Download presentation
Presentation is loading. Please wait.
Published byLaurence Tyrone Higgins Modified over 8 years ago
1
LED Work light Of NSSC Group What is our comparative preponderance?
2
Product Catalogue Performance Special Design Housing Cree chip & Wide Voltage High Lumen Other suppliers Waterproof level Low temperature Test NSSC GROUP Customers Feedbacks NSSC Work light production line Procedure
3
Performance NS-WL-RD 35W/ NS-WL-RD 50W Special Design housing, Unique connector design Runs on 9-32V Cree 5W /10W High Power LED Chips High Lumen 5000LM/6900LM IP68 waterproof,Shockproof & rust-proof Electrically protected against RFI/EMC interference
4
Special Design Housing Special Design housing, Unique connector design IP68 waterproof sealed metal connector NSSC Group VS Aurora Others
5
50W work light Cree chip & Wide Voltage
6
Other suppliers Operating Voltage:9-36V LED:5W High Power Cree chip, 5000LM IP68 Certified, CE, Rohs Compliant Warranty: Lifetime warranty Compare with SCLIGHTS & Aurora & Sam moon Aurora Sam moon SCLIGHTS
7
Why choose NSSC? Our LED work light compare with Aurora & Sammoon & SClight, you could find the difference in the picture. That with wide voltage, good quality of Cree led, high waterproof level, high Lumen and also long time warranty. Why not choose NSSC?
8
NSSC 35w work light specification
9
NSSC 50w work light specification
10
Light effect PK
11
High waterproof level IP68 waterproof sealed metal connector
12
Compare with others
13
Plug and play Sealed Deutsch Connector
14
low temperature Test
15
NSSC GROUP longer main parts is anodized and the side parts ( die cast) is using special power coati ng treatment. (1)apply road lamp treatment in work light surface (2) 800 hours testing for anti - sore and salty (3) keep color for a very long time. It never turns brown and occurs Hanma's case. (4)To use special anodized chemistry imported with very good quality to make it never color declined.
16
The Equipment that testing Lumen, waterproof, shockproof and acid-base
17
Customers’Feedback
18
NSSC Work light production line
19
Procedures 1 How we deal with these projects on New projects: New projects Required for original bumper Make 3D design for approval After confirmation, make handmade samples Send for confirmation After confirmation, process with moulding
20
Procedures 2 How we deal with these projects: 35-45days of moulding Moulding testing sample Send for customer’s check and confirmation After confirmation, process with bulk production Packing design confirmed, 20- 25days production Shipment delivered
21
Cooperation with NSSC
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.