Presentation is loading. Please wait.

Presentation is loading. Please wait.

CADLink: Integrate SW/EPDM to ERP. W HO ARE WE ? We connect engineering data with ERP production data.

Similar presentations


Presentation on theme: "CADLink: Integrate SW/EPDM to ERP. W HO ARE WE ? We connect engineering data with ERP production data."— Presentation transcript:

1 CADLink: Integrate SW/EPDM to ERP

2 W HO ARE WE ? We connect engineering data with ERP production data

3 WHAT ARE CUSTOMERS DOING NOW?

4 B RUTE F ORCE Engineering or Planning department takes data from drawings and manually types into ERP Features Zero software cost Error prone Time consuming Positioning Small engineering departments Mfg of simple, repetitive products

5 Single integration point for data exchange between SW/EPDM and ERP Features: Seamless data integration Significant time savings, error reduction Limited approval system Positioning Medium sized engineering departments Manufacturing of make to order products or complex repetitive products CADLink

6 I NTEGRATE CAD Integrate and synchronize EPDM data with ERP

7 Features  Direct link to:  Epicor 9, Vantage, Vista  Dynamics AX/NAV  Infor SyteLine, Visual  Push ERP description onto the drawing/model  Push Revision information to PDM and ERP Database  Update Items, Bills Of Material and Operations directly from PDM  Tie critical dimensions to your ERP BoM quantities CADL INK -

8 Benefits  Eliminate Engineering Clerical Work  Cut Design Cost  Reduce Design Cycle Time  Reduce Data Entry Errors  Ensure consistent data between SW/EPDM and ERP  Reduce Bill Of Material errors by tying dimensions directly to BOM quantities

9 CADL INK Right click on the model and select “RUN CADLINK”

10 CADL INK Select the BOM you want to push and sync with your ERP

11 CADL INK

12 Bill Of Material information is pulled from Models and displayed for the Engineer in this grid. Discrepancy between CAD and ERP Data are highlighted

13 CADL INK Multi Level Bill Of Material

14 CADL INK UOM table is taken directly from your ERP Database

15 CADL INK Bill of Material Changes Summary shows only the BOM changes that will be made to your ERP

16 CADL INK BOM Data Entry 8 Eng X 1 hour per day = 2000 hours Cost Justification Shop Floor Confusion 1 scrapped part per year 12 late shipments per year Total Savings of $65,000 per year

17 QBuild Corporation 145 Renfrew Drive, Unit 140 | Markham, ON L3R 9R6 | CANADA Phone +1 905 479 7811 EXT 224 Fax +1 905 479 2636 Email: info@qbuildsoftware.cominfo@qbuildsoftware.comwww.qbuildsoftware.com


Download ppt "CADLink: Integrate SW/EPDM to ERP. W HO ARE WE ? We connect engineering data with ERP production data."

Similar presentations


Ads by Google