The Wisconsin Department of Transportation 2016 WisDOT SE Region Utility Conference Local Program Projects DAAR Engineering, Inc. SE Region Local Program.

Similar presentations


Presentation on theme: "The Wisconsin Department of Transportation 2016 WisDOT SE Region Utility Conference Local Program Projects DAAR Engineering, Inc. SE Region Local Program."— Presentation transcript:

1 The Wisconsin Department of Transportation 2016 WisDOT SE Region Utility Conference Local Program Projects DAAR Engineering, Inc. SE Region Local Program Management Consultant DAAR Engineering, Inc. is the Management Consultant (MC) representing the Wisconsin Department of Transportation

2 CONTACTS MANAGEMENT CONSULTANT (MC) CONTACTS: STAN LUKASZ, P.E.TODD BECKER, P.E. WisDOT SE Region MC – Program ManagerWisDOT SE Region MC – Design ManagerDAAR Engineering, Inc.325 E. Chicago Street, Ste. 500Milwaukee WI 53202Office (414) 225-9817 Direct (414) 935-4360Direct (414) 935-4359 stan.lukasz@daarcorp.comtodd.becker@daarcorp.com JOE KLARKOWSKI, P.L.S.RON ANDERSON WisDOT SE Region MC – Construction ManagerWisDOT SE Region MC – Utility & RR CoordinatorDAAR Engineering, Inc. 325 E. Chicago Street, Ste. 500 Milwaukee WI 53202 Office (414) 225-9817 Direct (414) 935-4410 Direct (414) 935-4368 joe.klarkowski@daarcorp.com ron.anderson@daarcorp.com

3 LP Utility Process Overview LOCAL PROGRAM (FEDERAL-AID) PROJECTS DO NOT FALL UNDER ADMINISTRATIVE RULE TRANS 220  Use of Trans 220 forms is NOT allowed. MC will furnish similar forms that have been created for the Local Program.  Despite not falling under Trans 220, utility coordination process for all Local Program Projects remains the same, including timeframes necessary for coordination and approval of Utility Work Plans. Following utility coordination LEAD TIMES during design is KEY (60/90/120 calendar days afforded to Utilities for return of Work Plans). Scope changes may require additional time. UTILITY WORK PLANS Municipality (and Designer) reviews UTILITY WORK PLANS to Account for:  WHAT the work is  WHEN the work will be done  WHO will be doing the work (utility company forces or contractors)  WHERE they will be doing the work needed to clear construction ***Once ALL questions are answered, a clear picture should emerge of time lines and activities.

4 LP Utility Process Overview UTILITY STATUS REPORT (USR)  USR (DT1080) completed by the DESIGNER & Signed by LPPM  ALL dates and columns are required to be filled in COMPLETELY with necessary information  DT 1080 instructions in Utility Guide CHAPTER 15 PS&E DOCUMENTS - REVIEW AND TIMING  ALL UTILITY DOCUMENTS/MATERIALS SUBMITTED TO MC TWENTY- EIGHT(28) DAYS PRIOR TO FINAL PS&E DATE (FDM 19-1-1)  UTILITY SPECIAL PROVISIONS based on Municipality Approved utility work plans  USR reflects what is stated in APPROVED UTILITY WORK PLANS and SPECIAL PROVISIONS  COPIES of correspondence that documents commitments stated in PS&E SPECIAL PROVISIONS

5 KENOSHA COUNTY Local Program 2016-17 Construction #1 3766-00-70 CTH E Bridge Over Pike River (BR REPLACE) LET 01/10/2017 #2 3751-00-70 CTH W CTH F– CTH FR LET 03/14/2017 (RECONSTRUCT)

6 Local Program 2016-17 Construction MILWAUKEE COUNTY #1 2070-08-70 CTH Y INTERSECT W PENNSYLVANIA & WHITNALL LET 12/8/2015 (INTER IMPRVMNT) #5&6 2984-17-71/91 & 2984-04-77/97 W LLOYD STREET N 60TH ST TO W LISBON AVE 6 LOCAL INTERSECTIONS LET 3/8/2016 LFA 5/25/2016 (RECONSTRUCT) #2 2100-02-71/91 S. 35th STREET W MITCHELL ST TO W GREENFIELD AVE LET 2/9/2016 LFA 3/25/2016 (RECONSTRUCT) #7&8 2673-00-70 & 2987-00-70 NICHOLSON ROAD & MARQUETTE AVENUE BRIDGES OVER OAK CREEK LET 4/12/2016 (BR REPLACE) #3&4 2660-04-70 & 2981-00-72 WHITNALL PARK DR BRIDGES OVER TESS CORNERS CREEK & WHITNALL PARK CREEK LET 3/8/2016 (BR REPLACE) #9 2505-00-75/95 SOUTH 13TH STREET W FOREST HOME AVE TO W WINDLAKE AVE LET 4/12/2016 LFA 4/25/2016 (RECONSTRUCT)

