2
Our nation’s freight transportation system is a vast, complex network of almost seven million miles of highways and local roads, railways, navigable waterways, and pipelines.
3
Our freight system is more than just infrastructure… 2.5 million combination trucks; millions of single unit trucks and vans; 24,000 diesel-electric locomotives; 1.28 million freight rail cars; 38,600 domestic maritime vessels; and 700 domestic all-cargo aircraft all operate in this system. 3.1 million Americans are employed in operating and supporting freight vehicles, as well as in logistics. 44 million jobs directly depend on freight transportation.
4
Freight transportation makes our economy and quality of life possible. Each day, our freight system transports 55 million tons of goods, worth more than $49 billion.
5
Our freight transportation is safer, more environmentally friendly, and imposes fewer adverse impacts on most communities today than in past decades. Even so, increasing challenges have placed our freight system under serious strain. The National Freight Strategic Plan (NFSP) discusses six major trends affecting freight transportation and the challenges they present.
6
Expected Growth in Freight Tonnage Underinvestment in the Freight System Difficulty in Planning and Implementing Freight Projects Continued Need to Address Safety, Security, and Resilience Increased Global Economic Competition Application and Deployment of New Technologies Six Key Trends and Challenges in Freight Transportation
7
Expected Growth in Freight Tonnage
8
Underinvestment in the Freight System
9
Due primarily to retirement and turnover, employers will need to hire and train a total of 4.6 million employees—like truck drivers and maintenance technicians—from 2012 to 2022. There are 68% more job openings than the number of students entering the workforce.
10
Difficulty in Planning & Implementing Projects Most of our publicly owned freight system is planned and managed by State and local governments, as well as by Metropolitan Planning Organizations (MPOs). These agencies must work with each other and a broad array of Federal and private sector partners.
11
Difficulty in Planning & Implementing Projects This decentralized approach has many benefits, including greater flexibility to identify and react to local needs…. But, this approach presents a number of challenges, including: Fragmented decision-making. Competing local and regional needs. Freight projects that are often less competitive for funding when compared to more traditional projects.
12
Need to Address Safety, Security, & Resilience Between 1990 and 2011… 27% increase in freight ton-miles 33% decrease in freight-related fatalities However, more progress must be made. In 2013, 543 people died in incidents associated with freight rail, vessel, and pipeline operations. 3,964 people were killed in crashes involving large trucks.
13
Need to Address Safety, Security, & Resilience
14
Since 9/11, freight movements to ports have been increasingly inspected. But, new technologies are creating new vulnerabilities… New security protocols should not exacerbate other issues affecting the efficiency of freight flows. Increasing interdependencies between physical and cyber infrastructures make our freight transportation system particularly vulnerable to human-engineered events of terrorism.
15
Increased Global Economic Competition
16
With growing international trade and shifting trade patterns, our freight system is becoming more complex and sophisticated. Ports are becoming increasingly automated. There are signs offshoring is slowing or reversing. Since 2010, more than 200 companies have brought back production they had sent out of the country. Changing and shifting international trade environments could have ramifications in the U.S. The expansion of the Panama Canal and economic growth in South Asia and Africa may lead to increased traffic at some Gulf and East Coast ports.
17
Application and Deployment of New Technologies The freight industry is experiencing a technological revolution as information and communications technologies are applied to optimize global supply chains. We foresee: Better data collection and analysis capabilities. Growth in autonomous vehicle technologies. Automated and expedited inspection processes. New opportunities and challenges to improve safety and security.
18
The NFSP presents solutions and strategies to address the infrastructure, institutional, and financial bottlenecks that hinder the safe and efficient movement of goods. Strategies
19
Infrastructure bottlenecks are physical locations that disrupt the free flow of goods, including: Bridges, Border crossing facilities, At-grade railroad crossings, and Truck gates at ports. Infrastructure Bottlenecks
20
Reduce congestion to improve performance. Improve the safety, security, and resilience of the freight transportation system. Facilitate intermodal connectivity. Identify major trade gateways and multimodal national freight networks/corridors. Mitigate impacts of freight projects/movements on communities. Support research and promote adoption of new technologies and best practices. Infrastructure Strategies
21
Institutional Bottlenecks Institutional bottlenecks make it difficult to plan, prioritize, implement, and fund freight projects. U.S. DOT and its many partners each have processes in place to plan for, review, permit, and implement transportation projects. Stakeholders may have different capabilities, priorities, and objectives that must be reconciled to effectively plan and implement projects.
22
Institutional Strategies Streamline project planning, review, permitting, and approvals. Facilitate multijurisdictional, multimodal collaboration and solutions. Improve coordination between public and private sectors. Ensure availability of better data and models. Develop the next generation freight transportation workforce.
23
Financial Bottlenecks It is critical to establish Federal freight transportation funding that is substantial, continuing, multimodal, reliable, and specifically dedicated to freight transportation projects. The availability of such funds would assure States, MPOs, and local governments that major freight transportation projects could be funded and completed.
24
Financial Strategies Ensure dedicated freight funding. Use existing grant programs to support freight. – TIGER program – Build America Transportation Investment Center (BATIC)
25
The proposed Multimodal Freight Network (MFN) map informs planners, private sector stakeholders, and the public about where major freight flows occur and where special attention to freight issues may be most warranted. Multimodal Freight Network Map To develop a sound and effective national freight strategy, we need to be mindful of the freight facilities, networks, and trade gateways that are critical for freight movement across the nation.
26
The MFN map contains… 65,000 miles of highways, including the entire Interstate System. 49,900 miles of the highest volume Class I rail routes and the full strategic rail corridor network (STRACNET). America’s Marine Highway routes. 78 ports that collectively handle 90 percent of the nation’s waterborne container and bulk cargo movements. 56 airports that handle approximately 90 percent of the nation’s air cargo. The 75 largest highway-rail intermodal transfer facilities by volume.
27
MFN Map
28
U.S. DOT is accepting comments on the Draft National Freight Strategic Plan. Share your ideas at: www.transportation.gov/freight