Presentation is loading. Please wait.

Presentation is loading. Please wait.

BASF Company Ltd/QM&EHS 1 BASF March 7, 2001 BASF Company Ltd.

Similar presentations


Presentation on theme: "BASF Company Ltd/QM&EHS 1 BASF March 7, 2001 BASF Company Ltd."— Presentation transcript:

1 BASF Company Ltd/QM&EHS 1 BASF March 7, 2001 BASF Company Ltd.

2 BASF Company Ltd/QM&EHS 2 BASF 1. BASF History in Korea 2. Site of BASF Company 3. Production Capacity 4. Responsible Care Organization 5. Responsible Care Activities 6. Multi Year Target 7. Action Plan of 2001 8. Current Status Attachments - Audit & Self Assessment Result Contents

3 BASF Company Ltd/QM&EHS 3 BASF ’54’78’79’82’88’97.12’98.3’98.9’98.12 FOHAG BKL (100%BASF) Colorchem HBC (50%BASF) BUK (100%BASF ) HBU (50%BASF) BSK (100%BASF) BK (100%BASF) BK (100%BASF) Lysine Polyol 5 1. BASF History in Korea

4 BASF Company Ltd/QM&EHS 4 BASF MNB/Aniline/MDI/PUR Chemicals:PTHF/ BDO&THF/Polyol Plastics: ABS/PS/EPS N w E S Lysine ULSAN SEOUL YOSU KUNSAN 2. Site of BASF Company

5 BASF Company Ltd/QM&EHS 5 BASF 3.Production Capacity

6 BASF Company Ltd/QM&EHS 6 BASF 4. Responsible Care organization

7 BASF Company Ltd/QM&EHS 7 BASF 5. Responsible Care Activities (1/5) 1999. 3 Kick-off meeting to promote RC program in BK - Introduction of RC concept and current status of RC activities in Korea - Introduction of BASF guidelines and current status of each sites 1999. 5 2nd RC Meeting - Introduction of CMA codes of practice and other company’s - Management code allocation to each site EHS team head Preparation of RC promotion plan Organization of RC Steering Committee and RC Working Group Preparation on format for self assessment checklist 1999. 6 3rd RC Meeting - Discussion about “Incident investigation and reporting procedure” - Discussion about principles for self assessment checklist

8 BASF Company Ltd/QM&EHS 8 BASF 5. Responsible Care Activities (2/5) 1999. 7 Preparation of “Incident investigation and reporting procedure” Preparation of Self assessment checklist 4th RC Meeting - Introduction of Dupont’s RC implementation status - Review of Self assessment checklist 1999. 8 Updating of Self assessment checklist Carrying out of self assessment by each site EHS team head 5th RC Meeting - Preparation of self assessment result by each site EHS team head - Discussion on problems occurred during carrying out of self assessment - Unification of each evaluation stage concept-NA,EV,DP,IA,PP & RI

9 BASF Company Ltd/QM&EHS 9 BASF 5. Responsible Care Activities (3/5) 1999. 9 Reassessment of RC situation of each site according to the same assessment criteria and method 6th RC Meeting - Fix the format used for 2000’s RC implementation plan - Fix the scheme of RC training materials for employees - Discussion on MSDS and HMS - Discussion on RC Implementation Procedure 1999. 10 Preparation of RC training materials Preparation of RC standards - MSDS preparation procedure (include HMS) - RC implementation procedure Under preparing of 2000’s RC implementation plan 1999. 11 Carrying out of RC training for employees ~ 12 Completion of 2000’s RC implementation plan Republishing of updated self assessment checklist

10 BASF Company Ltd/QM&EHS 1010 BASF 5. Responsible Care Activities (4/5) 2000. 1 1st RC Meeting - Presentation of RC implementation plan of year 2000 by each site - Review of RC performance of year 1999 2000. 3 2nd RC Meeting - Introduction of PL - Review of RC audit plan - Discussion on System integration of QM, EM and SM - Introduction of 7 elements and STOP program 2000. 6 3rd RC Meeting - Discussion on workshop for site directors - Discussion on “Road show on waste management” - Discussion on Self assessment for year 2000 2000. 8 Carrying out of self assessment Workshop on 7 element

