (12) 6.10.6 Rel-13 LAA other spec (1) 5.5.3 Rel-13 LAA RRM core maintenance (19) 6.10.3 Rel-13 LAA RRM (17) 6.10.4 Rel-13 LAA UE demodulation (11) 16:30-18:30 7.20.1 Rel-14 eLAA general (3) 7.20.2 Rel-14 eLAA UE RF (17) 7.20.3 Rel-14 eLAA BS RF (5) 6.10.4 Rel-13 LAA UE demodulation (continue) 6.10.5 Rel-13 LAA UE CSI reporting (4) 18:30-21:00 (ad-hoc) AAS (Chair: Richard Kybett) LAA Perf Ad hoc (Chair: Steven Chen)

5 SLIDE 4 Tuesday, 24 May, 2016 Slide 4 Venue Time Nanjing Ballroom 1 (155)Horizon Club Lounge (147) 8:30-10:30 7.1 Rel-14 Intra-band CA (20) 7.2 Rel-14 2DL/1UL CA ( 25) 7.20.4 Rel-14 eLAA RRM (5) 5.2.2 DC enhancement RRM core maintenance (3) 6.7 DC enhancements (12) 5.9.3 eMTC RRM core maintenance (15) 11:00-13:00 7.3 Rel-14 3DL/1UL (47) Return to LAA evening ad hoc minutes 6.5.1 eMTC RRM Perf (33) 14:30-16:307.4 Rel-14 4DL/1UL (27) 6.5.2~6.5.4 eMTC demod Perf (39) 5.1 4Rx Tx EVM (4) 6.6 4Rx Perf (57) 17:00-19:007.5 Rel-14 5DL/1UL (17) 7.6 Rel-14 2DL/2UL (11) 7.7 Rel-14 xDL/2UL (5) 7.8 Rel-14 3DL/3UL (3) 6.6 4Rx Perf (continue) 5.10.2 eD2D RRM core maintenance (7) 6.8 eD2D Perf (7) From 18:00 6.5.1 eMTC RRM Perf (continue) 19:00-21:00 (ad-hoc) LAA RF (Chair: Johan Sköld) 4Rx Perf Ad hoc(Chair: Christopher Callender)

6 SLIDE 5 Wednesday, 25 May, 2016 Slide 5 Venue Time Nanjing Ballroom 1 (152)Horizon Club Lounge (101) 8:30-10:30 Return to AAS evening ad-hoc MoM 5.8.1 Rel-13 AAS maintenance BS RF (13) 6.2 Rel-13 AAS (7) 6.2.2 Rel-13 AAS conformance requirements (4) 6.2.2.1 TS part 1 – conductive (7) 6.2.2.2 OTA testing (24) 6.2.2.3 TS part 2 – radiated (14) 5.10.2 eD2D RRM core maintenance (7) 6.8 eD2D Perf (7) 6.4 MMSE-IRC for LTE BS (18) 7.9.5 RRM for new AWS-3/4 Band (4) 7.17.4 SRS carrier switching (3) 11:00-13:00 7.14 Rel-14 eAAS general (11) Return to 4Rx evening ad hoc minutes 6.12.2 Rel-13 Indoor positioning RRM (8) 7.19.4 Rel-14 Further indoor positioning enhancement (4) 6.14 EB/FD-MIMO for LTE (29) 14:30-16:30 7.20.3 Rel-14 eLAA BS RF (3) 7.9 AWS (23) 7.10 2.6GHz SDL ( 13) 7.11 Multi-band BS testing (7) 6.14 EB/FD-MIMO for LTE (continue) 17:00 - 19:00 7.17.1 SRS switching general (5) 7.17.2 SRS switching UE RF (3) 7.18.2 Uplink enhancement UE RF(9) 8.1 HPUE (10) 8.2 Band 3 and Band 39 (2) 8.3 Flexible Bandwidth (6) 8.3.1 Flexible Bandwidth UE RF (1) 8.3.2 Flexible Bandwidth BS RF (1) 6.9 Multicarrier load distribution LTE (15) 6.11 CA enhancement beyond 5 CC (15) 7.13.3 V2V RRM (10) 19:00-21:00 (ad-hoc) 19:00-20:00 MIMO OTA (Chair: Anatoliy Ioffe) 20:00-21:00 TRP&TRS (Chair: Petri Vasenkari) 19:00-20:00 EB/FD-MIMO ad hoc (Chair: Qiu Haijie) 20:05-21:05 DL control channels IM Ad hoc (Chair: Andrey Chervyakov)

