LCLS-II LLRF Documentation Sandeep Babel
2
2 LLRF Documentation/Budget/Schedule Most Documentation and Budget exists – need to assimilate, review and put in format
3
3 LLRF Documentation – on LCLS-II Project Templates Immediate [ 2-3 Months] LLRF R&D SOW - 1 Document Only [ Information is scattered over multiple documents ] Modelling and Simulation Cavity Tests Cryomodule Tests Slow and Fast Piezo Tuners Vector Sum RF Station R&D Functional Requirements Document – Almost there LLRF ESD – Not Sure if this exists Field Control Chassis LO generation/Down Converter Piezo Tuner Chassis/Stepper Motor Master/ Phase Reference lIne Interface Control Document [ Global Controls – Timing/MPS/Fast Feedback/Safety Systems/Cryo] – 1 Document [ Curt has already started this] Interface Control Document [Facilities – Electric/Water] – 1 Document – can be combined with Global Controls ICD Overall Block Diagram - Does not exist Interface to other Control Sub systems LLRF internal Block Diagram Later as the project progresses [ 8-9 Months maybe or earlier ] Field Control Chassis Prototype Test plan Field Control Chassis Prototype – CMTS Integration Plan Complete CMTS System Prototype Checkout Test Plan ?? Even later [18-20 Months maybe or earlier] Production of Field Control Chassis and other Components – SOW Cable Plant/Rack Profiles etc Checkout/Commissioning ?? Ideas/plans exist, but some are not on paper. Need to Review/Release Docs ASAP !!
4
4 More LLRF Documentation !! Schematics/PCB Documentation Firmware Documentation Software [Linux Kernel Drivers] EPICS Database Documentation All LCLS-II LLRF Documents has be to reviewed and released by official process.
5
5 LLRF Budget and Schedule [ Next 1 Month] One Resource Loaded Schedule in MS project with milestones Granularity of tasks can be discussed One Top level Budget showing Major Activities Already exists – Need to verify the latest numbers and see if it agrees with P6
6
6 Thank you !! Priority to MS Project Resource loaded Schedule/Budget in the next month Priority to Documentation like FRS, SOW and ICD in the next 2-3 months