11 BASF Company Ltd/QM&EHS 1 BASF 5. Responsible Care Activities (5/5) 2000. 10 5th RC Meeting & 1st Workshop for site directors - Introduction of best practices which will be presented at Road show - Introduction & review of self assessment result - Discussion on crisis management - Discussion on RC Implementation Procedure 2000. 12 6th RC Meeting - Discussion on improvement of self assessment checklist - Scheduling on QM&EM integration auditor training program, internal audit and external audit - Review of follow-up actions in line with customer satisfaction index survey result - Discussion on major activities for year 2000 Carrying out of QM&EM integration auditor training program 2001. 1 1st RC Meeting with site directors - Presentation of 2000’s implementation result & 2001’s plan - Introduction on safety workshop scheduled in Feb.

12 BASF Company Ltd/QM&EHS 1212 BASF 6. Multi Year Target

13 BASF Company Ltd/QM&EHS 1313 BASF 7. Action Plan of 2001

14 BASF Company Ltd/QM&EHS 1414 BASF 8. Current Status (1/3) ● Environmental protection - Implementation of EMS (ISO 14001) PU(April, ‘98), TP(May, ‘99), CT(Oct.,2K) -> Certified by KFQ, as a member of IQ-Net - Operating TRI system(PU & TP) - No environmental accident & release recorded in 2000 ● Employee health & safety - Implementation of OM&HP program - Implementation of OHSMS TP(Mar., 2K), CT(Mar., 2K), PU(May, 2K) -> Certified by KOSHA - Preparation of HMS

15 BASF Company Ltd/QM&EHS 1515 BASF 8. Current Status (2/3) ● Process safety - Implementation of PSM system and Completion of HAZOP study for debottlenecking project in 2000 - Implementation of “Near-miss” and “Safety Short Talk” system ● Distribution safety - Under preparing of emergency preparedness & response program in transit to minimize the impact of accident - Distribution of product handling booklets or safety leaflets - Inspection of transportation vehicles and shipping area - Training of driver

16 BASF Company Ltd/QM&EHS 1616 BASF 8. Current Status (3/3) ● Product stewardship - Completion of MSDS standardization (200 items) - Preparation of Product handling procedure (property, handling & disposal) - Development of Eco-indicator of Poly styrene ● Communication (CAER) - Maintain good relationship with local community. Publishing Safety bulletin. Communication with neighbors and interested party about safety & environmental information and emergency plan. Establishment of site emergency network. Invitation to site - Implementation of periodic emergency drill

17 BASF Company Ltd/QM&EHS 1717 BASF ● SHE Audit Result ● Self Assessment Result Attachments

18 BASF Company Ltd/QM&EHS 1818 BASF (Aniline/MNB/HYCO plant)(MDI plant) Company/Site: BASF Company Ltd., Yosu/Korea, SHE audit result

19 BASF Company Ltd/QM&EHS 1919 BASF SHE audit result

20 BASF Company Ltd/QM&EHS 2020 BASF Self Assessment Result

21 BASF Company Ltd/QM&EHS 2121 BASF Self Assessment Result

22 BASF Company Ltd/QM&EHS 2 BASF Self Assessment Result

23 BASF Company Ltd/QM&EHS 2323 BASF Self Assessment Result

24 BASF Company Ltd/QM&EHS 2424 BASF Self Assessment Result

25 BASF Company Ltd/QM&EHS 2525 BASF Self Assessment Result

26 BASF Company Ltd/QM&EHS 2626 BASF Self-assessment Check list (Sample) Self Assessment Result


Download ppt "BASF Company Ltd/QM&EHS 1 BASF March 7, 2001 BASF Company Ltd."

Similar presentations


Ads by Google