7 SLIDE 6 Thursday, 26 May, 2016 Slide 6 Venue Time Nanjing Ballroom 1 (78)Horizon Club Lounge (129) 8:30-10:30 7.13 V2V (1) 7.13.1 V2V general (21) 7.13.2 V2V UE RF (6) 7.13.3 V2V RRM (continue) 7.16 Measurement gap enhancement (11) 11:05- 13:00 7.15.1 Rel-14 MIMO OTA general (9) 7.15.2 Rel-14 MIMO OTA performance (4) 7.15.3 Rel-14 MIMO OTA harmonization (9) Return to EB/FD-MIMO and CCH-IM ad hoc minutes 7.21 MUST (9) 14:30- 16:30 4.1.2 UTRAN BS RF (2) 4.2.1 E-UTRAN UE RF (12) 4.2.2 E-UTRAN BS RF (3) 4.2.6 E-UTRAN other spec (6) 4.3.1 MSR BS RF (5) 7.12 High speed Perf enhancement (42) 8.3.3 Flexible bandwidth RRM (5) 10 Reply LS on eMobility (2) 5.3 LTE-WLAN interworking RRM maintenance (5) 5.12 CRS-IM maintenance (2) 17:00-19:00 RF, 2nd Round 7.10.5 LTE_FDD_2600_CA_B3 (2) 5.11 eDRX RRM core maintenance (2) 5.14.2 Rel-13 RRM maintenance (25) 5.14.3 Rel-13 demodulation mainenance (8) 4.2.3 Up to Rel-12 RRM maintenance (27) 4.2.4 Up to Rel-12 demodulation maintenance (24) RRM, 2nd Round 19:00-21:00 (ad-hoc) 19:00-21:00 V2V (Chair: Suhwan Lim) eMTC Perf Ad hoc (Chair: Muhammad Kazmi)

8 SLIDE 7 Friday, 27 May, 2016 Slide 7 Venue Time Nanjing Ballroom 1Yinzhou Room 2F 8:30- 10:30 RF, 2nd Round Return to eMTC evening ad hoc minutes RRM, 2nd Round 10:30- 12:30 RF, 2nd Round Demod, 2nd Round, 3rd Round 13:30- 15:30 RF, 3rd Round RRM, 3rd Round RRM + Demod 4th Round 16:00- 17:00 10. Liaison and output to other groups (4) 11. Revision of the work plan (24) 12. Future meetings (0) 13. Any other business (0) 14. Close of the meeting

9 SLIDE 8 NB-IOT and NR parallel session(1/2) Slide 8 Venue Time Monday 9:00-10:00 10:30-12:30 NB-IoT UE RF only 6.13.2.1 General(5) 6.13.2.2 Trasmitter requirements (25) *other UE RF topics are handled if time allows. 14:00-16:00 NB-IoT UE RRM only -From 6.13.4.1 to 6.13.4.6(23) *If time allows, 6.13.4.7 is handled(13). 16:30-18:30 6.13.1 NB-IoT General (6) NB-IoT UE RF: 6.13.2.3 Reference sensitivity level(5) 6.13.2.4 OOBB(3) 6.13.2.5 Other Rx (3) NB-IoT BS RF: 6.13.3.1 General (8) 6.13.3.3 Other Tx requirements(5) 18:30-21:00 (ad-hoc) Evening AH for NB-IoT BS RF BS Rx(Chair: TBD from rapporteur)

10 SLIDE 9 NB-IOT and NR parallel session(2/2) Slide 9 Venue Time TuesdayWednesday ThursdayFriday 8:30-10:30 NR(24) 9.1: general(1) 9.2 spectrum(2) 9.3 co-existence(9) 9.4 RF feasibility(9) 9.5 common issue UE/BS RF(3) NB-IoT UE RRM Core only return to Reserved for any NB-IoT and NR topics Return to 11:00-13:00 NR(25) continued 9.6 UE RF(8) 9.7 BS RF(6) 9.8/9.8.1 WP 5D (7) 9.9 others(4) NB-IoT UE/BS RF only Return to Any NB-IoT and NR topics Return to 14:30-16:30 NB-IoT UE RRM Core: *Not handled RRM topics(13) on Monday NB-IoT Performance (14) NB-IoT UE/BS RF & any NR return to NB-IoT RRM/demodulation are not handled. 17:00-19:00 NB-IoT BS RF only Review of Mon AH outcome 6.13.3.4 REFSENS(6) 6.13.3.5 Other Rx (22) 19:00-21:00 (ad-hoc) Reserved for evening AH for NR or NB-IoT 19:00-21:00 NR (Chair: Hiromasa UMEDA)

11 SLIDE 10 Ad hoc proposal for Jun Slide 10


Download ppt "© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#79 Meeting Arrangement 23 - 27 May, 2016 Nanjing, China Xutao Zhou."

Similar presentations


Ads by Google