PTC Project Update 13 th June 2013 1.Advantages of Services of PTC – By Chin Szi Chu’en 2.PC GTN Process Flow– By May (PC Mgr) 4. PTC Update – By Zaid.

Similar presentations


Presentation on theme: "PTC Project Update 13 th June 2013 1.Advantages of Services of PTC – By Chin Szi Chu’en 2.PC GTN Process Flow– By May (PC Mgr) 4. PTC Update – By Zaid."— Presentation transcript:

1 PTC Project Update 13 th June 2013 1.Advantages of Services of PTC – By Chin Szi Chu’en 2.PC GTN Process Flow– By May (PC Mgr) 4. PTC Update – By Zaid (PTC Mgr)

2 1 Volume Growth – PTC Delivery Route

3 2 Volume Growth – 3 New Stores Update

4 3 PC Delivery Integration Route PTC PC PTC BP STORE 2 PTC STORE 1 Truck has to stop at BP for Sushi. PTC

5 4 Delivery Cost – Processing Centre 1.Assumption is made that GTN amount is 110% & 93% against LY. 2.PC continues to use only one 18T truck until end of the year. 3.PC stop using all existing trucks & drivers. 1.Assumption is made that GTN amount is 110% & 93% against LY. 2.PC continues to use only one 18T truck until end of the year. 3.PC stop using all existing trucks & drivers. LY 110% LY 93%

6 5 PC Delivery Integration – GTN Process PeriodPCPTCStores Transition (Jul 2013 to Oct 2014) 1.Put standard (preset) qty in trays. 2.Generate GTN 3.Stack & count trays in cart-rack. 4.Put GTN inside PC Document Bag. 5.Load cart-rack into trucks. 6.Deliver products 1.Receive Products in cart- rack. 2.Check GTN from Document Bag. 3.Check & confirm trays qty in cart-rack. 4.Sort according to destination. 5.Load cart-rack into trucks. 6.Deliver to stores. 1.Check GTN from Document Bag. 2..Receive Products in cart- rack. 3.Check & confirm trays qty in cart-rack. 4.Update GTN 5.Push product for display or final preparation process. New PTC (from 1 st Nov 2014) 1.Put standard (preset) qty in trays. 2.Key in trays qty in HHT. 3.Stack trays on cart-rack. 4.Scan DI barcode on cart-rack 5.Upload data from HHT. 6.Deliver products in cart- rack. 1.Receive Products in cart- rack. 2.Download data into HHT. 3.Check qty-to-be-received from HHT. 4.Check & confirm trays qty in cart-rack 5.Scan DI barcode on cart- rack. 5.Sort according to destination. 6.Load cart-rack into trucks. 7.Key in truck reg. no. in HHT. 8.Upload data from HHT. 9. Deliver products in cart- rack. 1.Receive Products in cart- rack. 2.Download data into HHT. 3.Scan DI barcode on cart- rack. 4.Check & confirm trays qty on cart-rack 5.Update in HHT to confirm receipt. 6.Upload data from HHT. 7.Push product for display or final preparation process.

7 6 Daily & Dairy Requirement Merchandising expectation in order to proceed: a)Commencement date b)Initial volume estimation i)by supplier (e.g. Nestle etc.) ii)by stores (e.g. KV, Northern, Southern etc.) c)Receiving process (e.g. for transition period, for new PTC) d)Delivery frequency (e.g. 1 time or 2 times per day) e)ETA at stores (e.g. after 10.00am before 1.00pm for KV stores) f)CCN roles at stores (e.g. transfer from loading bay until chiller/freezer room)

8 7 Quality Checked Sticker 1.RM370 for 50,000pcs (MOQ). 2.Target to start from 1 st Aug 2013. 3.Cartons checked will be stuck with this sticker. QUALITY CHECKED No confirmation with supplier yet. No PO issued yet.

9 8 SOP – Late Arrival of PTC Truck 1.Currently, no SOP. 2.Just inform MMD when CCN share info about new ETA. 3.Target to share with all members by next meeting.

10 End


Download ppt "PTC Project Update 13 th June 2013 1.Advantages of Services of PTC – By Chin Szi Chu’en 2.PC GTN Process Flow– By May (PC Mgr) 4. PTC Update – By Zaid."