Gatwick Airspace Seminar Emma Simpson Principal Airspace Regulator Civil Aviation Authority 10 May 2016.

Similar presentations


Presentation on theme: "Gatwick Airspace Seminar Emma Simpson Principal Airspace Regulator Civil Aviation Authority 10 May 2016."— Presentation transcript:

1 Gatwick Airspace Seminar Emma Simpson Principal Airspace Regulator Civil Aviation Authority 10 May 2016

2 Current Legislative Framework  Transport Act 2000 Section 70

3 Current Airspace Change Process

4 Why does airspace need to change? The basic structure of the UK’s airspace was developed over forty years ago. Since then there have been huge developments, including a significant increase in demand for aviation. European requirement to simplify and harmonize airspace through the Single European Sky project

5 Airspace Designed For A Different Era  Yesterday  Today

6 All Flights below FL195 – 1 day Heathrow Gatwick Luton Stansted London City British airspace Belgian airspace Dutch airspace French airspace Slide 6 NATS PRIVATE

7 FAS Programme  Key Aim – modernise airspace – saving time and fuel and reducing emissions.  The CAA owns the FAS Strategic Framework; the industry is responsible for deployment.  The FAS strategic framework is aligned with international ATM modernisation programmes to ensure consistency and standardisation  The FAS promotes the use of technology to modernise the UK’s Air Traffic Management (ATM) infrastructure.  The FAS supports projects in areas such as:  Deployment of satellite based airport flight procedures  Improved Airport based flight information into the European ATM network  Advanced management of the UK airspace to better accommodate civil and Military flight operations  Improved sharing of Surveillance information and its uses

8 Reasons for changing current process  Modernisation requirements  Unprecedented level of change – move away from ground based navigation to satellite systems  Airspace is a finite resource with limitations and complexities  Strength of public feeling  Restore trust between communities, the aviation industry and the CAA  Be fair, transparent, consistent and proportionate  Balance conflicting requirements in accordance with Section 70 of the Transport Act 2000  Make the language clearer and more comprehensible  Future proof in light of changing international requirements  Making data available - impartial, evidence based and documented

9 Helios Report  Commissioned by the CAA in July 2015  Helios are an independent management and technology consultancy  Extensive stakeholder liaison  Key findings  Independence  Transparency  Gated process  Government Guidance  Next Steps

10 Consultation on Proposals for a Revised Airspace Change Process  5 Mar 2016 to 15 June 2016  Key changes proposed:  Publication of material  Additional guidance material  Gateways  Online portal  Increased community engagement  Options  Scaleable process

11 Review Timeline

12 2015 Airspace Changes and Reviews

13 LAMP Phase 1a  Original consultation (2013 and 2014) included proposals for revised procedures at Gatwick and London City airports with new RNAV1 SIDs and new point merge ‘arrival transitions’  Gatwick proposals (both the NATS network above 4000ft and GAL Local Area below 4000ft) were withdrawn from Phase 1a in Autumn 2014 following consultation feedback  LAMP Phase 1a ACP was approved for London City and introduced on 4 Feb 16 which additionally included: -some alignment modifications to the Gatwick TIMBA STARs (standard arrival routes) inbound to the TIMBA hold from the east & south above 7000ft -other modifications to Southampton, Bournemouth, Southend arrival routes, and flight planned routes for traffic inbound to Farnborough (from the southwest and southeast). -controlled airspace lower limits revised in the Thames Estuary and in the Isle of Wight region.

14 Questions  Helios Report Helios Report  http://publicapps.caa.co.uk/docs/33/AirspaceChangeProcessIndepende ntReviewFinal.pdf http://publicapps.caa.co.uk/docs/33/AirspaceChangeProcessIndepende ntReviewFinal.pdf  Revised Airspace Change Process Consultation Revised Airspace Change Process Consultation  https://consultations.caa.co.uk/policy-development/proposals-for- revised-airspace-change-process/consult_view https://consultations.caa.co.uk/policy-development/proposals-for- revised-airspace-change-process/consult_view  Government Guidance to the CAA on Environmental Objectives Government Guidance to the CAA on Environmental Objectives  https://www.gov.uk/government/uploads/system/uploads/attachment_dat a/file/269527/air-navigation-guidance.pdf https://www.gov.uk/government/uploads/system/uploads/attachment_dat a/file/269527/air-navigation-guidance.pdf  LAMP LAMP  http://www.nats.aero/news/newsbrief/janfeb-2016/lamp-phase-1a- airspace-change-now-live/ http://www.nats.aero/news/newsbrief/janfeb-2016/lamp-phase-1a- airspace-change-now-live/