1
Al Powell Director, Learning Technologies Classroom Support & CSU Online
2
Report Agenda UTFAB FY16 – Project updates Forecast for remaining projects Summer UTFAB Proposal for FY17 Questions & Answers
3
Technology Refreshes - Goals Digital/HDMI inputs and outputs - Better image resolution and enable HDMI recording in lecture capture Projectors – Lower maintenance, laser where appropriate Audio amplifiers – Lower power consumption Consistency in electronic controls – Control technology equipment and software updates Document cameras – Increased reliability & image quality Lecture capture ready – Basic infrastructure for future
4
Budget Overview Allocated Funding for FY16 $186,400 Funding spent $150,633 Funds Remaining $35,767
5
Completed FY16 Projects Summer 2015 * Non-UTFAB funded Technology upgrades Eddy Hall Education 7 Clark C-Wing – 213, 217, 250, 251 Health & Educ. Science – new building *Laurel St. 222 - new building *Plant Research Center – new building *ARDEC: Ag Research Center *UCA Runyan room
6
Completed FY16 Projects Fall & Thanksgiving Break 2015-16 *Non-UTFAB funded Education13 - Projector Education 105B - HDMI switcher/projector/cables Gifford 146 – Projector Glover 201 - Switcher/projector/Blu-Ray/screen/cables Mil Sci 105 – Projector Pathology 109 - Projector *Aggie Village B111- complete lectern system & install
7
Completed FY16 Projects Winter break/Spring break projects *Non-UTFAB funded Wagar 232 – complete room update; parts received & stored Johnson Hall 222 – HDMI switcher upgrade Engineering E106 – HDMI switcher Military Science 115 – HDMI switcher/Crestron panel/audio Clark 102, 103, 104 – HDMI video switchers TILT 221 – HDMI switcher, upgrade projector (in process) *Clark C-wing room remodels/re-installation/programming *Micro 101- re-install/re-program equipment after remodel
8
Remaining FY 16 Projects Summer 2016 Clark A-Wing (requires moving tables for access to lecterns) Upgrade lectern audio/video switcher to HDMI Adds HDMI output recording to lecture capture New digital transmitter-receiver pairs (for projector signals) Clark 101, 201, 202, 203, 204, 205, 206, 207 Classroom remodels/updates Wagar 231 Guggenheim 107
9
Questions about FY 16 Projects?
10
FY 17 Proposed Updates/Upgrades
11
Proposed FY17 Upgrades & Fixes Technology refresh: at 5+ years Some rooms can benefit from laser projectors Laser projectors have dropped in price Lower power consumption Less heat generation Longer service life; hope to extend life to 7 years BUT - Need to confirm long-term performance Wireless microphones are a challenge (next slide)
12
The FCC Threw Us a Curve Wireless frequency used in GA rooms is being auctioned in April. (Coming to a cell phone near you!) Frequency illegal to use in near future (date TBA) Shure just stopped building mic transmitters we buy annually for check-out use Buying more transmitters is pointless expense Frequency change is needed; cost reduction can result Goal: replace check-out with in-room docking mics Eliminate check-out mics, save thousands annually
13
FY17 Proposed Updates/Upgrades BEHAVIORAL SCIENCES1036,500 lumen Laser DLP & HDMI switcher / TX-RX$9,000 1056,500 lumen Laser DLP / Audio amp$8,200 107 6,500 lumen Laser DLP / HDMI switcher / Crestron / TX-RX$9,000 131Main projector:13,000 lumen – WUXGA$35,000 EDDY1073,500 lumen / HDMI switcher / Crestron / TX-RX$4,850 1083,500 lumen & HDMI switcher – Crestron / TX-RX$4,850 2126,500 lumen Laser DLP & HDMI switcher$9,000 ENGINEERING1008,500 lumen WUXGA$13,000 B101Complete remodel$20,000 JOHNSON HALL22210.6K lumen WUXGA$26,000 PLANT SCIENCEC1018,500 lumen WUXGA$13,000 WIRELESS MICROPHONES20 rooms Change frequency, install rechargeable mics Phase 1 of 2 year project $34,500 CSS LABOR520 hrs.Installation / programming / system integration$39,000 TOTAL FY17 PROPOSAL$225,400
14
Questions about FY 17 Proposal?