7 MILWAUKEE COUNTY #15 2265-00-74/94 NORTH 27TH STREET HIGHLAND BLVD TO LISBON AVE LET 6/14/2016 LFA 6/25/2016 (RESURFACE) #13&14 2216-01-70 & 2216-02-70 WEST MILL RD & CTH G/CTH S INTERSECT N 43rd - TEUTONIA LET 05/10/2016 ( RECONSTRUCT ) #12 2595-00-71 NORTH 60TH STREET W FLORIST AVE TO W MILL ROAD LET 5/10/2016 (RESURFACE) Local Program 2016-17 Construction #10&11 2987-00-14 5th AVENUE RELOCATION STH 32 TO RYAN ROAD LET 4/12/2016 (RECONSTRUCT/EXPANSION) #16 2504-00-71/91 NORTH 91ST STREET W MILL ROAD TO W GOOD HOPE ROAD LET 12/13/2016 LFA 12/25/2016 (RECONSTRUCT) #17 2160-01-72 CTH U INTERSECTION OF CTH U AND CTH BB LET 12/13/2016 (INTER IMPRVMNT) #18 2984-07-75 N 51 ST STREET BRIDGES OVER LINCOLN CREEK LET 3/14/2017 (BR REPLACE)

8 MILWAUKEE COUNTY #21 2984-00-73/93 WEST VLIET STREET N 27TH ST TO N 12TH ST LET 3/14/2017 LFA 3/25/2017 (RECONSTRUCT) Local Program 2016-17 Construction #23&24 2981-00-73 & 2981-00-74 WHITNALL PARK DR BRIDGES OVER ROOT RIVER (P-40-0564 & P-40-0565) LET 3/14/2017 (BR REHAB) #19&20 2585-00-70 & 2595-08-70/90 NORTH 92ND STREET & N 60TH ST/W HAMPTON AVE INTERSECTION W CAPITOL DR TO W HAMPTON AVE & 11 LOCAL STREET INTERSECTIONS LET 03/14/2017 LFA 3/25/2017 (RESURFACE/INTER IMPRV) #25 2160-15-70 S 76 th STREET (CTH U) INT WITH EDGERTON & LAYTON AVE LET 3/14/2017 (INTER IMPRVMNT) #22 2980-00-70 W EDGERTON AVENUE W LOOMIS RD - S 27TH ST LET 3/14/2017 (RECONSTRUCT) #26 2080-00-73 NORTH TEUTONIA AVE W GARFIELD TO W GROELING AVE LET 03/14/2017 (RECONSTRUCT)

9 OZAUKEE COUNTY #1 2697-00-75 MAIN STREET DIVISION ST TO CONCORD PL LET 11/10/2015 (RESURFACE) Local Program 2016-17 Construction #2 2695-10-70 CTH V INTERSECTION WITH CTH W LET 4/12/2016 (INTER IMPRVMNT)

10 RACINE COUNTY #2 2699-02-70 MALCINE ROAD BRIDGE OVER WIND LK DRAINAGE CANAL LET 4/12/2016 (BRI REPLACE) #3 3756-01-70 CTH FF CTH DD TO WEST STREET LET 08/09/2016 (MISC) #4 2703-00-71 MEMORIAL DRIVE BRIDGE OVER ROOT RIVER LET 1/10/2017 (BR REHAB) #1 3755-00-71 CTH D (WASHINGTON AVE.) BRIDGE OVER FOX RIVER LET 11/10/2015 (BR REPLACE) Local Program 2016-17 Construction

11 WALWORTH COUNTY #1 3841-00-71 BORG RD BRIDGE OVER SWAN CREEK LET 11/10/2015 (BR REPLACE) #2 3840-00-71 CTH H VOSS ROAD TO CTH A LET 3/14/2017 (RECONDITION) Local Program 2016-17 Construction

12 WASHINGTON COUNTY #1 4869-00-72 CTH D BRIDGE OVER KOHLSVILLE RIVR LET 5/10/2016 (BR REPLACE) Local Program 2016-17 Construction

13 WAUKESHA COUNTY #3 2718-03-71 GRANDVIEW BLVD. NORTHVIEW RD TO SUMMIT AVE LET 12/13/2016 (INTER IMPRVMNT) #1 2714-04-70 SAWYER RD (CTH P) BRIDGE OVER BARK RIVER LET 11/10/2015 (BR REPLACE) #2 2758-04-70 CTH JJ INTERSECTION WITH SILVERNAIL LET 3/8/2016 (INTER IMPRVMNT) Local Program 2016-17 Construction #4 2753-01-70 CTH VV (SILVER SPRING RD) INTERSECT WITH LILLY ROAD LET 2/14/2017 (INTER IMPRVMNT) #4 2790-00-70 CTH I (BELOIT RD) NATIONAL AVE TO MOORLAND RD LET 3/14/2017 (RECONDITION) #5 3854-01-70 CTH CI WAUKESHA CO LINE TO STH 67 LET 4/11/2017 (MISC)

14 Thank You for Listening! We Look Forward to working with You. Questions/Answers