Download presentation
Presentation is loading. Please wait.
Published byMarion Greene Modified over 8 years ago
1
© XchangePoint Holdings Ltd 2003 RIPE 44 EIX WG Update Keith Mitchell Chief Technical Officer 29th January 2003
2
© XchangePoint Holdings Ltd 2003 XchangePoint History February 2003:Hamburg site live January 2003:70 customers on London platform to date May 2002: Switched first IPv6 traffic February 2002: First interconnect with another IXP October 2001: Successful completion of beta trial June 2001:Launch of interconnect platform March 2001:First site operational February 2001: Funding secured October 2000: Core team recruited August 2000: Company founded
3
© XchangePoint Holdings Ltd 2003 Recent Growth and Current Status Now 70 customers see http://customer.xchangepoint.net Includes: 5 major ‘PTT’s major US OLSP 20+ other European ISPs 30+ small UK ISPs choice of transit from over 10 major ISPs Ethernet circuit providers ADSL aggregation providers
4
© XchangePoint Holdings Ltd 2003
5
Interconnect Architecture Present at multiple co-location sites per city Dark fibre metro ring connecting all sites in city Black Diamond 6808i or Alpine 3804 switches DWDM equipment Gigabit Ethernet between switches and sites 10-Gigabit capable
6
© XchangePoint Holdings Ltd 2003 London Locations Currently live Redbus Interhouse: Harbour Exchange Memaco House Sovereign House Telehouse: North East Global Switch: East India During Feb 2002 TeleCity: Harbour Exchange Telehouse: Hamburg
7
© XchangePoint Holdings Ltd 2003 Current Traffic - http://traffic.xchangepoint.net Switched traffic: public & private peering & transit Remains steady at 250-300Mb/s Significant growth in demand for inter-site DWDM private interconnect traffic Mixture of Gigabit Ethernet and SDH STM-1/4/16 ~10Gb/s DWDM port capacity provisioned to date DWDM between 4 original sites Adding CWDM for additional 3 sites
8
© XchangePoint Holdings Ltd 2003 Recent Developments Formal interconnect agreement with LoNAP .uk secondary name server live Upgraded all switches to ExtremeWare 6.2.2 build 56 less painful to upgrade to than build 27 ! Amending AUP to allow controlled connection of 3rd- party switches and ethernet circuits Transit Marketplace remains highly successful next event London 27th February Close to securing funding for additional European cities at least 2 more during 2003
9
© XchangePoint Holdings Ltd 2003 Contact Details CTO:Keith Mitchell Business Development:Gian Walker Web:www.xchangepoint.net E-mail:info@xchangepoint.net Phone:+44 20 7395 6020 Presentations: http://www.xchangepoint.net/info/ripe44-eix.ppt http://www.xchangepoint.net/info/Xchange-LoNAP.ppt
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.