GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE
2
… getting there … 212/02/2014A. Fabich, EN-MEF-LE
3
GIF in EHN1 - Gas piping and CDC 312/02/2014A. Fabich, EN-MEF-LE
4
GIF Schedule 412/02/2014A. Fabich, EN-MEF-LE EDMS 1328252 V0.3 Functional specs: -Juli 2013 Functional specs: -Juli 2013 Design -Dec. 2013 Design -Dec. 2013 CE start Jan. 2014 CE start Jan. 2014 Infrastructure installation March-July 2014 Infrastructure installation March-July 2014 Irradiator delivery Aug. 2014 Irradiator delivery Aug. 2014 Commissioning Sept.-Oct. 2014 Next major installations: -Structures (EN/MEF) -False floor -Service - First floor -Dem. Water & compr. Air (EN/CV) -Cabling (EN/EL) -AC, controls, light -Access & safety systems (GS/ASE)
5
H2 beam shielding modifications 5 In view of the Primary Ion Run (from Jan. 2015) Achieve legal RP limits in corridors and barracks Also during accidental beam loss upstream of PPE152 Additional shielding (min. 80 cm concrete equivalent) PPE132 and 142: fully covered to protect personnel in corridor and workshop PPE152: lateral shielding up to 2 m above first floor Effort About 300 concrete blocks 12/02/2014A. Fabich, EN-MEF-LE
6
PPE132/142 shielding 613/5/2014A. Fabich
7
PPE152 shielding 7 Only lateral No roof cover 13/5/2014A. Fabich Central passage NA61 target beam