LCLS-II LLRF Documentation Sandeep Babel. 2 LLRF Documentation/Budget/Schedule Most Documentation and Budget exists – need to assimilate, review and put.

Similar presentations


Presentation on theme: "LCLS-II LLRF Documentation Sandeep Babel. 2 LLRF Documentation/Budget/Schedule Most Documentation and Budget exists – need to assimilate, review and put."— Presentation transcript:

1 LCLS-II LLRF Documentation Sandeep Babel

2 2 LLRF Documentation/Budget/Schedule Most Documentation and Budget exists – need to assimilate, review and put in format

3 3 LLRF Documentation – on LCLS-II Project Templates  Immediate [ 2-3 Months]  LLRF R&D SOW - 1 Document Only [ Information is scattered over multiple documents ]  Modelling and Simulation  Cavity Tests  Cryomodule Tests  Slow and Fast Piezo Tuners  Vector Sum  RF Station R&D  Functional Requirements Document – Almost there  LLRF ESD – Not Sure if this exists  Field Control Chassis  LO generation/Down Converter  Piezo Tuner Chassis/Stepper Motor  Master/ Phase Reference lIne  Interface Control Document [ Global Controls – Timing/MPS/Fast Feedback/Safety Systems/Cryo] – 1 Document [ Curt has already started this]  Interface Control Document [Facilities – Electric/Water] – 1 Document – can be combined with Global Controls ICD  Overall Block Diagram - Does not exist  Interface to other Control Sub systems  LLRF internal Block Diagram  Later as the project progresses [ 8-9 Months maybe or earlier ]  Field Control Chassis Prototype Test plan  Field Control Chassis Prototype – CMTS Integration Plan  Complete CMTS System Prototype Checkout Test Plan  ??  Even later [18-20 Months maybe or earlier]  Production of Field Control Chassis and other Components – SOW  Cable Plant/Rack Profiles etc  Checkout/Commissioning  ?? Ideas/plans exist, but some are not on paper. Need to Review/Release Docs ASAP !!

4 4 More LLRF Documentation !! Schematics/PCB Documentation Firmware Documentation Software [Linux Kernel Drivers] EPICS Database Documentation All LCLS-II LLRF Documents has be to reviewed and released by official process.

5 5 LLRF Budget and Schedule [ Next 1 Month]  One Resource Loaded Schedule in MS project with milestones Granularity of tasks can be discussed  One Top level Budget showing Major Activities Already exists – Need to verify the latest numbers and see if it agrees with P6

6 6 Thank you !!  Priority to MS Project Resource loaded Schedule/Budget in the next month  Priority to Documentation like FRS, SOW and ICD in the next 2-3 months